Upload Button Icon Add office photos

Filter interviews by

PNC Infratech Senior Manager Materials Interview Questions and Answers

Updated 30 Jan 2024

PNC Infratech Senior Manager Materials Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jan 2023. There were 3 interview rounds.

Round 1 - HR 

(3 Questions)

  • Q1. Why can you quit current Job
  • Q2. How much your salary expectation
  • Q3. When you join us
Round 2 - Coding Test 

Many SAP codes were asked

Round 3 - Personality Assessment 

(3 Questions)

  • Q1. Asked about current organization
  • Q2. Asked about the working culture of current organization
  • Q3. Suggest for job stability
  • Ans. 

    To ensure job stability as a Senior Manager Materials, focus on continuous learning, building strong relationships, and adapting to industry changes.

    • Continuously update your knowledge and skills in materials management and related areas.

    • Build strong relationships with suppliers, vendors, and other stakeholders to ensure a reliable supply chain.

    • Stay updated with industry trends and technological advancements to adapt to...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Focus on SAP T Code

Interview questions from similar companies

I applied via Referral and was interviewed in Sep 2021. There were 3 interview rounds.

Interview Questionnaire 

8 Questions

  • Q1. How did plan controlling project material?
  • Ans. 

    Project material was controlled by creating a detailed plan and monitoring inventory levels.

    • Developed a comprehensive project plan that included material requirements and timelines

    • Monitored inventory levels to ensure materials were ordered and received in a timely manner

    • Collaborated with suppliers to ensure timely delivery of materials

    • Implemented a system to track material usage and waste

    • Regularly reviewed and updated ...

  • Answered by AI
  • Q2. How did store the material and preservation?
  • Ans. 

    Materials are stored according to their specific requirements for preservation.

    • Materials are stored in appropriate containers or packaging to prevent damage or contamination.

    • Temperature and humidity levels are monitored and controlled as necessary.

    • Materials are labeled with information such as date received, expiration date, and storage requirements.

    • Regular inspections and inventory checks are conducted to ensure prope...

  • Answered by AI
  • Q3. As per vendor and Clint requirement material to stored. Every week preservation to be done store material s.
  • Q4. How did store E&I panels?
  • Ans. 

    E&I panels should be stored in a dry and clean area with proper labeling.

    • Store panels in a dry and clean area to prevent damage from moisture and dirt.

    • Label the panels clearly to ensure easy identification and retrieval.

    • Store panels vertically to prevent warping or bending.

    • Use protective covers to prevent scratches or other damage.

    • Regularly inspect the panels for any signs of damage or wear.

    • Follow manufacturer's instru

  • Answered by AI
  • Q5. How did you receit material and documentation?
  • Ans. 

    As a Material Controller, I received material and documentation through various methods.

    • Received material through purchase orders and delivery notes.

    • Received documentation through email, physical copies, or online portals.

    • Verified the accuracy of material and documentation against the purchase order or request.

    • Checked for any damages or discrepancies and reported them to the appropriate department.

    • Maintained a record o...

  • Answered by AI
  • Q6. How do you inspection the materials?
  • Ans. 

    Materials are inspected by following established procedures and using appropriate tools and equipment.

    • Inspect materials upon receipt to ensure they meet specifications

    • Use measuring tools such as calipers and micrometers to check dimensions

    • Perform visual inspections for defects or damage

    • Conduct tests to verify material properties

    • Document inspection results and report any issues to appropriate personnel

  • Answered by AI
  • Q7. What's is your safety plan?
  • Ans. 

    My safety plan includes regular safety audits, employee training, and strict adherence to safety protocols.

    • Regular safety audits to identify potential hazards and address them promptly

    • Employee training on safety procedures and protocols

    • Strict adherence to safety protocols to minimize the risk of accidents

    • Proper use of personal protective equipment (PPE)

    • Emergency response plan in place in case of accidents or incidents

    • C...

  • Answered by AI
  • Q8. What are the type of material your receive in project store.
  • Ans. 1.Piping(pipe,pipe fittings, flange, valves, gasket & Bolts exc.. 2. mechanical ( compressor, vessel, Heat exchange, coloum, pump, boiler, Heater and related accessories. 3. E&I ( cable tray, cable, tray support, transformers, capacitor bank, GIS, Electrical panels, light pole, light fixture, instruments panels, workstation, FA & F&G materials, console, cable gland analyser, transmitter, pressure gauge
  • Answered Anonymously

Interview Preparation Tips

Interview preparation tips for other job seekers - Please appointment matrial technical knowledge personal only in store. He knows about Material store and traceability. If missing the material he is the one reponsible identify the materials time issue material to site.

Interview Questionnaire 

5 Questions

  • Q1. How many years work with construction field
  • Q2. Retaliated work
  • Q3. Concrete work
  • Q4. Pier and girder
  • Q5. Material purchase

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was a technical one but was majorly a stress test.
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Feb 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(4 Questions)

  • Q1. Handling of material,sop of safety
  • Q2. Fifo and paper work, sap
  • Q3. Some tipe of mistake in posting
  • Q4. Posting of mannual of in words &out words material

Interview Preparation Tips

Interview preparation tips for other job seekers - kindly suggest to me of you end for jab. do the helpful for me

I applied via LinkedIn and was interviewed in Sep 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Technically. Material operation
  • Q2. Basic, Previous work experience

PNC Infratech Interview FAQs

How many rounds are there in PNC Infratech Senior Manager Materials interview?
PNC Infratech interview process usually has 3 rounds. The most common rounds in the PNC Infratech interview process are HR, Coding Test and Personality Assessment.

Tell us how to improve this page.

PNC Infratech Senior Manager Materials Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 719 Interviews
Tata Projects Interview Questions
4.2
 • 414 Interviews
KEC International Interview Questions
4.1
 • 289 Interviews
Dilip Buildcon Interview Questions
4.0
 • 139 Interviews
G R Infraprojects Interview Questions
4.1
 • 130 Interviews
AtkinsRealis Interview Questions
4.0
 • 84 Interviews
View all

PNC Infratech Senior Manager Materials Reviews and Ratings

based on 1 review

3.0/5

Rating in categories

2.0

Skill development

4.0

Work-life balance

3.0

Salary

4.0

Job security

3.0

Company culture

3.0

Promotions

3.0

Work satisfaction

Explore 1 Review and Rating
Assistant Engineer
175 salaries
unlock blur

₹2 L/yr - ₹6 L/yr

Junior Engineer
107 salaries
unlock blur

₹2 L/yr - ₹4.1 L/yr

Assistant Manager
80 salaries
unlock blur

₹4.8 L/yr - ₹12.5 L/yr

Highway Engineer
54 salaries
unlock blur

₹2.7 L/yr - ₹7.2 L/yr

Site Engineer
49 salaries
unlock blur

₹1.7 L/yr - ₹7.2 L/yr

Explore more salaries
Compare PNC Infratech with

Ashoka Buildcon

4.1
Compare

IRB Infrastructure

4.0
Compare

Nagarjuna Construction Company

4.1
Compare

Simplex Infrastructures

3.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview