Time to remove formwork varies for different types of structural members.
Time to remove formwork for columns is typically 1-2 days
Time to remove formwork for beams is usually 7 days
Time to remove formwork for slabs can range from 7-28 days depending on the type of concrete used
Time to remove formwork for walls is generally around 24 hours
Different grades of cement refer to the varying strengths and compositions of cement used in construction.
Different grades of cement are classified based on their compressive strength, such as 33 grade, 43 grade, and 53 grade.
The higher the grade number, the higher the compressive strength of the cement.
Each grade of cement is suitable for different types of construction projects, with 53 grade cement being commonly us
Top trending discussions
I applied via Naukri.com and was interviewed before Mar 2021. There were 4 interview rounds.
Technical questions related to domain.
Carbonation is the process of dissolving carbon dioxide gas in a liquid.
Occurs naturally in carbonated mineral water
Used in the production of carbonated beverages
Can affect the pH of a liquid
Can cause corrosion in concrete structures
Pratical test by Auto level.
I applied via Indeed and was interviewed in Jul 2023. There were 2 interview rounds.
The erection of a cement mill involves the installation and assembly of the mill equipment and machinery.
The cement mill is typically a large cylindrical structure where raw materials are ground into fine powder.
The erection process includes the installation of the mill shell, liners, diaphragm, and grinding media.
Proper alignment and leveling of the mill components are crucial for efficient operation.
Electrical and me...
The procedure of erection involves the process of assembling and installing structural components to create a stable and functional structure.
Planning and preparation
Site preparation and foundation
Assembly of structural components
Installation of utilities and systems
Finishing and testing
Final inspection and handover
Planning of the erection involves creating a detailed plan for the construction process.
Identify the scope and objectives of the project
Determine the sequence of activities and their dependencies
Allocate resources and manpower
Create a schedule and timeline
Consider safety measures and risk management
Coordinate with other teams and stakeholders
Monitor progress and make adjustments as necessary
I applied via Naukri.com and was interviewed in Oct 2023. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Mar 2022. There was 1 interview round.
I applied via Walk-in and was interviewed in Jun 2022. There were 2 interview rounds.
I applied via Company Website and was interviewed in Apr 2022. There were 3 interview rounds.
Subject
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Sales Officer
72
salaries
| ₹2.2 L/yr - ₹5.7 L/yr |
Senior Sales Officer
55
salaries
| ₹3 L/yr - ₹6.2 L/yr |
Assistant Manager
54
salaries
| ₹4.5 L/yr - ₹9 L/yr |
Assistant Engineer
39
salaries
| ₹2.4 L/yr - ₹4 L/yr |
Engineer
29
salaries
| ₹3 L/yr - ₹5 L/yr |
ACC
JK Cement
Ambuja Cements
The Ramco Cements