I applied via Naukri.com and was interviewed in Jul 2024. There were 4 interview rounds.
IQ Test, beautifully designed
posted on 18 Apr 2024
I applied via Walk-in and was interviewed in Oct 2023. There were 2 interview rounds.
30 marks aptitude test in which 20 is the cutoff.
I applied via Walk-in and was interviewed in Jul 2023. There were 2 interview rounds.
Area formula, SS MS Material information
I applied via Walk-in and was interviewed before Jul 2022. There were 2 interview rounds.
30 basic aptitude in technical.
Heat exchangers are devices used to transfer heat between two or more fluids, often used in industrial processes.
Understand the heat transfer requirements and fluid properties
Select appropriate type of heat exchanger (e.g. shell and tube, plate, finned)
Design the heat exchanger to meet required heat transfer area and flow rates
Consider factors like fouling, pressure drop, and material compatibility
Optimize design for e
Process design of pump involves selecting the right type of pump, determining flow rate and pressure requirements, and designing the piping system.
Select the appropriate type of pump based on the application (centrifugal, positive displacement, etc.)
Calculate the required flow rate and pressure for the system
Design the piping system to ensure proper flow and pressure distribution
Consider factors such as pump efficiency...
P-Mech Consultant interview questions for popular designations
Top trending discussions
I applied via Approached by Company and was interviewed in Nov 2024. There were 2 interview rounds.
posted on 9 Oct 2024
I applied via Referral and was interviewed in Sep 2024. There was 1 interview round.
The main reason for belt joint failure is usually due to improper installation or maintenance.
Improper installation of the belt joint, such as incorrect alignment or tensioning
Lack of proper maintenance, leading to wear and tear of the joint
Use of low-quality materials for the joint
Excessive load or stress on the belt joint
Environmental factors like temperature or humidity affecting the joint
The alignment maximum tolerance refers to the maximum allowable deviation from the specified alignment.
Alignment maximum tolerance is the maximum allowable deviation from the specified alignment.
It is typically expressed in terms of a percentage or a specific measurement unit.
For example, a machine part may have an alignment maximum tolerance of +/- 0.005 inches.
Exceeding the alignment maximum tolerance can lead to per
To replace the bucket wheel reclaimer luffing cylinder, follow these steps.
1. Shut down the machine and ensure all power sources are disconnected.
2. Remove any surrounding components that may obstruct access to the luffing cylinder.
3. Use appropriate tools to disconnect the hydraulic hoses and fittings from the cylinder.
4. Support the weight of the cylinder as it is removed to prevent damage to surrounding components.
5...
JSA stands for Job Safety Analysis, focusing on specific job tasks, while HIRA stands for Hazard Identification and Risk Assessment, focusing on overall workplace hazards.
JSA is task-specific, focusing on individual job tasks and potential hazards
HIRA is broader, looking at overall workplace hazards and assessing risks
JSA involves breaking down a job into steps and identifying potential hazards for each step
HIRA involv...
To create a PR in SAP, you can use transaction code ME51N or ME21N.
Use transaction code ME51N to create a purchase requisition in SAP.
Enter the necessary details such as material, quantity, delivery date, etc.
Save the purchase requisition and it will be created in the system.
Alternatively, you can also use transaction code ME21N to create a purchase order directly.
The procedure of pulley replacement involves identifying the faulty pulley, removing the old pulley, installing the new pulley, and testing the system.
Identify the faulty pulley by checking for any signs of wear or damage.
Use appropriate tools to remove the old pulley, such as a pulley puller or wrench.
Install the new pulley by aligning it properly and securing it in place.
Test the system to ensure the new pulley is fu...
PTW stands for Permit to Work, a procedure used to ensure that work is carried out safely in potentially hazardous environments.
PTW is a formal written system used to control certain types of work that are identified as potentially hazardous.
Before starting work, a permit must be obtained from a designated authority.
The permit outlines the work to be done, the hazards involved, and the necessary precautions to be taken...
posted on 9 Aug 2024
I applied via Approached by Company and was interviewed in Jul 2024. There was 1 interview round.
Monthly and 6 month target fixed
White Oil , Transformer Oil and Petroleum jelly grade wise discussion.
The monthly sales target is set based on historical data, market trends, and company goals.
Monthly sales target should be realistic and achievable
Consider factors such as seasonality, market demand, and competition
Set stretch goals to motivate the sales team
Regularly review and adjust the target based on performance
Example: Monthly sales target is $100,000 based on previous year's performance and 10% growth target
I applied via Recruitment Consulltant and was interviewed in Jul 2024. There were 2 interview rounds.
I applied via AmbitionBox and was interviewed in Sep 2024. There were 2 interview rounds.
Overviews pumps and trableshooting
posted on 2 Oct 2024
I applied via Approached by Company and was interviewed in Sep 2024. There was 1 interview round.
Costing for laying pipelines involves calculating material costs, labor costs, equipment costs, and overhead expenses.
Calculate the length of the pipeline needed
Determine the type and size of pipes required
Estimate the cost of materials including pipes, fittings, and valves
Factor in labor costs for installation
Consider equipment costs such as machinery and tools
Include overhead expenses like permits, insurance, and pro...
based on 4 interviews
Interview experience
based on 33 reviews
Rating in categories
Piping Engineer
8
salaries
| ₹3.6 L/yr - ₹9 L/yr |
Draughtsman Mechanical
7
salaries
| ₹3.3 L/yr - ₹5.5 L/yr |
Process Engineer
6
salaries
| ₹3 L/yr - ₹8 L/yr |
Senior Piping Designer
5
salaries
| ₹4.8 L/yr - ₹6.9 L/yr |
Project Engineer
5
salaries
| ₹3.5 L/yr - ₹10 L/yr |
Linde India
Columbia Petro Chem
NTPC GE Power Services
ACB (India)