Q1. Plan vs progress percentage having negative variance, but updated schedule end date is not getting changed (later finish), why?

Ans.

The progress percentage can be negative if the actual progress is less than the planned progress.

  • Negative variance indicates that the actual progress is behind the planned progress.

  • The updated schedule end date may not be changed if there are mitigating actions or recovery plans in place.

  • Factors such as resource constraints, delays in procurement, or unexpected issues can contribute to negative variance without changing the end date.

View 1 answer

Q2. What is requirements to qualify a welder?

Ans.

A welder must have proper training, certification, and experience to qualify.

  • Completion of a welding training program

  • Passing a welding certification test

  • Experience in welding techniques and safety measures

  • Knowledge of welding materials and equipment

  • Ability to read and interpret blueprints and schematics

Add your answer

Q3. Which is standard for valve testing?

Ans.

The standard for valve testing is API 598.

  • API 598 is the industry standard for valve testing

  • It covers testing procedures for both gate and globe valves

  • The standard includes requirements for pressure testing, seat and seal testing, and shell testing

  • API 598 also specifies acceptance criteria for each type of test

  • Valve manufacturers and testing facilities typically follow this standard

Add your answer
Ans.

WPS stands for Workflow Process Services. It is prepared by defining the workflow process and its steps.

  • Define the workflow process and its steps

  • Identify the inputs and outputs of each step

  • Specify the conditions for each step to execute

  • Design the user interface for the workflow

  • Test the workflow process before deployment

Add your answer
Discover Siddhartha Engineering Limited interview dos and don'ts from real experiences
Ans.

P&ID stands for Piping and Instrumentation Diagram. It is a schematic representation of a process system.

  • P&ID is used in engineering to show the interconnection of process equipment and the instrumentation used to control the process.

  • It includes symbols for valves, instruments, and pipelines, as well as information on the flow direction, pressure, and temperature of the process fluid.

  • P&ID is an important tool for designing, operating, and maintaining process systems in indust...read more

Add your answer

Q6. Did you loaded schedule with resources?

Ans.

Yes, I loaded the schedule with resources.

  • I ensured that all tasks in the schedule had the necessary resources assigned to them.

  • I considered the availability and skills of the resources when assigning them to tasks.

  • I regularly reviewed and updated the schedule to ensure that resources were allocated efficiently.

  • For example, in a construction project, I loaded the schedule with labor, equipment, and materials needed for each task.

View 1 answer
Contribute & help others!
Write a review
Share interview
Contribute salary
Add office photos
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Top Interview Questions from Similar Companies

3.7
 • 4.4k Interview Questions
3.8
 • 347 Interview Questions
3.9
 • 168 Interview Questions
3.3
 • 142 Interview Questions
3.8
 • 135 Interview Questions
3.8
 • 131 Interview Questions
View all
Top Nasser S.al-hajri & Partners Co.industrial Contractors Interview Questions And Answers
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
70 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions
Get AmbitionBox app

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter