Filter interviews by
Be the first one to contribute and help others!
I applied via Walk-in and was interviewed before Mar 2020. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Mar 2023. There was 1 interview round.
I applied via Approached by Company and was interviewed before Jan 2022. There were 4 interview rounds.
To improve plant quality, we need to focus on soil health, pest management, and proper irrigation.
Conduct soil tests to determine nutrient deficiencies and amend accordingly
Implement integrated pest management strategies to reduce chemical usage
Ensure proper irrigation techniques are being used to prevent over or under watering
Regularly monitor plant health and adjust care as needed
Invest in employee training to ensure
Administration and security in an unionised environment
I applied via Recruitment Consulltant and was interviewed in Mar 2023. There were 4 interview rounds.
I am an experienced professional with strong leadership skills and a passion for driving team success.
Experienced professional with a track record of leading successful teams
Strong leadership skills and ability to motivate and inspire team members
Proven track record of achieving targets and delivering results
Excellent communication and interpersonal skills
Passionate about driving team success and fostering a positive w
As a Team Lead, I have faced difficulties in managing conflicts, balancing workload, and ensuring effective communication.
Managing conflicts among team members
Balancing workload and prioritizing tasks
Ensuring effective communication within the team
My salary expectation is negotiable based on the responsibilities and scope of the Team Lead role.
I believe my salary should reflect the level of responsibility and leadership required for the Team Lead position.
I am open to discussing salary based on the company's compensation structure and market standards.
I value fair compensation for my skills, experience, and the value I can bring to the team.
I am confident that w...
I applied via Company Website and was interviewed in May 2024. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed before Jan 2021. There were 6 interview rounds.
A bell crank is a mechanical device used to change the direction of motion.
It consists of an arm that is pivoted at one end and connected to a rod or link at the other end.
When the arm is rotated, it transfers the motion from one direction to another.
Bell cranks are commonly used in various applications such as automotive steering systems, aircraft control systems, and machinery.
For example, in a car's steering system,...
Dual mismatch refers to a situation where two parties have conflicting expectations or requirements.
Dual mismatch occurs when there is a misalignment between two parties' expectations or requirements.
It can happen in various contexts such as business negotiations, project management, or interpersonal relationships.
For example, if a client expects a project to be completed within a week, but the team estimates it will t...
I was interviewed before Feb 2024.
Reasoning question like coding
posted on 22 Feb 2021
I applied via Campus Placement and was interviewed in Aug 2020. There were 7 interview rounds.
I applied via Company Website and was interviewed in May 2019. There were 4 interview rounds.
There are several types of valves in instrumentation.
Gate valve
Ball valve
Butterfly valve
Globe valve
Check valve
Diaphragm valve
Needle valve
Plug valve
Pressure relief valve
Safety valve
PT, LT and LVDT are types of sensors used in engineering for measuring pressure, temperature and displacement respectively.
PT stands for Pressure Transducer and is used to measure pressure in various applications such as hydraulic systems, engines, and pipelines.
LT stands for Linear Transducer and is used to measure temperature in various applications such as engines, HVAC systems, and industrial processes.
LVDT stands ...
Calibration of I/P converter involves adjusting the output pressure to match the input signal.
Connect the I/P converter to a pressure source and a signal generator
Adjust the input signal to the desired value
Measure the output pressure and adjust it to match the input signal
Repeat the process at different input signal levels to ensure accuracy
Document the calibration results for future reference
A load cell is a transducer that converts force into an electrical signal. Calibration involves applying known loads and adjusting the output signal.
Load cell measures force or weight
It converts the force into an electrical signal
Calibration involves applying known loads and adjusting the output signal
Calibration can be done using a calibration machine or weights
Calibration should be done regularly to ensure accurate r
posted on 13 Oct 2022
I applied via Campus Placement and was interviewed before Oct 2021. There were 2 interview rounds.
Production Supervisor
536
salaries
| ₹0 L/yr - ₹0 L/yr |
Territory Sales Supervisor
463
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Officer
378
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Officer
240
salaries
| ₹0 L/yr - ₹0 L/yr |
Operation Assistant
236
salaries
| ₹0 L/yr - ₹0 L/yr |
Apollo Tyres
Ceat Tyres
Balkrishna Industries
JK Tyres