Filter interviews by
I applied via Naukri.com
Cpk and cpk are statistical measures used to assess the capability of a process to meet specifications.
Cpk measures how well a process can produce output within specification limits.
Cpk takes into account both the mean and the variation of the process.
Cpk is calculated as the minimum of (USL - mean) / (3 * standard deviation) and (mean - LSL) / (3 * standard deviation).
Cpk should be at least 1.33 to indicate a capable ...
Top trending discussions
Hi there good luck to you
Material management involves planning, organizing, and controlling the flow of materials from acquisition to use or disposal.
Involves planning, organizing, and controlling materials
Ensures materials are available when needed
Optimizes inventory levels to minimize costs
Tracks and monitors material usage and waste
Coordinates with suppliers for timely delivery
I applied via Naukri.com and was interviewed in Aug 2021. There were 2 interview rounds.
Interview experience
based on 15 reviews
Rating in categories
Engineer
57
salaries
| ₹2 L/yr - ₹5 L/yr |
Assistant Engineer
48
salaries
| ₹1.5 L/yr - ₹4.6 L/yr |
Quality Engineer
40
salaries
| ₹1.5 L/yr - ₹4.8 L/yr |
Senior Engineer
36
salaries
| ₹3.5 L/yr - ₹8.2 L/yr |
Production Engineer
35
salaries
| ₹1.8 L/yr - ₹4.8 L/yr |
Philips
Bajaj Electricals
Havells
Crompton Greaves Consumer Electricals