Filter interviews by
posted on 23 Jan 2023
I applied via Job Fair and was interviewed in Dec 2022. There were 2 interview rounds.
Passive and active electrical components are two types of components used in electronic circuits.
Passive components do not require an external power source to function, such as resistors, capacitors, and inductors.
Active components require an external power source to function and can amplify or control the electrical signal, such as transistors, diodes, and integrated circuits.
Passive components are typically used to c...
A resistor is used to limit the flow of electric current in a circuit.
Resistors are used to control the amount of current flowing through a circuit.
They are commonly used to protect components from excessive current.
Resistors are also used to divide voltage in a circuit.
They can be used to create voltage drops or to adjust signal levels.
Resistors are used in various electronic devices such as amplifiers, radios, and co
I applied via Approached by Company and was interviewed before Jun 2021. There were 2 interview rounds.
Overall plant quality handling involves ensuring that all processes and products meet quality standards.
Establishing and implementing quality control procedures
Conducting regular audits and inspections
Training employees on quality standards and procedures
Identifying and addressing quality issues and implementing corrective actions
Collaborating with other departments to ensure quality throughout the plant
Maintaining doc
Top trending discussions
I applied via Campus Placement and was interviewed before Jan 2020. There were 4 interview rounds.
I applied via Campus Placement and was interviewed before May 2020. There were 4 interview rounds.
I applied via Campus Placement and was interviewed before Feb 2020. There were 4 interview rounds.
I applied via Campus Placement and was interviewed before Jul 2020. There were 4 interview rounds.
The project involved designing and implementing a new network infrastructure for a large corporation.
Conducted a thorough analysis of the existing network infrastructure
Designed a new network architecture that met the company's needs
Implemented the new network infrastructure with minimal disruption to business operations
Tested and optimized the new network to ensure optimal performance
Provided ongoing support and maint
I applied via Walk-in and was interviewed before Feb 2020. There were 4 interview rounds.
I applied via Campus Placement and was interviewed before Feb 2020. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed before Aug 2020. There was 1 interview round.
I applied via Campus Placement and was interviewed before Jun 2020. There were 3 interview rounds.
based on 2 interviews
Interview experience
based on 9 reviews
Rating in categories
Assistant Manager
6
salaries
| ₹6.5 L/yr - ₹11.2 L/yr |
Senior Engineer
5
salaries
| ₹6.2 L/yr - ₹8.2 L/yr |
Engineer
3
salaries
| ₹3.2 L/yr - ₹4.2 L/yr |
Purchase Executive
3
salaries
| ₹3.8 L/yr - ₹5 L/yr |
QA Engineer
3
salaries
| ₹1.8 L/yr - ₹2 L/yr |
TCS
Accenture
Wipro
Cognizant