Filter interviews by
I applied via LinkedIn and was interviewed before May 2023. There was 1 interview round.
Float is the amount of time a task can be delayed without delaying the project. Negative float occurs when a task is delayed beyond its available float.
Float is the amount of time a task can be delayed without delaying the project.
Negative float occurs when a task is delayed beyond its available float.
To avoid negative float, carefully manage task dependencies and resource allocation.
Regularly update project schedules ...
The sequence of heat exchanger maintenance involves inspection, cleaning, repair, and testing.
1. Start with visual inspection to identify any signs of damage or corrosion.
2. Clean the heat exchanger by removing any debris or fouling materials.
3. Repair any leaks, cracks, or damaged components.
4. Test the heat exchanger to ensure it is functioning properly after maintenance.
5. Regularly schedule maintenance to prevent m...
posted on 27 Dec 2023
The question is asking about the perception of time wasted while working.
Time management is crucial in any role to ensure productivity and efficiency.
Identifying and eliminating time-wasting activities can lead to better results.
Taking breaks and managing workload effectively can prevent burnout and increase overall performance.
I appeared for an interview in Apr 2017.
My favourite sportsperson is Serena Williams.
Serena Williams is a professional tennis player
She has won numerous Grand Slam titles
She is known for her powerful serve and aggressive playing style
Crude oil is separated from water through a process called oil-water separation.
Oil-water separation is achieved by using various techniques such as gravity separation, centrifugation, and filtration.
Gravity separation involves allowing the mixture of crude oil and water to settle, with the oil rising to the top due to its lower density.
Centrifugation utilizes the centrifugal force to separate the oil and water by spin...
I appeared for an interview in Apr 2017.
I applied via Campus Placement and was interviewed in Dec 2016. There were 2 interview rounds.
I applied via Campus Placement and was interviewed in Dec 2016. There were 4 interview rounds.
I applied via Campus Placement and was interviewed in Dec 2016. There were 2 interview rounds.
I appeared for an interview in Sep 2016.
Developed a mobile app for tracking daily water intake
Designed user-friendly interface for easy input of water consumption
Implemented reminders to encourage regular hydration
Integrated with health tracking apps to provide comprehensive health data
Received positive feedback from beta testers for improved hydration habits
I have experience in various internships related to my field of study.
Interned at XYZ Company, assisting with data analysis and research projects.
Completed a summer internship at ABC Hospital, shadowing doctors and nurses.
Worked as an intern at DEF Organization, helping with event planning and coordination.
Participated in a research internship at GHI University, conducting experiments and analyzing data.
based on 1 interview
Interview experience
Project Manager
6
salaries
| ₹20.5 L/yr - ₹48 L/yr |
Planning Engineer
6
salaries
| ₹8.5 L/yr - ₹16 L/yr |
Project Buyer
5
salaries
| ₹12 L/yr - ₹12.5 L/yr |
Mechanical Supervisor
5
salaries
| ₹9.2 L/yr - ₹15 L/yr |
Welding Inspector
4
salaries
| ₹11.9 L/yr - ₹15.6 L/yr |
Schlumberger
Baker Hughes
Cairn Energy
Petrofac