I applied via Recruitment Consulltant and was interviewed in Dec 2021. There were 2 interview rounds.
The rate of plaster and other specifications depend on various factors such as the type of plaster, surface area, and labor cost.
The rate of plaster is usually calculated per square foot or square meter.
The type of plaster used can affect the rate, for example, gypsum plaster is cheaper than cement plaster.
The surface area to be plastered also affects the rate, as larger areas may require more labor and materials.
Other...
Top trending discussions
I applied via Referral and was interviewed before Feb 2022. There were 4 interview rounds.
based on 1 review
Rating in categories
Architect
4
salaries
| ₹5.2 L/yr - ₹9.2 L/yr |
Accounts Manager
4
salaries
| ₹5.1 L/yr - ₹5.1 L/yr |
Site Engineer
4
salaries
| ₹4 L/yr - ₹4.6 L/yr |
Store Executive
4
salaries
| ₹3.4 L/yr - ₹4.8 L/yr |
Senior Engineer
3
salaries
| ₹5.2 L/yr - ₹7.2 L/yr |
DLF
Godrej Properties
Sobha
Prestige Group