Upload Button Icon Add office photos

Filter interviews by

Park Infrastructure Project Engineer Interview Questions and Answers

Updated 31 Dec 2023

Park Infrastructure Project Engineer Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Dec 2022. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is your key expertisations which can help our organisation?
  • Q2. Tell me about your Current designation and responsibilities that your are serving?

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in May 2024. There were 2 interview rounds.

Round 1 - Technical 

(6 Questions)

  • Q1. What is your current job role & responsibility?
  • Q2. How to manage site as a project engineer.
  • Ans. 

    A project engineer manages a site by overseeing construction activities, coordinating with stakeholders, ensuring compliance with regulations, and resolving issues.

    • Coordinate with project managers, contractors, and subcontractors to ensure smooth workflow.

    • Monitor progress and quality of construction activities to meet project deadlines.

    • Ensure compliance with safety regulations and quality standards.

    • Resolve any issues o...

  • Answered by AI
  • Q3. How much number of slab to give in one months.
  • Ans. 

    The number of slabs to give in one month depends on the project timeline, size of slabs, and resources available.

    • Consider the project timeline and deadlines for completion

    • Evaluate the size and complexity of the slabs to determine production rate

    • Assess the availability of resources such as manpower and equipment

    • Example: If the project requires 100 slabs and the production rate is 10 slabs per week, then it would take 10...

  • Answered by AI
  • Q4. What is the mivan shuttering.
  • Ans. 

    Mivan shuttering is a type of formwork that is used in construction for constructing walls and slabs.

    • Mivan shuttering is a fast-paced construction technique.

    • It involves setting up aluminum formwork to create the structure of walls and slabs.

    • The formwork is reusable and can be quickly assembled and dismantled.

    • Mivan shuttering results in smooth finishes on concrete surfaces.

    • It is commonly used in high-rise buildings and

  • Answered by AI
  • Q5. Types of cement grade and which grade used in M70.
  • Ans. 

    Different types of cement grades include OPC, PPC, PSC, etc. M70 grade typically uses OPC cement.

    • Types of cement grades: OPC, PPC, PSC, etc.

    • M70 grade usually uses OPC cement.

    • OPC (Ordinary Portland Cement) is commonly used in high-strength concrete mixes like M70.

  • Answered by AI
  • Q6. How much experience you have in high rise building.
Round 2 - HR 

(4 Questions)

  • Q1. What is your current salary?
  • Ans. 

    I am currently earning a competitive salary based on my experience and qualifications.

    • My current salary is in line with industry standards.

    • I am open to discussing salary expectations for this role.

    • I believe my compensation reflects my skills and contributions to my current employer.

  • Answered by AI
  • Q2. How much deduction in PF.
  • Ans. 

    The deduction in PF varies based on the employee's salary and the company's policy.

    • PF deduction is typically a percentage of the employee's basic salary

    • The current rate of PF deduction is 12% of the basic salary

    • Some companies may choose to match the employee's contribution to PF

    • Employees can also choose to contribute more than the mandatory 12%

  • Answered by AI
  • Q3. Your expectation salary breakup.
  • Q4. Provide last 3 months salary slips and other documents.

Interview Preparation Tips

Interview preparation tips for other job seekers - Before go to the interview in M3M you should clear the current job responsibility and all technical knowledge related your field.
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected
Round 1 - One-on-one 

(1 Question)

  • Q1. Allowable Tolerance on tiles?
  • Ans. 

    The allowable tolerance on tiles depends on the type of tile and the installation method.

    • Allowable tolerance for ceramic tiles is typically +/- 1/16 inch

    • For larger format tiles, the allowable tolerance may be greater

    • Tolerance for natural stone tiles can vary based on the type of stone and finish

    • Consult manufacturer guidelines for specific tolerance recommendations

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Naukri.com and was interviewed in May 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Diffirence between project and project engineering
  • Ans. 

    Project refers to a specific task with a defined start and end, while project engineering involves the technical aspects of planning, designing, and executing the project.

    • Project is the overall task or objective to be completed within a specific timeframe.

    • Project engineering focuses on the technical aspects such as planning, designing, and executing the project.

    • Project management involves coordinating resources and tas...

  • Answered by AI
  • Q2. Types of services in interior fitout
  • Ans. 

    Types of services in interior fitout include design, construction, project management, and installation.

    • Design services involve creating layouts, selecting materials, and creating 3D visualizations.

    • Construction services include building partitions, ceilings, and flooring.

    • Project management services involve coordinating schedules, budgets, and contractors.

    • Installation services include fitting furniture, fixtures, and eq...

  • Answered by AI
Round 3 - One-on-one 

(2 Questions)

  • Q1. Problems faced in site
  • Ans. 

    Some common problems faced on site include delays in material delivery, inclement weather, and coordination issues.

    • Delays in material delivery can impact project timelines and budgets

    • Inclement weather can halt work progress and cause safety concerns

    • Coordination issues between different teams can lead to misunderstandings and errors

  • Answered by AI
  • Q2. Difference between agreement and bond
  • Ans. 

    Agreement is a mutual understanding between parties, while a bond is a legal document that ensures fulfillment of obligations.

    • Agreement is a mutual understanding between two or more parties.

    • A bond is a legal document that guarantees the fulfillment of obligations.

