i
Navitasys India
Filter interviews by
I applied via Referral and was interviewed in Sep 2021. There were 4 interview rounds.
Landing price can be calculated by adding the FOB price with freight, insurance, customs duty, and other charges.
FOB price is the cost of goods and transportation to the port of shipment
Freight cost is the cost of shipping the goods from the port of shipment to the port of destination
Insurance cost is the cost of insuring the goods during transit
Customs duty is the tax imposed by the importing country on the imported g...
In case of a global shortage of an exclusive semiconductor, I would take the following actions:
Identify alternative suppliers or manufacturers who can provide the required semiconductor
Negotiate with existing suppliers to increase the supply or prioritize our orders
Explore the possibility of redesigning the product to use a different semiconductor
Collaborate with other companies or industry associations to find a colle...
I was interviewed in Jan 2025.
Quality is the measure of excellence or superiority of a product or service.
Quality is meeting or exceeding customer expectations
It involves consistency, reliability, and durability
Quality is achieved through continuous improvement and adherence to standards
Examples include defect-free products, high customer satisfaction, and meeting specifications
6S is a methodology used to organize a workplace for efficiency and effectiveness.
Sort: Remove unnecessary items from the workplace
Set in order: Organize remaining items in a logical manner
Shine: Clean and inspect the workplace regularly
Standardize: Establish standards and procedures for maintaining the workplace
Sustain: Ensure the 6S system is consistently followed
Safety: Ensure workplace safety measures are in place
The 7 QC tools are a set of techniques used for quality control and problem-solving in manufacturing and other industries.
Check sheets: Used to collect and organize data, such as tallying defects on a production line.
Histograms: Visual representation of data distribution, helpful for identifying patterns and trends.
Pareto charts: Shows the most significant factors contributing to a problem, helping prioritize improveme...
The least count of Vernier caliper is 0.02 mm, micrometer is 0.01 mm, and height gauge is 0.02 mm.
Vernier caliper least count: 0.02 mm
Micrometer least count: 0.01 mm
Height gauge least count: 0.02 mm
Why-Why Analysis is a problem-solving technique that involves asking 'why' multiple times to get to the root cause of a problem.
Identify the problem or issue that needs to be addressed
Ask 'why' multiple times to uncover the underlying causes of the problem
Continue asking 'why' until the root cause is identified
Use the 5 Whys technique to systematically dig deeper into the issue
Develop solutions based on the root cause
5W 1H Analysis is a method used to gather information by asking Who, What, Where, When, Why, and How questions.
Who - Identify the person or group involved
What - Determine the event or action being analyzed
Where - Pinpoint the location or context of the event
When - Establish the time frame or sequence of events
Why - Understand the reasons or motivations behind the event
How - Explore the methods or processes used in the
Audit is a systematic and independent examination of processes, systems, and records to ensure compliance with standards and regulations.
Audits are conducted to identify areas of improvement and ensure compliance with regulations and standards.
There are different types of audits such as internal audits, external audits, financial audits, and quality audits.
Auditors review processes, systems, and records to identify non...
Control plan is a detailed document that outlines the critical steps and parameters for ensuring quality in a manufacturing process.
Control plan is a key component of the overall quality management system.
It includes details on process steps, key process parameters, monitoring methods, and response plans.
Control plans help ensure consistency and quality in production.
Examples of items included in a control plan are pro...
I have 5 years of work experience as a Quality Engineer.
I have worked in the manufacturing industry for 3 years, focusing on quality control processes.
I have 2 years of experience in the automotive industry, implementing quality improvement initiatives.
I have led cross-functional teams to address quality issues and drive continuous improvement.
Seeking new challenges and growth opportunities in a different work environment.
Desire for career advancement
Looking for new challenges
Seeking better work-life balance
Relocation to a different city
Company downsizing or restructuring
I applied via Naukri.com and was interviewed in Dec 2024. There were 2 interview rounds.
Transformers are devices that transfer electrical energy between two or more circuits through electromagnetic induction.
Transformers can be classified based on their construction (core type, shell type), cooling method (oil-immersed, dry-type), and application (power, distribution, instrument, etc.)
Examples of transformers include power transformers used in power distribution networks, distribution transformers used in...
Different types of motors include DC motors, AC motors, stepper motors, and servo motors.
DC motors: Direct current motors that convert electrical energy into mechanical energy.
AC motors: Alternating current motors that use alternating current to produce rotational motion.
Stepper motors: Motors that move in discrete steps, commonly used in robotics and automation.
Servo motors: Motors that use feedback to control the pos
I am a dedicated and experienced Project Engineer with a strong background in managing engineering projects from conception to completion.
Bachelor's degree in Engineering
5+ years of experience in project management
Proficient in project planning and scheduling software
Strong communication and leadership skills
Managed a team of engineers to successfully complete a major infrastructure project
Dynamo is a visual programming tool that is used in building information modeling (BIM) software like Autodesk Revit.
Dynamo allows users to create logic and automation for design tasks in BIM software.
It uses a node-based interface where users can connect different nodes to create workflows.
Dynamo is commonly used for parametric design, data management, and computational design in architecture and engineering.
It can be...
Navitasys India interview questions for popular designations
Developed a quality control system for a manufacturing company to improve product consistency and reduce defects.
Researched industry standards and best practices for quality control
Designed and implemented a data collection system to track product quality metrics
Collaborated with cross-functional teams to analyze data and identify areas for improvement
Implemented statistical process control techniques to monitor and im
Semiconductors have conductivity between conductors and insulators, allowing for control of electrical flow.
