I applied via campus placement at SGGS College of Engineering & Technology, Nanded
Top trending discussions
posted on 14 Feb 2024
I applied via campus placement at Pranveer Singh Institute of Technology, Kanpur and was interviewed in Aug 2023. There were 2 interview rounds.
Aptitude test
Group discussion
Personal interview
Topics on renewlbility
posted on 23 Mar 2023
I applied via Job Fair and was interviewed in Feb 2023. There were 3 interview rounds.
The number of starters used in our company varies depending on the specific projects and requirements.
The number of starters used in our company is not fixed and can vary from project to project.
We use starters for various electrical equipment such as motors, pumps, and compressors.
The quantity of starters required depends on the size and complexity of the electrical systems.
We follow industry standards and guidelines ...
There are 10 generators in our company.
Our company has invested in 10 generators for power backup.
The generators range from 50kVA to 500kVA.
Regular maintenance and testing is conducted to ensure their proper functioning.
The generators are strategically placed in different locations to ensure uninterrupted power supply.
The generator desal capacity in tank is not provided.
The question seems incomplete and unclear.
The question lacks context and details.
It is unclear what is being asked.
More information is needed to provide an answer.
The given information is not sufficient to solve the problem.
The question is unclear and lacks context. Please provide more information.
The question needs clarification on what is meant by 'desal construction'
It is unclear if the question is asking for the amount of construction completed in an hour or the amount of construction that can be completed in an hour
More information is needed on the specific project or location being referred to
The number of windings inside a transformer depends on its design and purpose.
The primary winding is connected to the input voltage source.
The secondary winding is connected to the load.
Transformers can have multiple windings for different voltage levels or phases.
The number of turns in each winding determines the voltage ratio of the transformer.
For example, a step-up transformer may have more turns in the secondary w...
posted on 14 Feb 2024
I applied via campus placement at Pranveer Singh Institute of Technology, Kanpur and was interviewed in Aug 2023. There were 2 interview rounds.
Aptitude test
Group discussion
Personal interview
Topics on renewlbility
posted on 7 Oct 2022
I applied via Naukri.com and was interviewed in Sep 2022. There were 3 interview rounds.
posted on 5 Sep 2023
I applied via Naukri.com and was interviewed in Mar 2023. There were 2 interview rounds.
posted on 3 Aug 2024
I applied via Recruitment Consulltant and was interviewed before Aug 2023. There was 1 interview round.
The motor is a device that converts electrical energy into mechanical energy to perform work.
A motor consists of a rotor and a stator, with the rotor rotating inside the stator.
Motors can be AC (alternating current) or DC (direct current) depending on the type of power source.
Common types of motors include induction motors, synchronous motors, and brushed or brushless DC motors.
Motors are used in various applications s...
Power system can be powered using various sources such as electricity from the grid, generators, solar panels, or batteries.
Power system can be connected to the grid to receive electricity from a utility company.
Generators can be used as a backup power source in case of outages or in remote locations.
Solar panels can be installed to harness energy from the sun and power the system.
Batteries can store excess energy for ...
posted on 6 Jun 2022
I was interviewed in May 2022.
I'm going to be a long day
The motor nameplate provides important information about the motor, such as its power rating, voltage, current, and efficiency. The transformer nameplate contains details about the transformer's capacity, voltage ratio, impedance, and cooling method.
Motor nameplate includes power rating, voltage, current, and efficiency
Transformer nameplate contains capacity, voltage ratio, impedance, and cooling method
Motor nameplate ...
Off load and on load OLTC and RTCC panels are used in electrical systems for voltage regulation and control.
Off load OLTC panel is used to change the tap position of the transformer when it is not energized.
On load OLTC panel is used to change the tap position of the transformer while it is energized.
RTCC (Remote Tap Changing Control) panel is used to remotely control the tap changing operation of the transformer.
Off l...
Principal Engineer
62
salaries
| ₹15 L/yr - ₹34 L/yr |
Senior Design Engineer
49
salaries
| ₹8.2 L/yr - ₹19.3 L/yr |
Piping Designer
49
salaries
| ₹4 L/yr - ₹14 L/yr |
Design Engineer
46
salaries
| ₹4.7 L/yr - ₹14.2 L/yr |
Senior Engineer
43
salaries
| ₹9.3 L/yr - ₹25 L/yr |
L&T Energy Hydrocarbon
TechnipFMC
McDermott International
Saipem