I appeared for an interview in Oct 2021.
Top trending discussions
I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.
Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.
The vessel or pipeline is filled with water and pressurized to a specified level
The pressure is held for a specified amount of time to check for leaks or deformations
The test is usually performed before commissioning or after repairs
The test pressure and duration are deter...
HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.
Ensure the HDD is compatible with the computer system
Physically install the HDD in the appropriate bay
Connect the necessary cables to the HDD and motherboard
Configure the HDD in the BIOS settings
Format the HDD and install the operating system
Test the HDD for proper functionality
posted on 25 Oct 2023
Key Performance Indicators (KPIs) for projects are measurable metrics used to evaluate the success of a project.
KPIs should be specific, measurable, achievable, relevant, and time-bound (SMART)
Examples of project KPIs include budget variance, schedule adherence, quality metrics, customer satisfaction, and team performance
KPIs help project managers track progress, identify areas for improvement, and make data-driven dec
I appeared for an interview in Sep 2024.
I left previous companies to pursue growth opportunities, align with my career goals, and seek better work-life balance.
I left Company A after 3 years to seek a role that offered more leadership opportunities, as I wanted to develop my management skills.
At Company B, I transitioned to a new position that aligned better with my long-term career goals in project management.
I departed from Company C to find a work environ...
posted on 3 Jan 2025
I applied via Approached by Company and was interviewed in Dec 2024. There was 1 interview round.
I am a dedicated and experienced professional with a strong background in management and leadership.
Over 5 years of experience in management roles
Proven track record of successfully leading teams to achieve goals
Strong communication and problem-solving skills
Bachelor's degree in Business Administration from XYZ University
Passionate about developing and mentoring team members
posted on 14 Apr 2022
Debug C program
Pointer is a variable that stores the memory address of another variable in C programming language.
Pointers are used to manipulate data directly in memory
They are used to pass addresses of variables to functions
They can be used to create dynamic data structures like linked lists
Example: int *ptr; ptr = # *ptr = 10; //num now has value 10
A reference tracker is used to point to a specific memory location.
A reference tracker is a variable that stores the memory address of another variable.
It is commonly used in programming languages like C++ and Java.
For example, in Java, the 'this' keyword is a reference tracker that points to the current object.
Reference trackers are useful for passing variables by reference instead of by value.
The VT pump installation process involves several steps. The raising main has multiple valves of different types. The cooling lubrication system is also important.
The VT pump installation process involves selecting the right location for the pump, preparing the foundation, and installing the pump.
The raising main typically has gate valves, check valves, and air release valves.
The cooling lubrication system is responsib...
I am looking for new challenges and opportunities for growth.
Seeking new challenges and opportunities for growth
Wanting to expand my skill set and knowledge
Desire for a higher level of responsibility
Seeking a better work-life balance
Unsatisfied with the current work environment or company culture
I expect a competitive salary that reflects my experience and the responsibilities of the Assistant Manager role.
I am looking for a salary that is in line with industry standards and the level of responsibility associated with the Assistant Manager position.
I have researched the average salary range for Assistant Managers in this industry and location, and I believe my skills and experience warrant a salary within that...
I applied via Naukri.com and was interviewed before Jun 2023. There were 2 interview rounds.
I applied via Walk-in and was interviewed before Jan 2023. There was 1 interview round.
The productivity of plaster work and tiles is an important factor in construction projects.
Productivity in plaster work can be measured by the amount of plaster applied per hour or per day.
Factors that can affect plaster work productivity include the skill level of the workers, the quality of materials used, and the efficiency of the tools and equipment.
For example, experienced plasterers may be able to apply plaster m...
Centiler beam steel design is a method used to determine the appropriate size and shape of steel beams for structural support.
Centiler beam steel design involves calculating the load and span of the beam to determine the required section modulus.
The section modulus is then used to select the appropriate beam size from standard steel beam tables.
Factors such as the type of load, material properties, and safety factors a...
The density of steel is a measure of its mass per unit volume.
Density of steel is typically measured in units of grams per cubic centimeter (g/cm³) or kilograms per cubic meter (kg/m³).
The density of steel can vary depending on the specific type and composition of the steel.
For example, the density of carbon steel is around 7.85 g/cm³, while stainless steel has a density of about 8 g/cm³.
The density of steel is an impo...
AAC blocks are a type of lightweight concrete blocks used in construction. They come in various sizes and prices.
AAC blocks are made from autoclaved aerated concrete, which is a mixture of cement, lime, sand, water, and an expanding agent.
The size of AAC blocks can vary, but common sizes include 600mm x 200mm x 100mm and 600mm x 200mm x 150mm.
The prices of AAC blocks depend on factors such as the brand, quality, and qu...
I appeared for an interview before Mar 2024, where I was asked the following questions.
Construction activities encompass planning, designing, and building structures, ensuring safety and compliance with regulations.
Site Preparation: Clearing and leveling land before construction begins.
Foundation Work: Pouring concrete and laying the groundwork for stability.
Framing: Constructing the skeleton of the building using wood or steel.
Roofing: Installing the roof structure to protect the building from elements.
...
Mivan shuttering is an aluminum formwork system used for rapid construction of concrete structures.
1. Preparation: Site is cleared and foundation is laid before shuttering installation.
2. Assembly: Aluminum panels are assembled on-site to create the desired shape of walls and slabs.
3. Alignment: Panels are aligned and secured to ensure accuracy in dimensions.
4. Concrete Pouring: Concrete is poured into the formwork, fi...
Some of the top questions asked at the Oceaneering International Senior Billing Analyst interview for experienced candidates -
Design Engineer
94
salaries
| ₹4 L/yr - ₹12.5 L/yr |
CAD Engg
55
salaries
| ₹3.2 L/yr - ₹6.8 L/yr |
Network Engineer
43
salaries
| ₹4 L/yr - ₹16 L/yr |
Senior Engineering Analyst
36
salaries
| ₹9 L/yr - ₹20 L/yr |
Senior Design Engineer
28
salaries
| ₹8.1 L/yr - ₹17 L/yr |
L&T Construction
Alstom Transportation
Saint-Gobain
AECOM