Q1. Plan vs progress percentage having negative variance, but updated schedule end date is not getting changed (later finish), why?
The progress percentage can be negative if the actual progress is less than the planned progress.
Negative variance indicates that the actual progress is behind the planned progress.
The updated schedule end date may not be changed if there are mitigating actions or recovery plans in place.
Factors such as resource constraints, delays in procurement, or unexpected issues can contribute to negative variance without changing the end date.
Q2. What is requirements to qualify a welder?
A welder must have proper training, certification, and experience to qualify.
Completion of a welding training program
Passing a welding certification test
Experience in welding techniques and safety measures
Knowledge of welding materials and equipment
Ability to read and interpret blueprints and schematics
Q3. Which is standard for valve testing?
The standard for valve testing is API 598.
API 598 is the industry standard for valve testing
It covers testing procedures for both gate and globe valves
The standard includes requirements for pressure testing, seat and seal testing, and shell testing
API 598 also specifies acceptance criteria for each type of test
Valve manufacturers and testing facilities typically follow this standard
Q4. How to prepare wps?
WPS stands for Workflow Process Services. It is prepared by defining the workflow process and its steps.
Define the workflow process and its steps
Identify the inputs and outputs of each step
Specify the conditions for each step to execute
Design the user interface for the workflow
Test the workflow process before deployment
Q5. What is P&ID?
P&ID stands for Piping and Instrumentation Diagram. It is a schematic representation of a process system.
P&ID is used in engineering to show the interconnection of process equipment and the instrumentation used to control the process.
It includes symbols for valves, instruments, and pipelines, as well as information on the flow direction, pressure, and temperature of the process fluid.
P&ID is an important tool for designing, operating, and maintaining process systems in indust...read more
Q6. Did you loaded schedule with resources?
Yes, I loaded the schedule with resources.
I ensured that all tasks in the schedule had the necessary resources assigned to them.
I considered the availability and skills of the resources when assigning them to tasks.
I regularly reviewed and updated the schedule to ensure that resources were allocated efficiently.
For example, in a construction project, I loaded the schedule with labor, equipment, and materials needed for each task.