i
Montecarlo Construction
Filter interviews by
I applied via Recruitment Consulltant and was interviewed in Dec 2022. There were 2 interview rounds.
Top trending discussions
posted on 11 Apr 2021
I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.
Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.
Identifying the required personnel for a project
Recruiting and hiring personnel
Training and orienting personnel to the project
Assigning roles and responsibilities to personnel
Managing personnel performance and productivity
Ensuring compliance with labor laws and regulations
Examples include mobilizing a construc...
Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.
Create a detailed project budget and stick to it
Track expenses regularly and adjust budget as needed
Identify and eliminate unnecessary expenses
Negotiate with vendors for better pricing
Implement cost-saving measures without compromising quality
Use project management tools to monitor expenses and progress
Reg...
Handling clients requires effective communication, understanding their needs, and providing timely solutions.
Listen actively to their concerns and requirements
Communicate clearly and professionally
Provide timely updates and solutions
Build a strong relationship based on trust and respect
Be proactive in identifying and addressing potential issues
Ensure customer satisfaction by going above and beyond expectations
Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.
Identify the need for manpower
Plan the recruitment process
Source and screen candidates
Conduct interviews and assessments
Select and hire candidates
Provide training and orientation
Deploy manpower to required locations
I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.
The question is unclear and lacks context.
Please provide more information about the 'update shuttering system'.
Specify the time frame for the updates.
Clarify the purpose or objective of the updates.
Provide any relevant examples or scenarios.
I want to work as an execution engineer because I enjoy the challenge of overseeing and coordinating all aspects of a project.
As an execution engineer, I would have the opportunity to work on a variety of projects and oversee all aspects of their execution.
I enjoy the challenge of coordinating different teams and ensuring that everything runs smoothly.
While working on a formwork or quality team would be valuable experi...
Concrete is the most important as it provides the strength and durability to the structure.
Concrete is the backbone of any RCC structure.
It provides the strength and durability to the structure.
Reinforcements and formwork are important too, but without concrete, they are useless.
Proper mix design and curing of concrete are crucial for the longevity of the structure.
I applied via Company Website and was interviewed before Apr 2020. There were 4 interview rounds.
Mix design of concrete and BTech project
Mix design involves determining the proportions of cement, water, aggregates, and admixtures to achieve desired properties of concrete
Factors like strength, workability, durability, and cost are considered while designing the mix
BTech project can involve studying the effect of different mix designs on properties of concrete or developing a new mix design
Examples of BTech projects...
I applied via Company Website and was interviewed in Mar 2021. There was 1 interview round.
posted on 14 Oct 2023
I applied via Approached by Company and was interviewed before Oct 2022. There were 2 interview rounds.
Density of bentonite and prestressing formula are two separate topics in civil engineering.
Density of bentonite is typically around 2.0-2.5 g/cm^3.
Prestressing formula involves calculating the stress in a structure due to applied loads and prestressing forces.
Example of prestressing formula: Stress = Load / Area + Prestressing Force / Area
posted on 26 Jan 2025
CoS billing procedure involves categorizing and prioritizing traffic for billing purposes.
CoS (Class of Service) is a method used in networking to prioritize different types of traffic.
Billing procedures based on CoS involve assigning costs or charges to different classes of service.
Examples include charging more for high-priority traffic like VoIP calls compared to lower-priority data traffic.
based on 1 interview
Interview experience
based on 7 reviews
Rating in categories
Assistant Manager
70
salaries
| ₹6.4 L/yr - ₹10.8 L/yr |
Assistant Engineer
47
salaries
| ₹2.1 L/yr - ₹4.2 L/yr |
Senior Engineer
41
salaries
| ₹4.8 L/yr - ₹8 L/yr |
Deputy Manager
37
salaries
| ₹8.5 L/yr - ₹12 L/yr |
Engineer
18
salaries
| ₹3.1 L/yr - ₹5.1 L/yr |
L&T Construction
Simplex Infrastructures
AECOM
L&T Energy Hydrocarbon