Semiconductors have conductivity between conductors and insulators
Conductors have high conductivity and allow electricity to flow easily
Examples of semiconductors include silicon and germanium
Examples of conductors include metals like copper and aluminum
I am a dedicated Quality Engineer with a strong background in ensuring product quality and compliance with industry standards.
Experienced in conducting quality audits and inspections
Skilled in root cause analysis and implementing corrective actions
Proficient in using quality tools such as FMEA, Control Charts, and Pareto Analysis
My goal after 5 years is to become a senior Quality Engineer, leading a team and implementing innovative quality improvement strategies.
Advance to a senior Quality Engineer role
Lead a team of quality professionals
Implement innovative quality improvement strategies
Continuously improve my skills and knowledge through training and certifications
Get interview-ready with Top Navitasys India Interview Questions
I applied via Approached by Company and was interviewed in Dec 2024. There were 2 interview rounds.
I am a dedicated SMT Engineer with 5 years of experience in PCB assembly and troubleshooting.
Experienced in surface mount technology (SMT) processes
Skilled in operating SMT equipment such as pick-and-place machines and reflow ovens
Proficient in reading and interpreting PCB schematics and assembly drawings
Strong problem-solving skills in identifying and resolving soldering defects
Familiar with IPC standards for PCB asse
Seeking new challenges and growth opportunities in a dynamic work environment.
Looking for career advancement
Interested in learning new technologies and processes
Seeking a more collaborative team environment
Want to work for a company with better work-life balance
I want to join Navitasys India because of their reputation for innovation and growth opportunities in the field of SMT engineering.
Navitasys India has a strong reputation for innovation in the SMT engineering industry.
I am impressed by the growth opportunities and career development prospects at Navitasys India.
I believe that working at Navitasys India will allow me to further develop my skills and contribute to cuttin
PWI stands for Process Window Index in a reflow profile, indicating the process window's capability to produce acceptable solder joints.
PWI is a metric used to evaluate the quality of a reflow profile in soldering processes.
It is calculated by comparing the peak temperature, time above liquidus, and cooling rate of the reflow profile to the specified limits.
A higher PWI value indicates a wider process window and better...
To control SMT defects, implement proper quality control measures, train staff on best practices, maintain equipment regularly, and analyze root causes of defects.
Implement proper quality control measures to catch defects early on
Train staff on best practices for handling components and operating machinery
Regularly maintain and calibrate equipment to ensure accurate placement of components
Analyze root causes of defects...
To make an analysis report, gather data, identify key metrics, analyze data, create visualizations, and draw conclusions.
Gather relevant data from various sources
Identify key metrics to focus on
Analyze the data using statistical methods
Create visualizations such as charts or graphs to present the findings
Draw conclusions and make recommendations based on the analysis
5W1H is a method used for gathering information by asking Who, What, When, Where, Why, and How.
Who - refers to the person or group involved
What - refers to the action or event
When - refers to the time or date
Where - refers to the location
Why - refers to the reason or purpose
How - refers to the method or process
I applied via Naukri.com and was interviewed in Nov 2024. There were 2 interview rounds.
I applied via LinkedIn and was interviewed in Nov 2024. There were 2 interview rounds.
PLC inputs and outputs are used to communicate with sensors, actuators, and other devices in an industrial control system.
PLC inputs are used to receive signals from sensors or other devices.
PLC outputs are used to send signals to actuators or other devices.
Inputs and outputs are typically connected to the PLC using terminal blocks or connectors.
Examples of inputs include push buttons, limit switches, and temperature s...
My notice period is 2 weeks and my salary expectations are in line with industry standards.
Notice period: 2 weeks
Salary expectations: Industry standards
There are 7 layers in the OSI Model.
The OSI Model stands for Open Systems Interconnection Model.
It is a conceptual framework used to understand network communication.
The 7 layers are: Physical, Data Link, Network, Transport, Session, Presentation, and Application.
Each layer has specific functions and protocols associated with it.
For example, HTTP operates at the Application layer, while TCP operates at the Transport la
The color coding of RJ45 connector is used to identify the purpose of each wire in the cable.
The color coding for RJ45 connector follows the T568A or T568B standard.
In T568A, the color coding is white-green, green, white-orange, blue, white-blue, orange, white-brown, brown.
In T568B, the color coding is white-orange, orange, white-green, blue, white-blue, green, white-brown, brown.
The color coding helps ensure that the ...
I have worked as a Desktop Support Engineer for XYZ Company for 2 years.
Provided technical support to end users for hardware and software issues
Installed and configured operating systems and software applications
Troubleshooted network connectivity problems
Managed user accounts and permissions
Performed hardware upgrades and repairs
I applied via Walk-in and was interviewed in Nov 2024. There was 1 interview round.
Responsibility for production involves overseeing the manufacturing process to ensure efficiency, quality, and safety.
Ensuring production targets are met
Monitoring and improving production processes
Ensuring compliance with safety regulations
Managing resources effectively
Training and supervising production staff
Plan vs Actual & Kaizen involves comparing planned production targets with actual results and implementing continuous improvement.
Plan vs Actual involves comparing planned production targets with actual results to identify discrepancies
Kaizen is the practice of continuous improvement in processes and systems
Implementing Kaizen involves analyzing data, identifying areas for improvement, and making incremental change...
Top trending discussions
The duration of Navitasys India interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 148 interviews
Interview experience
based on 801 reviews
Rating in categories
Assistant Engineer
234
salaries
| ₹0 L/yr - ₹0 L/yr |
Diploma Trainee Engineer
156
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Assistant Trainee
155
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Junior Engineer
90
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Engineer
73
salaries
| ₹0 L/yr - ₹0 L/yr |
TCS
Infosys
Wipro
HCLTech