i
Parason Machinery
Filter interviews by
I applied via Approached by Company and was interviewed before Jun 2023. There were 3 interview rounds.
Simple test as same like exam
I applied via Approached by Company and was interviewed in Nov 2022. There were 3 interview rounds.
I am a recent graduate with a degree in engineering. I have a strong passion for problem-solving and a desire to learn and grow in the field.
Recent graduate with a degree in engineering
Passionate about problem-solving
Eager to learn and grow in the field
Pulp and paper technologies refer to the processes involved in the production of paper from wood or recycled materials.
Pulp production involves separating fibers from wood or recycled materials
Paper production involves forming a sheet of paper from pulp and drying it
Technologies used include chemical pulping, mechanical pulping, and recycled fiber processing
Environmental concerns include deforestation and pollution fro
I applied via Approached by Company and was interviewed before Sep 2022. There were 2 interview rounds.
Parason Machinery interview questions for popular designations
I applied via Walk-in and was interviewed before Jul 2022. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Feb 2022. There was 1 interview round.
I applied via Naukri.com and was interviewed in Jul 2021. There were 4 interview rounds.
I applied via Naukri.com and was interviewed in Dec 2020. There were 4 interview rounds.
MTBF stands for Mean Time Between Failures and MTTR stands for Mean Time To Repair.
MTBF is the average time between two failures of a system or equipment.
MTTR is the average time taken to repair a failed system or equipment.
MTBF and MTTR are important metrics in measuring the reliability and maintainability of a system.
MTBF and MTTR can be used to calculate the availability of a system.
For example, if a machine has an ...
Lean manufacturing focuses on eliminating waste while TPM focuses on maximizing equipment effectiveness.
Lean manufacturing aims to reduce waste in the production process
TPM aims to maximize equipment effectiveness and minimize downtime
Lean manufacturing focuses on continuous improvement and involves all employees
TPM involves regular maintenance and upkeep of equipment
Both methodologies can be used together to improve o
I applied via Naukri.com and was interviewed in Jan 2021. There was 1 interview round.
I applied via Naukri.com and was interviewed in Apr 2021. There were 3 interview rounds.
The duration of Parason Machinery interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 20 interviews
Interview experience
based on 183 reviews
Rating in categories
Design Engineer
52
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Engineer
26
salaries
| ₹0 L/yr - ₹0 L/yr |
Maintenance Engineer
25
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Supervisor
25
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
23
salaries
| ₹0 L/yr - ₹0 L/yr |
Laxmi Board Paper Mills
JMC Paper Tech
SEIAA Andhra Pradesh
Bharath Machines