5 Questions

  • Q1. How to prepare welder qualification test?
  • Q2. How to prepare wps?
  • Ans. 

    WPS stands for Workflow Process Services. It is prepared by defining the workflow process and its steps.

    • Define the workflow process and its steps

    • Identify the inputs and outputs of each step

    • Specify the conditions for each step to execute

    • Design the user interface for the workflow

    • Test the workflow process before deployment

  • Answered by AI
  • Q3. What is requirements to qualify a welder?
  • Ans. 

    A welder must have proper training, certification, and experience to qualify.

    • Completion of a welding training program

    • Passing a welding certification test

    • Experience in welding techniques and safety measures

    • Knowledge of welding materials and equipment

    • Ability to read and interpret blueprints and schematics

  • Answered by AI
  • Q4. Which is standard for valve testing?
  • Ans. 

    The standard for valve testing is API 598.

    • API 598 is the industry standard for valve testing

    • It covers testing procedures for both gate and globe valves

    • The standard includes requirements for pressure testing, seat and seal testing, and shell testing

    • API 598 also specifies acceptance criteria for each type of test

    • Valve manufacturers and testing facilities typically follow this standard

  • Answered by AI
  • Q5. What is P&ID?
  • Ans. 

    P&ID stands for Piping and Instrumentation Diagram. It is a schematic representation of a process system.

    • P&ID is used in engineering to show the interconnection of process equipment and the instrumentation used to control the process.

    • It includes symbols for valves, instruments, and pipelines, as well as information on the flow direction, pressure, and temperature of the process fluid.

    • P&ID is an important tool for desig...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare with ASME 31.3,SEC 5,9 31.8

Interview questions from similar companies

I applied via Recruitment Consultant and was interviewed in Nov 2020. There were 4 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Why we choose you
  • Q2. Ar you problem solver and how you can be?
  • Q3. What's your aim

Interview Preparation Tips

Interview preparation tips for other job seekers - Please prepare your basic skill strong and be problem solver
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
-

I applied via Job Portal and was interviewed in Dec 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Difference between PECI and PICOF
  • Q2. Difference between CCW and DIS CCW
Round 2 - Assignment 

Good focused on basics of Workday integration

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well and focus on studio
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in May 2024. There were 3 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. EIB vs CCW difference
  • Ans. 

    EIB is a tool for non-technical users to import data, while CCW is a tool for technical users to build integrations.

    • EIB (Enterprise Interface Builder) is a tool in Workday that allows non-technical users to easily import data into the system.

    • CCW (Cloud Connect for Workday) is a tool for technical users to build integrations between Workday and other systems using web services.

    • EIB is more user-friendly and suitable for ...

  • Answered by AI
Round 2 - Behavioral 

(1 Question)

  • Q1. Prism and Extend experience
Round 3 - HR 

(1 Question)

  • Q1. About salary expectations

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Coding Test 

AZure plateform they have asked more about

Round 2 - One-on-one 

(1 Question)

  • Q1. Introduction of both

Interview Preparation Tips

Interview preparation tips for other job seekers - prepare well

I was interviewed in May 2022.

Round 1 - Technical 

(2 Questions)

  • Q1. How you handle performance issues in Integration tools
  • Ans. 

    Performance issues in integration tools are handled by identifying bottlenecks, optimizing code, and monitoring system resources.

    • Identify the root cause of the performance issue

    • Optimize code by reducing unnecessary processing and improving algorithms

    • Monitor system resources such as CPU, memory, and disk usage

    • Use caching and load balancing to distribute workload

    • Perform regular maintenance and updates to keep the system

  • Answered by AI
  • Q2. Identify root cause of the problem as it could be network, file system or the application architecture. Find solution to remediate the issue rather than move the issue from one system to another.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be patient and calm. It is not necessary that you need to be aware of all topics in a technology. Instead of saying something wrong, tell them that you haven't worked on the topic.

I applied via Approached by Company and was interviewed before Jul 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Mulesoft what kind of nodes have you worked on
  • Ans. 

