Nokia
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
I applied via Approached by Company and was interviewed before Oct 2023. There was 1 interview round.
Plant determination is based on factors like location, capacity, and production requirements.
Consider the geographical location of the plant
Evaluate the production capacity of the plant
Take into account the specific production requirements of the products
Storage location is determined based on factors like product characteristics, storage requirements, accessibility, and inventory management system.
Storage location is determined based on the size and weight of the product.
Product characteristics such as temperature sensitivity or hazardous nature may influence storage location.
Accessibility and frequency of retrieval also play a role in determining storage location.
Inv...
I applied via Approached by Company and was interviewed before Sep 2022. There were 2 interview rounds.
General knowledge questions
Technical Lead
498
salaries
| ₹7.4 L/yr - ₹28 L/yr |
Technical Specialist
475
salaries
| ₹11 L/yr - ₹29 L/yr |
Software Engineer
460
salaries
| ₹7 L/yr - ₹23.8 L/yr |
R&D Engineer
427
salaries
| ₹7 L/yr - ₹25.9 L/yr |
Senior Technical Specialist
242
salaries
| ₹16.7 L/yr - ₹43 L/yr |
Samsung
Apple
Huawei Technologies
Xiaomi