Quality control, FMEA, CAPA, process control, BIS standards, IQC/PAC/OQC, sampling plan, CTQ/CTP are all important aspects of product launch.
Quality control involves ensuring that a product meets the desired quality standards.
FMEA (Failure Mode and Effects Analysis) is a systematic approach to identifying and preventing potential product failures.
CAPA (Corrective and Preventive Action) is a process for identifying and ...
Top trending discussions
A wire harness is a collection of wires, cables, and connectors that transmit electrical signals and power between different components in a system.
Wire harnesses provide a neat and organized way to route and protect wires in a system.
They ensure proper connectivity and prevent wire damage or short circuits.
Wire harnesses simplify troubleshooting and maintenance by allowing easy identification and replacement of faulty...
Sputtering is a process used in manufacturing to deposit thin films of material onto a surface.
Sputtering is a physical vapor deposition technique.
It involves bombarding a target material with high-energy ions or atoms.
This bombardment dislodges atoms from the target material, which then deposit onto a substrate.
Sputtering is commonly used in the production of semiconductor devices, solar cells, and thin film coatings.
...
I applied via Naukri.com and was interviewed before Dec 2019. There were 5 interview rounds.
I applied via Walk-in and was interviewed before Aug 2020. There was 1 interview round.
I applied via Apna Jobs and was interviewed in Mar 2022. There were 3 interview rounds.
I will immediately investigate the cause of the NG lot and work with the team to find a solution to make it usable.
Investigate the cause of the NG lot
Work with the team to find a solution
Prioritize urgent use of the lot
Ensure quality control measures are in place
Communicate with stakeholders about the situation
I applied via Approached by Company and was interviewed before Jul 2023. There were 4 interview rounds.
Field engineer in RACW
Refrigeration & air conditioner
Yes, I have experience in handling a situation where a critical quality issue was identified during production.
Identified root cause of the quality issue
Implemented corrective actions to address the issue
Worked closely with production team to prevent recurrence
Group discussion with any issues
I applied via Company Website and was interviewed in Jan 2022. There were 2 interview rounds.
Insulation
Insulate the panel
Use protective covers
Ensure proper grounding
Regular maintenance
UG cable laying process involves trenching, cable pulling, jointing, and testing.
Trenching is done to create a path for the cable and ensure proper depth
Cable pulling involves laying the cable in the trench and securing it with clamps
Jointing is done to connect two cables together using connectors and insulators
Testing is done to ensure the cable is properly installed and functioning
Criteria for UG cable laying include...
I applied via Walk-in and was interviewed before Feb 2022. There were 3 interview rounds.
based on 5 reviews
Rating in categories
Area Sales Manager
143
salaries
| ₹6.1 L/yr - ₹15.5 L/yr |
Assistant Manager
107
salaries
| ₹5.5 L/yr - ₹15 L/yr |
Territory Sales Manager
79
salaries
| ₹2.9 L/yr - ₹11.8 L/yr |
Deputy Manager
57
salaries
| ₹8.5 L/yr - ₹18 L/yr |
Senior Engineer
54
salaries
| ₹5 L/yr - ₹11 L/yr |
Samsung
OPPO
LG Electronics
HARMAN