    I have worked on various nodes in Mulesoft including HTTP, Database, Salesforce, and File.

    • HTTP node for handling RESTful APIs

    • Database node for connecting to databases and executing SQL queries

    • Salesforce node for integrating with Salesforce CRM

    • File node for reading and writing files

    • Transform Message node for data transformation

    • Batch Processing node for processing large amounts of data

    • Error Handling node for handling err

  • Answered by AI
  • Q2. Define blacklist and Whitelist policy
  • Ans. 

    Blacklist and whitelist policies are used to control access to resources based on predefined rules.

    • Blacklist policy denies access to resources based on a predefined list of blocked items.

    • Whitelist policy allows access to resources based on a predefined list of approved items.

    • Blacklist policy is more restrictive than whitelist policy.

    • Examples of blacklist policy include blocking access to certain websites or IP addresse...

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. Why you want a job change
  • Ans. 

    I am seeking a job change to further develop my skills and broaden my experience as an Integration Architect.

    • Opportunity for professional growth

    • Desire to work with new technologies and challenges

    • Expand knowledge and expertise in integration architecture

    • Seeking a more challenging and fulfilling role

    • Looking for a company with a strong focus on innovation and collaboration

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Strong experience in your domain is the key.
Check the latest in in news for technology.

I applied via Recruitment Consulltant and was interviewed before Oct 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. About SAP PO and In depth of CPI
Round 3 - Technical 

(1 Question)

  • Q1. Deep on CPI and Cloud integration.

Interview Preparation Tips

Interview preparation tips for other job seekers - Learn deep on technical and more on the domain which ue attending
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Mar 2024. There were 2 interview rounds.

Round 1 - One-on-one 

(1 Question)

  • Q1. Questions were related to Integration templates and Workday reporting and some were related to my experience. Quality of questions was very average, one who have good understanding about skills will be abl...
Round 2 - HR 

(1 Question)

  • Q1. Normal questions, like what are the expectations, why Infosys, why you left you current employer

Interview Preparation Tips

Topics to prepare for Infosys Workday Integration Consultant interview:
  • Workday
  • Reporting
  • EIB
  • Core connector
  • Integrations
Interview preparation tips for other job seekers - Be confident, and only include the area you know better.
Do not push interview on they way where you don't know about the skill.
Interview experience
4
Good
Difficulty level
Easy
Process Duration
2-4 weeks
Result
-

I applied via Naukri.com and was interviewed in May 2024. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Technicsl Q relsted to CPI
Round 2 - Technical 

(1 Question)

  • Q1. Related to adapter in integration

Nasser S.al-hajri & Partners Co.industrial Contractors Interview FAQs

What are the top questions asked in Nasser S.al-hajri & Partners Co.industrial Contractors Integration Engineer ( Consultancy and System Integration) interview?

Some of the top questions asked at the Nasser S.al-hajri & Partners Co.industrial Contractors Integration Engineer ( Consultancy and System Integration) interview -

  1. What is requirements to qualify a weld...read more
  2. Which is standard for valve testi...read more
  3. How to prepare w...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

TCS Interview Questions
3.7
 • 10.4k Interviews
Accenture Interview Questions
3.9
 • 8.1k Interviews
Infosys Interview Questions
3.7
 • 7.6k Interviews
Wipro Interview Questions
3.7
 • 5.6k Interviews
Cognizant Interview Questions
3.8
 • 5.5k Interviews
Amazon Interview Questions
4.1
 • 5k Interviews
Capgemini Interview Questions
3.8
 • 4.8k Interviews
Tech Mahindra Interview Questions
3.5
 • 3.8k Interviews
HCLTech Interview Questions
3.5
 • 3.8k Interviews
Genpact Interview Questions
3.9
 • 3k Interviews
View all
Compare Nasser S.al-hajri & Partners Co.industrial Contractors with

TCS

3.7
Compare

Accenture

3.9
Compare

Wipro

3.7
Compare

Cognizant

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview