Yes, I loaded the schedule with resources.
I ensured that all tasks in the schedule had the necessary resources assigned to them.
I considered the availability and skills of the resources when assigning them to tasks.
I regularly reviewed and updated the schedule to ensure that resources were allocated efficiently.
For example, in a construction project, I loaded the schedule with labor, equipment, and materials neede...
The progress percentage can be negative if the actual progress is less than the planned progress.
Negative variance indicates that the actual progress is behind the planned progress.
The updated schedule end date may not be changed if there are mitigating actions or recovery plans in place.
Factors such as resource constraints, delays in procurement, or unexpected issues can contribute to negative variance without ch...
WPS stands for Workflow Process Services. It is prepared by defining the workflow process and its steps.
Define the workflow process and its steps
Identify the inputs and outputs of each step
Specify the conditions for each step to execute
Design the user interface for the workflow
Test the workflow process before deployment
The standard for valve testing is API 598.
API 598 is the industry standard for valve testing
It covers testing procedures for both gate and globe valves
The standard includes requirements for pressure testing, seat and seal testing, and shell testing
API 598 also specifies acceptance criteria for each type of test
Valve manufacturers and testing facilities typically follow this standard
P&ID stands for Piping and Instrumentation Diagram. It is a schematic representation of a process system.
P&ID is used in engineering to show the interconnection of process equipment and the instrumentation used to control the process.
It includes symbols for valves, instruments, and pipelines, as well as information on the flow direction, pressure, and temperature of the process fluid.
P&ID is an important tool for ...
A welder must have proper training, certification, and experience to qualify.
Completion of a welding training program
Passing a welding certification test
Experience in welding techniques and safety measures
Knowledge of welding materials and equipment
Ability to read and interpret blueprints and schematics
I applied via Other and was interviewed in Mar 2021. There were 3 interview rounds.
The progress percentage can be negative if the actual progress is less than the planned progress.
Negative variance indicates that the actual progress is behind the planned progress.
The updated schedule end date may not be changed if there are mitigating actions or recovery plans in place.
Factors such as resource constraints, delays in procurement, or unexpected issues can contribute to negative variance without changin...
Experienced Planning Manager with a strong background in project management, strategic planning, and team leadership.
Over 8 years of experience in planning and project management, successfully leading cross-functional teams.
Implemented a new project tracking system that improved efficiency by 30%, ensuring timely delivery of projects.
Skilled in data analysis and forecasting, using tools like Excel and Tableau to drive ...
Yes, I loaded the schedule with resources.
I ensured that all tasks in the schedule had the necessary resources assigned to them.
I considered the availability and skills of the resources when assigning them to tasks.
I regularly reviewed and updated the schedule to ensure that resources were allocated efficiently.
For example, in a construction project, I loaded the schedule with labor, equipment, and materials needed for...
posted on 18 Nov 2020
I applied via Recruitment Consultant and was interviewed before Nov 2019. There was 1 interview round.
WPS stands for Workflow Process Services. It is prepared by defining the workflow process and its steps.
Define the workflow process and its steps
Identify the inputs and outputs of each step
Specify the conditions for each step to execute
Design the user interface for the workflow
Test the workflow process before deployment
A welder must have proper training, certification, and experience to qualify.
Completion of a welding training program
Passing a welding certification test
Experience in welding techniques and safety measures
Knowledge of welding materials and equipment
Ability to read and interpret blueprints and schematics
The standard for valve testing is API 598.
API 598 is the industry standard for valve testing
It covers testing procedures for both gate and globe valves
The standard includes requirements for pressure testing, seat and seal testing, and shell testing
API 598 also specifies acceptance criteria for each type of test
Valve manufacturers and testing facilities typically follow this standard
P&ID stands for Piping and Instrumentation Diagram. It is a schematic representation of a process system.
P&ID is used in engineering to show the interconnection of process equipment and the instrumentation used to control the process.
It includes symbols for valves, instruments, and pipelines, as well as information on the flow direction, pressure, and temperature of the process fluid.
P&ID is an important tool for desig...
Top trending discussions
I applied via Company Website and was interviewed before Jun 2021. There were 2 interview rounds.
First round was coding as well as aptitude done together went well I guess focusing on codes helps a lot.
I applied via Naukri.com
I expect Amazon to foster innovation, provide growth opportunities, and maintain a customer-centric culture.
Opportunities for professional development, such as training programs and mentorship.
A collaborative work environment that encourages teamwork and idea sharing.
Access to cutting-edge technology and resources to drive innovation.
A strong focus on customer satisfaction, ensuring that every decision prioritizes the ...
I applied via Recruitment Consulltant and was interviewed before Jul 2021. There was 1 interview round.
Experienced professional with a strong educational background and clear career ambitions, eager to contribute to the company's success.
I have over 5 years of experience in project management, leading teams to successfully deliver complex projects on time.
I hold a Master's degree in Business Administration from XYZ University, where I specialized in strategic management.
My family has always emphasized the importance of ...
I applied via Naukri.com and was interviewed before Feb 2020. There were 3 interview rounds.
Workflow, trigger, reports, roles, profiles, permission set, and sharing rules are all important features in Salesforce.
Workflow is a series of automated steps that can be used to streamline business processes.
Triggers are used to execute code before or after a record is inserted, updated, or deleted.
Reports are used to display data in a visual format, such as a table or chart.
Roles are used to define the hierarchy of ...
I appeared for an interview before Jul 2020.
Yes, Infosys is listed on the Indian stock exchanges as well as on the NYSE.
Infosys is listed on the Bombay Stock Exchange (BSE) and National Stock Exchange of India (NSE)
It is also listed on the New York Stock Exchange (NYSE)
Infosys has a market capitalization of over $80 billion as of 2021
Interview questions for an Associate position cover various aspects like motivation, skills, and handling pressure.
1) Tmaus: This could refer to a specific term or acronym; clarify its meaning during the interview.
2) Leaving previous job: Focus on seeking new challenges or growth opportunities, not negative experiences.
3) Technical skills: Highlight relevant skills like data analysis, programming languages, or software...
I applied via Job Fair and was interviewed before Feb 2021. There were 2 interview rounds.