I applied via Referral and was interviewed in Mar 2023. There were 2 interview rounds.
The total wastage of steel in construction as per standard is typically around 2-3%.
The standard wastage of steel in construction is usually around 2-3% of the total steel used.
Factors such as cutting, bending, and handling contribute to the wastage of steel.
Efficient planning and utilization of steel can help minimize wastage.
Regular monitoring and supervision can also help in reducing steel wastage.
For example, if a ...
The design mix of M30 concrete typically consists of a mix ratio of 1:1:2 of cement, sand, and aggregates.
M30 concrete has a compressive strength of 30 MPa (megapascals) after 28 days of curing.
The design mix for M30 concrete is usually 1:1:2, which means 1 part cement, 1 part sand, and 2 parts aggregates.
Water-cement ratio for M30 concrete is typically around 0.45.
Top trending discussions
posted on 15 Sep 2024
Work permits are documents that authorize specific work to be done in a controlled manner to ensure safety.
Work permits are used to control hazardous work activities.
They outline the precautions to be taken before, during, and after the work.
Examples include hot work permits, confined space entry permits, and electrical work permits.
I applied via Naukri.com
ASME Section code for Quality purpose is Section VIII for pressure vessels
ASME Section VIII is specifically for pressure vessels
It covers design, fabrication, inspection, testing, and certification requirements
Quality engineers refer to Section VIII for guidance on ensuring compliance with standards
Examples of pressure vessels include boilers, heat exchangers, and storage tanks
posted on 10 Jul 2024
I applied via Company Website and was interviewed in Jun 2024. There were 2 interview rounds.
posted on 18 Mar 2024
I applied via Approached by Company and was interviewed in Nov 2023. There were 2 interview rounds.
posted on 31 Mar 2024
posted on 20 Dec 2023
I applied via Job Portal and was interviewed in Nov 2023. There were 3 interview rounds.
I applied via Job Fair and was interviewed in Jan 2023. There were 2 interview rounds.
posted on 4 Oct 2022
I applied via Referral and was interviewed in Sep 2022. There were 2 interview rounds.
Mivan shuttering is preferred over commercial shuttering work due to its advantages in terms of speed, cost-effectiveness, and quality.
Mivan shuttering is a fast-paced construction technique that uses aluminum formwork instead of traditional timber formwork.
It allows for rapid construction, reducing the overall project duration.
Mivan shuttering is highly cost-effective as it requires less labor and material compared to...
The number of carpenters and fitters required for 4 cycles of slab area 15000sqm depends on the project timeline and complexity.
The number of carpenters and fitters required will depend on the project timeline and complexity.
The size of the slab area is not the only factor to consider when determining the number of carpenters and fitters needed.
Other factors to consider include the type of materials being used, the des...
The rate for carpenter and fitter for commercial and Mivan or Dropex shuttering work varies depending on factors such as location, experience, and project requirements.
The rate for carpenters and fitters can vary significantly based on the location of the project. Rates may be higher in urban areas compared to rural areas.
Experience level also plays a role in determining the rate. Highly skilled and experienced carpent...
Total safety is controlled through a combination of risk assessments, safety protocols, training, and continuous monitoring.
Conduct regular risk assessments to identify potential hazards and implement appropriate safety measures
Develop and enforce safety protocols and procedures for all activities
Provide comprehensive training to all employees on safety procedures and emergency response
Continuously monitor and evaluate...
My quality plan involves ensuring that all project deliverables meet or exceed customer expectations.
Establishing clear quality standards and metrics
Regularly monitoring and measuring project progress against these standards
Identifying and addressing any quality issues as soon as they arise
Ensuring that all team members are trained and equipped to deliver high-quality work
Continuously improving processes and procedures...
Cost control is essential for successful project management. Organogram helps in defining roles and responsibilities.
Cost control involves monitoring and managing project expenses to ensure they stay within the budget.
It requires identifying potential cost overruns and taking corrective actions to prevent them.
Organogram is a visual representation of the project team structure, showing the hierarchy of roles and respon...
based on 43 reviews
Rating in categories
Civil Site Engineer
43
salaries
| ₹1.8 L/yr - ₹4.5 L/yr |
Site Engineer
17
salaries
| ₹1.3 L/yr - ₹3.5 L/yr |
Civil Engineer
11
salaries
| ₹2.2 L/yr - ₹6 L/yr |
Site Supervisor
7
salaries
| ₹2 L/yr - ₹3 L/yr |
Project Manager
7
salaries
| ₹4.3 L/yr - ₹22 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
GMR Group