    • Agreements are usually informal and may not always be legally binding.

    • Bonds are formal and legally enforceable documents.

    • Examples of agreements include contra...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Basic questions about present job
Round 3 - Technical 

(1 Question)

  • Q1. Basic questions regarding to project
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Aug 2023. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. About tile works
  • Q2. About mivan structure
Round 2 - One-on-one 

(2 Questions)

  • Q1. Salary of previous company
  • Ans. 

    I am not comfortable disclosing the salary of my previous company.

    • It is not appropriate to discuss previous salary in an interview setting.

    • Focus on discussing the skills and experiences that make you a strong candidate for the position.

    • Salary expectations can be discussed during the negotiation phase if an offer is extended.

  • Answered by AI
  • Q2. Expected salary
  • Ans. 

    My expected salary is negotiable and dependent on the overall compensation package offered.

    • My expected salary is based on my experience, skills, and the responsibilities of the role.

    • I am open to discussing the salary range for this position during the interview process.

    • I am looking for a competitive salary that reflects the market value for my skills and experience.

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Jan 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Chiller efficiency
  • Ans. 

    Chiller efficiency is a measure of how well a chiller unit is able to cool a space while using the least amount of energy.

    • Chiller efficiency is typically measured by the Coefficient of Performance (COP), which is the ratio of cooling output to energy input.

    • Regular maintenance and cleaning of chiller components can improve efficiency.

    • Upgrading to a more energy-efficient chiller model can also increase efficiency.

    • Proper ...

  • Answered by AI
  • Q2. Which one more efficiently? Air cooled,or water cooled???
  • Ans. 

    Water cooled systems are generally more efficient than air cooled systems due to higher heat transfer capabilities.

    • Water has higher heat transfer capabilities compared to air

    • Water cooled systems can maintain more consistent temperatures

    • Water cooled systems are typically used in high performance applications such as data centers and industrial machinery

  • Answered by AI
  • Q3. How we improved duct velocity?
  • Ans. 

    Duct velocity can be improved by increasing the fan speed or reducing the duct size.

    • Increase the fan speed to increase the air velocity in the duct.

    • Reduce the duct size to increase the air velocity.

    • Use dampers or adjustable louvers to control and optimize the airflow.

    • Ensure proper sealing of duct joints to minimize air leakage.

    • Consider using smooth and straight ducts to reduce friction and improve airflow.

    • Regularly cle...

  • Answered by AI
  • Q4. What types of gas use chiller system?
  • Ans. 

    The chiller system uses various types of gases for cooling purposes.

    • Common types of gases used in chiller systems include R-134a, R-410A, and ammonia.

    • R-134a is a hydrofluorocarbon (HFC) refrigerant commonly used in air conditioning systems.

    • R-410A is a blend of hydrofluorocarbons used as a replacement for older refrigerants.

    • Ammonia (NH3) is often used in industrial chiller systems due to its high cooling capacity.

    • Other ...

  • Answered by AI
  • Q5. How we decided the vrf system capacity as per area??
  • Ans. 

    The VRF system capacity is determined based on the area's cooling and heating load requirements.

    • Calculate the total cooling load and heating load for the area

    • Consider factors such as insulation, windows, occupancy, and equipment

    • Select VRF system capacity based on the calculated load requirements

    • Consult with HVAC professionals for accurate sizing

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical round is more important than other rounds so we should prepare that things very easily putting during interview and most important things candidates CV,whatever he mension his cv technically should be know very well' 🙏
Round 1 - HR 

(2 Questions)

  • Q1. Personals information
  • Q2. Work related questions
Round 2 - Technical 

(2 Questions)

  • Q1. About work related questions
  • Q2. Family information and personal goals
Round 3 - HR 

(1 Question)

  • Q1. Final Salary discussion

Interview Preparation Tips

Interview preparation tips for other job seekers - But my advice is don’t join this organization
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed before Jul 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Salary details and negotiation
Round 3 - Technical 

(1 Question)

  • Q1. Projects and works done

Interview Questionnaire 

1 Question

  • Q1. ALL CIVIL WORK OF SITE

Interview Preparation Tips

Interview preparation tips for other job seekers - Project Engineer

Park Infrastructure Interview FAQs

How many rounds are there in Park Infrastructure Project Engineer interview?
Park Infrastructure interview process usually has 1 rounds. The most common rounds in the Park Infrastructure interview process are Technical.

Tell us how to improve this page.

Park Infrastructure Project Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more
Park Infrastructure Project Engineer Salary
based on 4 salaries
₹4 L/yr - ₹12 L/yr
19% more than the average Project Engineer Salary in India
View more details

Park Infrastructure Project Engineer Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

5.0

Skill development

5.0

Work-life balance

5.0

Salary

4.0

Job security

4.0

Company culture

5.0

Promotions

4.0

Work satisfaction

Explore 1 Review and Rating
Site Engineer
7 salaries
unlock blur

₹2.4 L/yr - ₹3.4 L/yr

Project Engineer
4 salaries
unlock blur

₹4.1 L/yr - ₹12 L/yr

Explore more salaries
Compare Park Infrastructure with

JLL

4.1
Compare

CBRE

4.2
Compare

NoBroker

3.1
Compare

Lodha Group

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview