I applied via Company Website and was interviewed before Mar 2023. There was 1 interview round.
I primarily use JMeter for performance testing.
JMeter is an open-source tool used for load testing, performance testing, and functional testing.
It allows for simulating heavy loads on servers, networks, or objects to test their strength or analyze overall performance under different load types.
JMeter supports various protocols like HTTP, HTTPS, JDBC, LDAP, JMS, and more.
It provides features like thread groups, listener...
Yes, I am willing to join on client location if required.
I am open to joining on client location for the duration of the project
I understand the importance of being on-site for effective communication and collaboration
I have previous experience working on client location for performance testing projects
posted on 6 Feb 2024
I applied via Naukri.com and was interviewed in Jan 2024. There were 3 interview rounds.
Written paper as per site and codes
It’s about Quality and execution with VP and audit team
I applied via Approached by Company and was interviewed before Aug 2022. There were 4 interview rounds.
I applied via Company Website and was interviewed before Jun 2022. There were 3 interview rounds.
The cable size required for a 10 hp motor depends on the voltage and current rating of the motor.
The cable size should be selected based on the motor's full load current (FLC) and the voltage rating.
For a 10 hp motor, the FLC would typically be around 15-20 Amps.
A common cable size for a 10 hp motor operating at 415V could be 4 sq mm cable.
I have a strong understanding of electrical systems and am capable of troubleshooting and problem-solving in this area.
I have a degree in Electrical Engineering
I have completed multiple projects involving electrical systems
I have experience working with electrical equipment and tools
I have a good understanding of electrical codes and regulations
I applied via Referral and was interviewed in Sep 2022. There were 2 interview rounds.
posted on 20 Apr 2024
I applied via Company Website and was interviewed before Apr 2023. There were 2 interview rounds.
The finishing process involves plastering, painting, and final touches before handing over the completed project to the client.
Plastering is done to create a smooth surface on walls and ceilings.
Painting is then carried out to add color and protection to the surfaces.
Final touches may include installing fixtures, cleaning, and ensuring everything is in place for handover.
Quality control checks are essential at each sta
UPVC window components are parts used in the construction of UPVC windows, such as frames, sashes, glass panes, and hardware.
UPVC frames are the main structural component of the window
Sashes are the movable parts that hold the glass in place
Glass panes provide visibility and insulation
Hardware includes handles, locks, hinges, and other accessories
Seals and gaskets are used to prevent air and water leakage
I applied via Naukri.com and was interviewed in Mar 2021. There were 4 interview rounds.
based on 1 interview
Interview experience
Assistant Accounts Manager
5
salaries
| ₹0 L/yr - ₹0 L/yr |
Purchase Executive
5
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Site Supervisor
5
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Civil Engineer
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Head Administration and HR
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Signature Global
Pittie Group
Maxinfra
Vensa Infrastructure