i
Narsingh Ispat
Filter interviews by
I applied via Referral and was interviewed in Mar 2021. There were 3 interview rounds.
Motors, stators, PLC, drives, and soft starters are all components used in electrical engineering.
A motor is a device that converts electrical energy into mechanical energy.
A stator is a stationary component in a motor that surrounds the rotor and provides a magnetic field for the rotor to interact with.
PLC stands for Programmable Logic Controller, which is a digital computer used to automate industrial processes.
A dri...
Top trending discussions
I applied via Company Website and was interviewed in Nov 2020. There were 3 interview rounds.
posted on 30 Sep 2024
I applied via Naukri.com and was interviewed in Mar 2022. There was 1 interview round.
I applied via Naukri.com and was interviewed in Feb 2021. There were 3 interview rounds.
posted on 22 Jan 2023
I applied via Company Website and was interviewed in Dec 2022. There were 4 interview rounds.
Preventive maintenance is scheduled maintenance to prevent breakdowns while predictive maintenance uses data to predict failures.
Preventive maintenance involves regularly scheduled maintenance to prevent equipment breakdowns and prolong the lifespan of equipment.
Predictive maintenance uses data analysis to predict when equipment failure is likely to occur, allowing for maintenance to be scheduled before a breakdown occ...
PLC stands for Programmable Logic Controller and HMI stands for Human Machine Interface.
PLC is a digital computer used for automation of electromechanical processes.
It is used to control machinery on factory assembly lines, amusement rides, or light fixtures.
HMI is a graphical interface that allows humans to interact with machines.
It provides a visual representation of the process being controlled by the PLC.
Examples o...
Power factor can be managed by using capacitors, improving equipment efficiency, and reducing reactive power.
Install capacitors to offset reactive power and improve power factor
Upgrade equipment to more efficient models
Reduce the amount of reactive power by optimizing operations
Implement power factor correction techniques
Regularly monitor and maintain power factor levels
I applied via Naukri.com and was interviewed in Sep 2024. There was 1 interview round.
The machine name at my current company is XYZ-2000 and it has a capacity of 500 units per hour.
Machine name: XYZ-2000
Capacity: 500 units per hour
posted on 27 Dec 2023
I applied via Approached by Company and was interviewed in Jun 2023. There were 3 interview rounds.
I applied via Job Portal and was interviewed before Mar 2021. There were 3 interview rounds.
based on 1 review
Rating in categories
Shift Incharge
7
salaries
| ₹2.4 L/yr - ₹3.8 L/yr |
Graduate Engineer Trainee (Get)
7
salaries
| ₹1.5 L/yr - ₹2 L/yr |
Electrical Engineer
6
salaries
| ₹1.4 L/yr - ₹4.3 L/yr |
Assistant Engineer
5
salaries
| ₹2 L/yr - ₹3.4 L/yr |
Senior Engineer
4
salaries
| ₹2 L/yr - ₹3.6 L/yr |
SHYAM METALICS AND ENERGY
Jai Balaji Group
Electrotherm
Welspun Corp