Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Oceaneering International Team. If you also belong to the team, you can get access from here

Oceaneering International Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Oceaneering International Senior Billing Analyst Interview Questions and Answers for Experienced

Updated 18 Nov 2021

Oceaneering International Senior Billing Analyst Interview Experiences for Experienced

1 interview found

I appeared for an interview in Oct 2021.

Interview Questionnaire 

5 Questions

  • Q1. They asked me to fill up a form before the final round..
  • Q2. I filled the same and related to that... They asked all questions.. Few were related to my previous organisation
  • Q3. The interview went well... They did not contact me for anything... I was the one reaching them again and again
  • Q4. When I called them about the feedback... I was surprised, the HR said... Your feedback was not positive.... Hahaha 🤣... I was laughing at the moment... God only knows what they want..... The last question...
  • Q5. Don't waste your time... Even after a superb interview.. You will get to hear negative....Still All the best...

Interview Preparation Tips

Interview preparation tips for other job seekers - Was not happy with their interview process.... No advice...

Interview questions from similar companies

I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. About pipeline
  • Q2. Hydrotest procedure
  • Ans. 

    Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.

    • The vessel or pipeline is filled with water and pressurized to a specified level

    • The pressure is held for a specified amount of time to check for leaks or deformations

    • The test is usually performed before commissioning or after repairs

    • The test pressure and duration are deter...

  • Answered by AI
  • Q3. HDD procedure
  • Ans. 

    HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.

    • Ensure the HDD is compatible with the computer system

    • Physically install the HDD in the appropriate bay

    • Connect the necessary cables to the HDD and motherboard

    • Configure the HDD in the BIOS settings

    • Format the HDD and install the operating system

    • Test the HDD for proper functionality

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic of pipeline and brief knowledge required.

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What are KPI's for project
  • Ans. 

    Key Performance Indicators (KPIs) for projects are measurable metrics used to evaluate the success of a project.

    • KPIs should be specific, measurable, achievable, relevant, and time-bound (SMART)

    • Examples of project KPIs include budget variance, schedule adherence, quality metrics, customer satisfaction, and team performance

    • KPIs help project managers track progress, identify areas for improvement, and make data-driven dec

  • Answered by AI
  • Q2. 3M's are important in every project. Men, Material & Money

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well with respect to the Job description & your previous work experience
Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Sep 2024.

Round 1 - One-on-one 

(2 Questions)

  • Q1. About previous experience
  • Q2. Why i left all previous companies.
  • Ans. 

    I left previous companies to pursue growth opportunities, align with my career goals, and seek better work-life balance.

    • I left Company A after 3 years to seek a role that offered more leadership opportunities, as I wanted to develop my management skills.

    • At Company B, I transitioned to a new position that aligned better with my long-term career goals in project management.

    • I departed from Company C to find a work environ...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Dec 2024. There was 1 interview round.

Round 1 - HR 

(1 Question)

  • Q1. Tell me about yourself?
  • Ans. 

    I am a dedicated and experienced professional with a strong background in management and leadership.

    • Over 5 years of experience in management roles

    • Proven track record of successfully leading teams to achieve goals

    • Strong communication and problem-solving skills

    • Bachelor's degree in Business Administration from XYZ University

    • Passionate about developing and mentoring team members

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Always let them know your full career with learn
Round 1 - Coding Test 

Debug C program

Round 2 - Technical 

(2 Questions)

  • Q1. What is pointer in C
  • Ans. 

    Pointer is a variable that stores the memory address of another variable in C programming language.

    • Pointers are used to manipulate data directly in memory

    • They are used to pass addresses of variables to functions

    • They can be used to create dynamic data structures like linked lists

    • Example: int *ptr; ptr = # *ptr = 10; //num now has value 10

  • Answered by AI
  • Q2. Reference tracker to point to memory location
  • Ans. 

    A reference tracker is used to point to a specific memory location.

    • A reference tracker is a variable that stores the memory address of another variable.

    • It is commonly used in programming languages like C++ and Java.

    • For example, in Java, the 'this' keyword is a reference tracker that points to the current object.

    • Reference trackers are useful for passing variables by reference instead of by value.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare from Let uS C by Yashwant Sinha to do well

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Elaborate VT pump installation process step by step.. How many valves & types used in Raising main? Explain about Cooling Lubrication system.
  • Ans. 

    The VT pump installation process involves several steps. The raising main has multiple valves of different types. The cooling lubrication system is also important.

    • The VT pump installation process involves selecting the right location for the pump, preparing the foundation, and installing the pump.

    • The raising main typically has gate valves, check valves, and air release valves.

    • The cooling lubrication system is responsib...

  • Answered by AI
  • Q2. Why are you going to quit the current job?
  • Ans. 

    I am looking for new challenges and opportunities for growth.

    • Seeking new challenges and opportunities for growth

    • Wanting to expand my skill set and knowledge

    • Desire for a higher level of responsibility

    • Seeking a better work-life balance

    • Unsatisfied with the current work environment or company culture

  • Answered by AI
  • Q3. What is your salary expectation?
  • Ans. 

    I expect a competitive salary that reflects my experience and the responsibilities of the Assistant Manager role.

    • I am looking for a salary that is in line with industry standards and the level of responsibility associated with the Assistant Manager position.

    • I have researched the average salary range for Assistant Managers in this industry and location, and I believe my skills and experience warrant a salary within that...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be Confident..
Be Genuine..
Listen each & every Qustion or case study & Explain properly as per practical conditions.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jun 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Reagarding work experiences & background.
Round 2 - Technical 

(4 Questions)

  • Q1. Related to technical aspects of projects executed.
  • Q2. Concrete mix designs
  • Q3. P&M productivity - Earth works
  • Q4. Customer relationship related

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident in your answers. See the scope and technical aspects of the experience claimed.
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jan 2023. There was 1 interview round.

Round 1 - Technical 

(9 Questions)

  • Q1. Stairs case ralling Section and fixing process
  • Q2. Productivity of plaster work and tiles
  • Ans. 

    The productivity of plaster work and tiles is an important factor in construction projects.

    • Productivity in plaster work can be measured by the amount of plaster applied per hour or per day.

    • Factors that can affect plaster work productivity include the skill level of the workers, the quality of materials used, and the efficiency of the tools and equipment.

    • For example, experienced plasterers may be able to apply plaster m...

  • Answered by AI
  • Q3. Centiler beam steel design
  • Ans. 

    Centiler beam steel design is a method used to determine the appropriate size and shape of steel beams for structural support.

    • Centiler beam steel design involves calculating the load and span of the beam to determine the required section modulus.

    • The section modulus is then used to select the appropriate beam size from standard steel beam tables.

    • Factors such as the type of load, material properties, and safety factors a...

  • Answered by AI
  • Q4. In footing 25 mm dia bend deduction yes ya No
  • Q5. Responsibility and team' work
  • Q6. Your work at site?
  • Q7. Work permit at site
  • Q8. Density of steel with unit
  • Ans. 

    The density of steel is a measure of its mass per unit volume.

    • Density of steel is typically measured in units of grams per cubic centimeter (g/cm³) or kilograms per cubic meter (kg/m³).

    • The density of steel can vary depending on the specific type and composition of the steel.

    • For example, the density of carbon steel is around 7.85 g/cm³, while stainless steel has a density of about 8 g/cm³.

    • The density of steel is an impo...

  • Answered by AI
  • Q9. AAC block price and size details
  • Ans. 

    AAC blocks are a type of lightweight concrete blocks used in construction. They come in various sizes and prices.

    • AAC blocks are made from autoclaved aerated concrete, which is a mixture of cement, lime, sand, water, and an expanding agent.

    • The size of AAC blocks can vary, but common sizes include 600mm x 200mm x 100mm and 600mm x 200mm x 150mm.

    • The prices of AAC blocks depend on factors such as the brand, quality, and qu...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for L&T Construction Assistant Manager interview:
  • Nice
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I appeared for an interview before Mar 2024, where I was asked the following questions.

  • Q1. Explain about construction activities
  • Ans. 

    Construction activities encompass planning, designing, and building structures, ensuring safety and compliance with regulations.

    • Site Preparation: Clearing and leveling land before construction begins.

    • Foundation Work: Pouring concrete and laying the groundwork for stability.

    • Framing: Constructing the skeleton of the building using wood or steel.

    • Roofing: Installing the roof structure to protect the building from elements.

    • ...

  • Answered by AI
  • Q2. Explain procedure of Mivan Shuttering
  • Ans. 

    Mivan shuttering is an aluminum formwork system used for rapid construction of concrete structures.

    • 1. Preparation: Site is cleared and foundation is laid before shuttering installation.

    • 2. Assembly: Aluminum panels are assembled on-site to create the desired shape of walls and slabs.

    • 3. Alignment: Panels are aligned and secured to ensure accuracy in dimensions.

    • 4. Concrete Pouring: Concrete is poured into the formwork, fi...

  • Answered by AI

Oceaneering International Interview FAQs

What are the top questions asked in Oceaneering International Senior Billing Analyst interview for experienced candidates?

Some of the top questions asked at the Oceaneering International Senior Billing Analyst interview for experienced candidates -

  1. When I called them about the feedback... I was surprised, the HR said... Your f...read more
  2. Don't waste your time... Even after a superb interview.. You will get to hear n...read more
  3. They asked me to fill up a form before the final roun...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 758 Interviews
Saint-Gobain Interview Questions
4.0
 • 173 Interviews
AECOM Interview Questions
4.2
 • 118 Interviews
Worley Interview Questions
4.1
 • 113 Interviews
AtkinsRealis Interview Questions
3.9
 • 88 Interviews
Bechtel Interview Questions
3.9
 • 68 Interviews
Wood Group Interview Questions
3.8
 • 61 Interviews
View all
Design Engineer
94 salaries
unlock blur

₹4 L/yr - ₹12.5 L/yr

CAD Engg
55 salaries
unlock blur

₹3.2 L/yr - ₹6.8 L/yr

Network Engineer
43 salaries
unlock blur

₹4 L/yr - ₹16 L/yr

Senior Engineering Analyst
36 salaries
unlock blur

₹9 L/yr - ₹20 L/yr

Senior Design Engineer
28 salaries
unlock blur

₹8.1 L/yr - ₹17 L/yr

Explore more salaries
Compare Oceaneering International with

L&T Construction

4.0
Compare

Alstom Transportation

3.7
Compare

Saint-Gobain

4.0
Compare

AECOM

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview