Filter interviews by
I applied via Referral and was interviewed in Mar 2021. There were 3 interview rounds.
I don't have the available data to answer this question.
Sorry, I don't have access to the current data on the number of PTR engaged at BT laying.
I suggest checking with the relevant department or team for the latest information.
The crusher make model and process of crushing depend on the type of material being crushed.
The make and model of the crusher will vary depending on the application and material being crushed.
The process of crushing also varies depending on the material and desired output size.
For example, a jaw crusher may be used for primary crushing of hard rock, while a cone crusher is more suitable for secondary or tertiary crushi...
posted on 21 Jul 2024
Materials can be received through purchase orders, deliveries, or transfers. The basic procedure involves receiving, inspecting, documenting, and storing the materials.
Materials can be received through purchase orders placed with suppliers.
Deliveries can be made directly to the storage location or to a designated receiving area.
Materials can also be received through transfers from other departments or locations.
The bas...
Client material receipt/BOQ items procedure involves thorough inspection, documentation, and verification.
Upon receipt of client materials, conduct thorough inspection for damages or discrepancies.
Document all received items in a log or system for tracking purposes.
Verify received items against the Bill of Quantities (BOQ) to ensure accuracy.
Report any issues or discrepancies to the relevant stakeholders for resolution...
Logistics management Suppy Chain internet and CV.
Organization Amazon, Udaan and Dehaat skills assessment the same important working support.
I was interviewed before Jan 2024.
The limit of pile settlement for vertiload testing is typically determined by the project specifications and design requirements.
The limit of pile settlement can vary depending on the type of structure being supported and the soil conditions
Common limits for pile settlement range from 10mm to 25mm
Settlement limits may also be specified in terms of a percentage of the pile diameter
Exceeding the allowable settlement limi...
IRC code for flexible pavement design
IRC: Indian Roads Congress
Flexible pavement design is covered in IRC:37-2012
IRC:37-2012 provides guidelines for design, construction, and maintenance of flexible pavements
Pile shifting limit refers to the maximum allowable movement of piles during construction.
Pile shifting limit is typically specified in the project specifications or design drawings.
Exceeding the pile shifting limit can lead to structural instability and potential failure.
Monitoring equipment such as inclinometers or settlement gauges may be used to track pile movement.
Adjustments to construction methods or pile design...
I applied via Naukri.com and was interviewed before Nov 2021. There were 3 interview rounds.
Ind AS 116 is a new accounting standard for lease accounting.
Ind AS 116 replaces the previous standard Ind AS 17.
It requires lessees to recognize all leases on their balance sheet.
Lessees must also separate lease components from non-lease components.
It impacts financial statements, ratios, and covenants.
It became effective from April 1, 2019.
Example: A company leasing a building must recognize the lease liability and r
posted on 5 Jan 2025
I applied via Recruitment Consulltant and was interviewed in Dec 2024. There was 1 interview round.
Process of Goods receive, Material Issuence ,Inventory control ,Gate Pass of Job work Material
posted on 26 Jan 2024
Introducing, departments related advice, wastage, cost control, handling store and material
posted on 8 Jul 2024
I applied via Naukri.com and was interviewed in Jun 2024. There was 1 interview round.
Costing for transmission line involves calculating the total expenses for materials, labor, equipment, and overhead costs.
Calculate the total length of the transmission line needed
Estimate the cost of materials such as cables, poles, insulators, and connectors
Factor in labor costs for installation and maintenance
Include equipment costs for specialized tools and machinery
Consider overhead costs such as permits, land acq...
Execution of transmission line involves planning, design, construction, and maintenance of power lines.
Planning involves route selection, environmental impact assessment, and obtaining necessary permits.
Design includes determining the type of towers, conductor size, and insulator selection.
Construction involves clearing the right-of-way, setting foundations, erecting towers, and stringing conductors.
Maintenance include...
I applied via LinkedIn and was interviewed in May 2023. There were 2 interview rounds.
Yes, I have store requirements to ensure smooth operations and customer satisfaction.
Yes, I have specific requirements for store layout and organization.
I require a certain level of inventory management to meet customer demand.
I have standards for customer service and employee training.
I may have specific technology or equipment requirements for the store.
Examples: specific shelving units, POS system, security cameras.
Effective material management is crucial for controlling stock in and out, maintaining inventory, and ensuring smooth loading and unloading processes.
Implementing a robust inventory management system to track stock levels and monitor movement
Regularly conducting stock audits to identify discrepancies and prevent stockouts or overstocking
Establishing efficient loading and unloading procedures to minimize delays and opti...
based on 9 reviews
Rating in categories
Assistant Engineer
174
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
109
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
79
salaries
| ₹0 L/yr - ₹0 L/yr |
Accountant
50
salaries
| ₹0 L/yr - ₹0 L/yr |
Accounts Officer
49
salaries
| ₹0 L/yr - ₹0 L/yr |
Ashoka Buildcon
IRB Infrastructure
Nagarjuna Construction Company
Simplex Infrastructures