Upload Button Icon Add office photos

Filter interviews by

Northern Sky Properties Finishing Supervisor Interview Questions and Answers

Updated 21 Nov 2023

Northern Sky Properties Finishing Supervisor Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. M30 concrete description about this
  • Ans. 

    M30 concrete is a type of concrete with a compressive strength of 30 megapascals after 28 days of curing.

    • M30 concrete is a mix of cement, sand, and aggregate in a ratio of 1:1:2.

    • It is commonly used in residential construction for foundations, slabs, and columns.

    • The water-cement ratio for M30 concrete is typically around 0.45.

    • Proper curing is essential to achieve the desired strength of M30 concrete.

  • Answered by AI
  • Q2. What isM-25 concrete
  • Ans. 

    M-25 concrete is a mix of concrete with a compressive strength of 25 MPa.

    • M-25 concrete is a mix of 1 part cement, 1 part sand, and 2 parts coarse aggregates.

    • It is commonly used in construction for structural components like beams, columns, and slabs.

    • The compressive strength of M-25 concrete is 25 MPa, which makes it suitable for medium strength applications.

  • Answered by AI
Round 3 - Group Discussion 

About civil or finishing

Interview Preparation Tips

Interview preparation tips for other job seekers - Working as a finishing supervisor

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Which sq mm cable we can use for 10 hp motor?
  • Ans. 

    The cable size required for a 10 hp motor depends on the voltage and current rating of the motor.

    • The cable size should be selected based on the motor's full load current (FLC) and the voltage rating.

    • For a 10 hp motor, the FLC would typically be around 15-20 Amps.

    • A common cable size for a 10 hp motor operating at 415V could be 4 sq mm cable.

  • Answered by AI
  • Q2. Tell me about,how many you are electrically sound?
  • Ans. 

    I have a strong understanding of electrical systems and am capable of troubleshooting and problem-solving in this area.

    • I have a degree in Electrical Engineering

    • I have completed multiple projects involving electrical systems

    • I have experience working with electrical equipment and tools

    • I have a good understanding of electrical codes and regulations

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I appeared for an interview before Mar 2024, where I was asked the following questions.

  • Q1. About experience
  • Q2. How to handle your project
  • Ans. 

    Effective project handling involves planning, communication, and adaptability to ensure successful outcomes.

    • Define clear project goals and objectives to align the team.

    • Utilize project management tools like Jira or Trello for tracking progress.

    • Conduct regular team meetings to discuss updates and challenges.

    • Implement Agile methodologies to adapt to changes quickly.

    • Document all processes and decisions for future reference

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - For good experience and gain knowledge
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Apr 2023. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Finishing process explanation ( plastering to handover)
  • Ans. 

    The finishing process involves plastering, painting, and final touches before handing over the completed project to the client.

    • Plastering is done to create a smooth surface on walls and ceilings.

    • Painting is then carried out to add color and protection to the surfaces.

    • Final touches may include installing fixtures, cleaning, and ensuring everything is in place for handover.

    • Quality control checks are essential at each sta

  • Answered by AI
  • Q2. Upvc window component explanation
  • Ans. 

    UPVC window components are parts used in the construction of UPVC windows, such as frames, sashes, glass panes, and hardware.

    • UPVC frames are the main structural component of the window

    • Sashes are the movable parts that hold the glass in place

    • Glass panes provide visibility and insulation

    • Hardware includes handles, locks, hinges, and other accessories

    • Seals and gaskets are used to prevent air and water leakage

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. Tell me about your self

Interview Preparation Tips

Interview preparation tips for other job seekers - Answers to question to be crisp , only replyvto question asked for, no extra answers

Interview Questionnaire 

1 Question

  • Q1. Technical Civil Execution engineering with finishing RCC experience
Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Sep 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. In how many days u will join the company
  • Q2. What is your Sal expectations

Interview Preparation Tips

Interview preparation tips for other job seekers - No tips to give. All the best for your interview .nothing more to share

I applied via Naukri.com and was interviewed in Mar 2021. There were 4 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. About Billing Procedure
  • Q2. About Checklist
  • Q3. About IS Code related to Billing and QS
  • Q4. About BBS of reinforcement
  • Q5. About Previous Companies

Interview Preparation Tips

Interview preparation tips for other job seekers - Structure and Finishing Fundamental knowledge should be clear et every stage
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Aug 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Technical questions
Round 3 - Technical 

(1 Question)

  • Q1. Technical questions
Round 4 - HR 

(1 Question)

  • Q1. Salary discussion
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jan 2024. There were 3 interview rounds.

Round 1 - Aptitude Test 

Written paper as per site and codes

Round 2 - Group Discussion 

It’s about Quality and execution with VP and audit team

Round 3 - HR 

(2 Questions)

  • Q1. Salary discussion
  • Q2. Joining procedures and company policy
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I appeared for an interview before Mar 2024, where I was asked the following questions.

  • Q1. Tell me about yourself
  • Q2. Job descriptionbriefly
  • Q3. Structure related questions

Northern Sky Properties Interview FAQs

How many rounds are there in Northern Sky Properties Finishing Supervisor interview?
Northern Sky Properties interview process usually has 3 rounds. The most common rounds in the Northern Sky Properties interview process are Resume Shortlist, Technical and Group Discussion.
What are the top questions asked in Northern Sky Properties Finishing Supervisor interview?

Some of the top questions asked at the Northern Sky Properties Finishing Supervisor interview -

  1. M30 concrete description about t...read more
  2. What isM-25 concr...read more

Tell us how to improve this page.

Northern Sky Properties Finishing Supervisor Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Pittie Group Interview Questions
2.6
 • 17 Interviews
Ambience Group Interview Questions
3.4
 • 16 Interviews
Maxinfra Interview Questions
4.2
 • 11 Interviews
91springboard Interview Questions
3.7
 • 11 Interviews
Reliable Spaces Interview Questions
2.8
 • 10 Interviews
Ashar group Interview Questions
3.5
 • 9 Interviews
View all
Project Engineer
4 salaries
unlock blur

₹3.5 L/yr - ₹5.5 L/yr

Site Engineer
3 salaries
unlock blur

₹3 L/yr - ₹6 L/yr

Store Incharge
3 salaries
unlock blur

₹2.4 L/yr - ₹2.4 L/yr

Legal Consultant
3 salaries
unlock blur

₹2.8 L/yr - ₹4.8 L/yr

Senior Site Engineer
3 salaries
unlock blur

₹3 L/yr - ₹4 L/yr

Explore more salaries
Compare Northern Sky Properties with

Signature Global

4.0
Compare

Pittie Group

2.7
Compare

Maxinfra

4.2
Compare

Advance India Projects

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview