Upload Button Icon Add office photos

Filter interviews by

Petrofac Engineering India PDS Designer Interview Questions and Answers for Freshers

Updated 20 Aug 2020

Petrofac Engineering India PDS Designer Interview Experiences for Freshers

1 interview found

PDS Designer Interview Questions & Answers

user image Anonymous

posted on 20 Aug 2020

I applied via Naukri.com and was interviewed in Feb 2020. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. Technical piping area
  • Q2. Tool test in pds
  • Ans. 

    Tool test in PDS is a process of evaluating the functionality and performance of various tools used in PDS.

    • Tool test helps in identifying the strengths and weaknesses of different tools.

    • It ensures that the selected tools are compatible with the PDS system.

    • Examples of tools that can be tested include piping design software, equipment modeling software, and structural analysis software.

  • Answered by AI
  • Q3. Pump suction discharge

Interview Preparation Tips

Interview preparation tips for other job seekers - piping area

Interview questions from similar companies

I applied via Referral and was interviewed in May 2019. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. What is dsr
  • Ans. 

    DSR stands for Daily Sales Report. It is a document that summarizes the sales activities and performance of a business on a daily basis.

    • DSR provides insights into daily sales trends and helps in tracking sales targets.

    • It includes information such as total sales, number of transactions, average transaction value, and sales by product or category.

    • DSR is used by managers to evaluate sales performance, identify areas for i...

  • Answered by AI
  • Q2. How did you check the stock and volume
  • Ans. 

    I used a combination of inventory management software, physical counts, and sales reports to check stock and volume.

    • Utilized inventory management software to track stock levels and monitor volume

    • Conducted regular physical counts to ensure accuracy of stock levels

    • Analyzed sales reports to identify trends and forecast future stock and volume needs

  • Answered by AI
  • Q3. What are the calculations in petrol pump
  • Ans. 

    Calculations in petrol pump involve measuring fuel quantity, calculating cost, and maintaining inventory.

    • Fuel quantity is measured using a flow meter or dipstick.

    • Cost is calculated based on the price per liter or gallon.

    • Inventory is maintained by tracking fuel deliveries and sales.

    • Calculations may also involve taxes, discounts, and loyalty programs.

    • Accuracy is crucial to prevent losses and ensure customer satisfaction.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Mostly need know the perfect calculations and observation and patience need

Skills evaluated in this interview

I applied via Recruitment Consulltant and was interviewed before Feb 2021. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. No questions only politics
  • Q2. Only Politics no value for knowledge.
  • Q3. Related questions about your family background and mounding

Interview Preparation Tips

Interview preparation tips for other job seekers - Do not attend the interview without preparing

Interview Questionnaire 

1 Question

  • Q1. They asking about Piping job and Statics equipment like exchanger vasel column।
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Jul 2023. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. About your present work
  • Q2. Piling railway mis design etc
Round 2 - HR 

(1 Question)

  • Q1. About your scope
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

Hi there good luck to you

Round 2 - Technical 

(1 Question)

  • Q1. What is Material management for you
  • Ans. 

    Material management involves planning, organizing, and controlling the flow of materials from acquisition to use or disposal.

    • Involves planning, organizing, and controlling materials

    • Ensures materials are available when needed

    • Optimizes inventory levels to minimize costs

    • Tracks and monitors material usage and waste

    • Coordinates with suppliers for timely delivery

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(5 Questions)

  • Q1. How many experience in civil Engineer line diploma BE etc and how many experience in industrial area oil and gas and etc
  • Q2. Diploma parcnetage and how many experience and quality and control your work and your planing and safety etc manpower handling billing and material bbs planning drawing reading etc
  • Q3. Work related planing and daily miting and how many men power and than lebour basis work and safety point tbt and next planning etc
  • Q4. So how many offers expact salary CTC etc
  • Q5. Ohk thank for interview questions
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com

Round 1 - Technical 

(5 Questions)

  • Q1. What about your self
  • Q2. Cpk and cpk difference
  • Ans. 

    Cpk and cpk are statistical measures used to assess the capability of a process to meet specifications.

    • Cpk measures how well a process can produce output within specification limits.

    • Cpk takes into account both the mean and the variation of the process.

    • Cpk is calculated as the minimum of (USL - mean) / (3 * standard deviation) and (mean - LSL) / (3 * standard deviation).

    • Cpk should be at least 1.33 to indicate a capable ...

  • Answered by AI
  • Q3. Proces audit defination
  • Q4. Product audit defination
  • Q5. IATF and ISO documentation

I applied via Naukri.com and was interviewed in Aug 2021. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. 1) self introduction 2) Previous company roles and responsibility 3) qms and iatf system 4) Supplier quality assurance 5) Supplier audit, visit, evaluation 6) Process audit and iqa 7) Closing NC with 8d re...
Round 2 - HR 

(5 Questions)

  • Q1. What are your salary expectations?
  • Q2. What is your family background?
  • Q3. Share details of your previous job.
  • Q4. Why are you looking for a change?
  • Q5. Tell me about yourself.

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare resume with simple and explain more about your experience
Update daily of your profile
Send mail to direct hr if they provide mail id
Interview experience
2
Poor
Difficulty level
-
Process Duration
4-6 weeks
Result
Not Selected

I applied via Walk-in and was interviewed before May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. 3d need split core cavity
  • Ans. 

    A split core cavity is necessary for creating 3D designs.

    • Split core cavity allows for easier removal of the final product from the mold.

    • It also allows for more complex designs to be created.

    • Examples include intricate jewelry designs and detailed automotive parts.

    • Split core cavity can be achieved through various methods such as using sliders or lifters.

    • It is important to consider the material being used and the desired

  • Answered by AI
  • Q2. Shrinkage of plastics
  • Ans. 

    Shrinkage of plastics is a common issue in injection molding.

    • Shrinkage occurs when the plastic cools and solidifies, causing it to contract.

    • Factors affecting shrinkage include material type, mold design, and processing conditions.

    • Compensating for shrinkage can be done by adjusting the mold or adding more material.

    • Examples of plastics prone to shrinkage include ABS, polycarbonate, and nylon.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Working on Toys mold

Skills evaluated in this interview

Petrofac Engineering India Interview FAQs

What are the top questions asked in Petrofac Engineering India PDS Designer interview for freshers?

Some of the top questions asked at the Petrofac Engineering India PDS Designer interview for freshers -

  1. tool test in ...read more
  2. technical piping a...read more
  3. pump suction dischar...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Nayara Energy Interview Questions
4.1
 • 80 Interviews
Sintex-bapl Interview Questions
3.8
 • 32 Interviews
Micro Plastics Interview Questions
3.8
 • 27 Interviews
Castrol Interview Questions
4.3
 • 23 Interviews
Lifelong India Interview Questions
3.8
 • 16 Interviews
View all
Principal Engineer
66 salaries
unlock blur

₹12 L/yr - ₹32.9 L/yr

Senior Design Engineer
49 salaries
unlock blur

₹8.2 L/yr - ₹19.3 L/yr

Piping Designer
48 salaries
unlock blur

₹4 L/yr - ₹14 L/yr

Design Engineer
43 salaries
unlock blur

₹4.6 L/yr - ₹14.2 L/yr

Senior Engineer
43 salaries
unlock blur

₹9.3 L/yr - ₹25 L/yr

Explore more salaries
Compare Petrofac Engineering India with

Nayara Energy

4.1
Compare

Supreme Industries

4.1
Compare

HPCL-Mittal Energy Limited

4.4
Compare

Ongc Petro Additions

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview