Filter interviews by
I applied via Referral and was interviewed in Mar 2023. There were 6 interview rounds.
Line balancing points refer to the number of workstations in a production line where work is evenly distributed to optimize efficiency.
Line balancing points depend on the production process and the desired level of efficiency.
The goal is to evenly distribute work among workstations to prevent bottlenecks and optimize productivity.
For example, a production line with 10 workstations may have 5 line balancing points where...
Planning for a plant involves creating a detailed schedule of activities and resources needed for construction and operation.
Develop a project schedule outlining key milestones and activities
Identify resources required for each activity
Allocate resources efficiently to ensure timely completion
Monitor progress regularly and adjust the plan as needed
Collaborate with various stakeholders to ensure smooth execution
When introducing new machines and moulds, it is important to consider factors such as cost, efficiency, compatibility, and training requirements.
Evaluate the cost of purchasing and installing new machines and moulds.
Assess the efficiency and productivity improvements that the new equipment can bring.
Ensure compatibility of the new machines and moulds with existing systems and processes.
Consider the training requirement...
Rejection % is the percentage of rejected items out of the total items inspected or processed.
Rejection % is calculated by dividing the number of rejected items by the total number of items inspected, then multiplying by 100.
It is commonly used in quality control to measure the effectiveness of a process or product.
For example, if 10 out of 100 items inspected are rejected, the rejection % would be 10%.
OEE is a measure of how well a manufacturing process is utilized, calculated by multiplying availability, performance, and quality.
Calculate Availability: (Operating Time / Planned Production Time) * 100%
Calculate Performance: (Ideal Cycle Time * Total Count) / Operating Time
Calculate Quality: Good Count / Total Count
Multiply Availability, Performance, and Quality to get OEE: OEE = Availability * Performance * Quality
Manpower calculation involves estimating the number of workers needed for a project based on various factors.
Determine the total work hours required for the project
Calculate the total work hours available per worker per day
Divide total work hours required by work hours available per worker to get the number of workers needed
Consider factors like skill level, efficiency, and overtime requirements
Create a contingency plan to address the breakdown and minimize impact on project schedule.
Identify critical path activities and assess impact of breakdown on project timeline
Develop alternative solutions or workarounds to mitigate delays
Communicate with stakeholders and update project schedule accordingly
Allocate resources effectively to address the breakdown
Monitor progress closely to ensure timely resolution
The amount of manpower required per kg varies depending on the project scope and complexity.
Manpower requirements can range from 0.1 to 1.0 kg per person depending on the task.
Factors such as project timeline, skill level of workers, and efficiency of equipment can impact manpower requirements.
For example, a simple construction project may require 0.5 kg of manpower per person, while a complex engineering project may r
The assembly location in SAP refers to the physical location where components are put together to create a finished product.
Assembly location is a key field in SAP used for tracking the production process.
It helps in identifying where the final product was assembled.
Examples of assembly locations in SAP include production lines, warehouses, or specific workstations.
The marketing plan was approved based on the code received.
The code received may have met certain criteria outlined in the marketing plan.
The code could have been reviewed and deemed suitable for marketing purposes.
The code may have been aligned with the company's branding and messaging.
The marketing team may have found the code to be innovative or appealing to the target audience.
FG Book is located in the main library on the second floor.
FG Book can be found in the main library
It is located on the second floor
Ask the library staff for directions if needed
Breakdown % can be calculated by dividing the total downtime by the total available time and multiplying by 100.
Calculate total downtime for a specific period.
Calculate total available time for the same period.
Divide total downtime by total available time and multiply by 100 to get breakdown %.
Example: Total downtime = 10 hours, Total available time = 100 hours, Breakdown % = (10/100) * 100 = 10%.
Salary breakage refers to the detailed breakdown of an employee's salary into different components.
Salary breakage includes basic salary, allowances, bonuses, deductions, etc.
It helps employees understand how their total salary is calculated.
Employers use salary breakage to ensure transparency and accuracy in payroll.
For example, a salary breakage may show that an employee's total salary is made up of a basic salary, h...
I applied via Campus Placement and was interviewed before Jul 2021. There were 4 interview rounds.
Aptitude test on CS subjects like C programming, DBMS, CN, and OS.
There were 2 input-output based questions of easy to moderate level
Every candidate was given an individual topic and was asked to speak on it
I applied via Company Website and was interviewed before Dec 2020. There were 4 interview rounds.
I applied via Referral and was interviewed before Jan 2021. There was 1 interview round.
I applied via Campus Placement and was interviewed before Feb 2021. There were 3 interview rounds.
Aptitude round consists Logical reasoning, General Aptitude, Grammar related questions etc. All are moderate level questions.
OOPs is a programming paradigm that uses objects to represent real-world entities. Java is an OOPs language.
OOPs stands for Object-Oriented Programming System
Java is a class-based OOPs language
Encapsulation, Inheritance, Polymorphism, and Abstraction are the four pillars of OOPs
Objects have state and behavior
Java supports interfaces, which allow for multiple inheritance
Example: A car can be represented as an object wit...
Java solves machine dependency by using bytecode and virtual machine.
Java code is compiled into bytecode which is platform-independent
The bytecode is executed by the Java Virtual Machine (JVM) which is platform-specific
JVM translates bytecode into machine code for the specific platform
This allows Java code to run on any platform with a JVM installed
Example: A Java program compiled on Windows can run on Linux or Mac as
I applied via Company Website and was interviewed before Jul 2021. There were 3 interview rounds.
Aptitude, reasoning, English, cloud sections
2 questions in which , one has to complete within an 50 minutes
I applied via Campus Placement and was interviewed before May 2021. There were 2 interview rounds.
Numerical ability and logical reasoning followed by some coding mcqs
Printing 1 to 100 without for loop
Use recursion to print numbers from 1 to 99
Print 100 outside the recursion
Use a base case to stop recursion at 100
I applied via Campus Placement and was interviewed before Jun 2021. There were 2 interview rounds.
Simple aptitude test
I applied via Company Website and was interviewed before Jul 2021. There were 2 interview rounds.
Attended the codevita competition in final year of college.
I applied via Naukri.com and was interviewed before Nov 2020. There were 5 interview rounds.
based on 3 interviews
Interview experience
Service Engineer
6
salaries
| ₹0 L/yr - ₹0 L/yr |
Operations Executive
4
salaries
| ₹0 L/yr - ₹0 L/yr |
TCS
Accenture
Wipro
Cognizant