Filter interviews by
I applied via Recruitment Consulltant and was interviewed in Jul 2023. There were 2 interview rounds.
I applied via Referral and was interviewed in Aug 2023. There were 3 interview rounds.
MIS preparation involves collecting, analyzing, and presenting data to support decision-making within an organization.
Collecting relevant data from various sources
Analyzing the data to identify trends and patterns
Preparing reports and visualizations to present the findings
Using MIS software to streamline the process
Ensuring data accuracy and security
Regularly updating and maintaining the MIS system
I applied via Referral and was interviewed in May 2019. There were 3 interview rounds.
DSR stands for Daily Sales Report. It is a document that summarizes the sales activities and performance of a business on a daily basis.
DSR provides insights into daily sales trends and helps in tracking sales targets.
It includes information such as total sales, number of transactions, average transaction value, and sales by product or category.
DSR is used by managers to evaluate sales performance, identify areas for i...
I used a combination of inventory management software, physical counts, and sales reports to check stock and volume.
Utilized inventory management software to track stock levels and monitor volume
Conducted regular physical counts to ensure accuracy of stock levels
Analyzed sales reports to identify trends and forecast future stock and volume needs
Calculations in petrol pump involve measuring fuel quantity, calculating cost, and maintaining inventory.
Fuel quantity is measured using a flow meter or dipstick.
Cost is calculated based on the price per liter or gallon.
Inventory is maintained by tracking fuel deliveries and sales.
Calculations may also involve taxes, discounts, and loyalty programs.
Accuracy is crucial to prevent losses and ensure customer satisfaction.
I applied via Recruitment Consulltant and was interviewed in Feb 2022. There were 3 interview rounds.
I appeared for an interview in Aug 2024.
I have 5 years of experience in my current company, where I have managed a team of 10 employees and overseen various projects.
Managed a team of 10 employees
Oversaw various projects and initiatives
Responsible for setting goals and targets for the team
Collaborated with other departments to ensure project success
I applied via Company Website and was interviewed before Feb 2022. There were 2 interview rounds.
Cavitation is the formation of vapor bubbles in a centrifugal pump due to low pressure. NPSH stands for Net Positive Suction Head.
Cavitation occurs when the pressure at the pump inlet drops below the vapor pressure of the liquid, causing the formation of vapor bubbles.
These vapor bubbles collapse when they reach higher pressure areas, leading to damage to the pump impeller and reduced pump performance.
Cavitation can be...
Surging is a phenomenon in rotating equipment where the flow rate becomes unstable.
Surging occurs when the flow rate through a rotating equipment fluctuates due to changes in operating conditions.
It can lead to reduced efficiency, increased wear and tear, and potential damage to the equipment.
To manage lubrication in different rotating equipment, it is important to monitor and control the flow rate, viscosity, and temp...
posted on 31 May 2024
Process refers to a series of actions or steps taken to achieve a particular goal or outcome.
Process involves breaking down tasks into smaller steps
It often includes defining roles and responsibilities
Monitoring progress and making adjustments as needed
Examples: project management process, manufacturing process
About job profile, key interest on jobs, new challenges
based on 4 interviews
Interview experience
based on 51 reviews
Rating in categories
Deputy Manager
409
salaries
| ₹4.5 L/yr - ₹15 L/yr |
Senior Manager
317
salaries
| ₹10 L/yr - ₹33 L/yr |
Manager
280
salaries
| ₹7.7 L/yr - ₹24 L/yr |
Territory Sales Manager
234
salaries
| ₹8.5 L/yr - ₹26 L/yr |
Assistant Manager
232
salaries
| ₹3.8 L/yr - ₹10.3 L/yr |
Supreme Industries
Ongc Petro Additions
Sintex-bapl
PCBL Chemical Limited