Filter interviews by
Maintaining client satisfaction involves proactive communication, understanding needs, and delivering consistent quality service.
Establish clear communication: Regular updates and check-ins help clients feel valued. For example, weekly progress reports can keep clients informed.
Set realistic expectations: Clearly outline project timelines and deliverables to avoid misunderstandings. For instance, if a project may ...
India has 39 accounting standards, known as Indian Accounting Standards (Ind AS), guiding financial reporting and disclosures.
Ind AS are converged with International Financial Reporting Standards (IFRS).
Examples include Ind AS 1: Presentation of Financial Statements.
Ind AS 16 deals with Property, Plant and Equipment.
Ind AS 109 covers Financial Instruments.
Working capital is the difference between a company's current assets and current liabilities, indicating its short-term financial health.
Current Assets include cash, inventory, and accounts receivable.
Current Liabilities include accounts payable and short-term debt.
Positive working capital indicates a company can cover its short-term obligations.
Example: If a company has $200,000 in current assets and $150,000 in ...
Basic requirements for design include understanding the problem, defining objectives, researching, brainstorming, prototyping, testing, and refining.
Understand the problem or need that the design is intended to address
Define clear objectives and constraints for the design
Conduct research to gather information and inspiration
Brainstorm ideas and concepts
Create prototypes to visualize and test the design
Test the pro...
I have worked on designing various plastic parts for consumer electronics, automotive, and household appliances.
Designed plastic enclosures for electronic devices such as smartphones and laptops
Developed plastic components for automotive interior and exterior parts
Created plastic housings for household appliances like vacuum cleaners and kitchen gadgets
Clamping force for a part can be calculated using the formula: Clamping Force = Friction Coefficient x Normal Force
Calculate the normal force acting on the part
Determine the friction coefficient between the part and the clamping surface
Multiply the friction coefficient by the normal force to get the clamping force
Example: Normal force = 1000 N, Friction coefficient = 0.5, Clamping force = 500 N
The process of opening a 3 plate mold involves separating the mold into three plates to release the molded part.
1. Release the locking mechanism holding the mold plates together.
2. Separate the mold into three plates: A, B, and C.
3. Remove the molded part from the cavity in plate B.
4. Open plates A and C to release the part.
5. Inspect the part for any defects or imperfections.
6. Close the mold plates back together...
Shut off angle is the angle at which a device stops conducting current in a circuit.
Shut off angle is a term commonly used in power electronics.
It refers to the angle at which a thyristor or other semiconductor device stops conducting current in a circuit.
It is important in controlling the flow of current in AC circuits.
For example, in a phase control circuit, the shut off angle determines when the device stops co...
System knowledge involves understanding software, hardware, and processes to optimize operations and troubleshoot issues effectively.
Familiarity with SAP modules like MM (Materials Management) and SD (Sales and Distribution) for efficient data handling.
Understanding system architecture to identify bottlenecks and improve performance, e.g., optimizing database queries.
Experience in user roles and authorizations to ...
The daily routine work involves a sequence of tasks that need to be completed in a specific order.
Start the day by checking emails and responding to urgent ones
Prioritize tasks based on deadlines and importance
Attend meetings and conference calls
Process and analyze data
Communicate with team members and clients
Complete paperwork and documentation
Review and update project plans
End the day by organizing tasks for the...
I applied via Recruitment Consulltant and was interviewed in Jun 2024. There were 3 interview rounds.
Managing customer defect or performance score card involves tracking and analyzing customer complaints or feedback to improve overall quality.
Establish clear metrics for measuring customer defects or performance
Regularly monitor and analyze customer feedback and complaints
Identify root causes of defects and implement corrective actions
Communicate findings and improvements to relevant stakeholders
Continuously strive to ...
General knowledge or activities
I appeared for an interview in Feb 2025, where I was asked the following questions.
My name is John Smith.
Full name is John Smith
Common first and last name
Easy to remember and pronounce
I am from a small town in the Midwest known for its friendly community and beautiful scenery.
Small town in the Midwest
Friendly community
Beautiful scenery
I appeared for an interview in Nov 2024, where I was asked the following questions.
I have over 10 years of experience in software engineering, focusing on system architecture and team leadership.
Led a team of 5 engineers in developing a scalable microservices architecture for a financial application, improving performance by 30%.
Implemented CI/CD pipelines using Jenkins and Docker, reducing deployment time from hours to minutes.
Worked on a cross-functional team to integrate machine learning algorithm...
Top trending discussions
The duration of Mindarika interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 39 interview experiences
Difficulty level
Duration
based on 586 reviews
Rating in categories
Senior Executive
130
salaries
| ₹3.4 L/yr - ₹7.5 L/yr |
Assistant Manager
129
salaries
| ₹5.1 L/yr - ₹10.7 L/yr |
Associate
64
salaries
| ₹1.7 L/yr - ₹4 L/yr |
Senior Engineer
55
salaries
| ₹4 L/yr - ₹8.3 L/yr |
Deputy Manager
50
salaries
| ₹10.1 L/yr - ₹18 L/yr |
JBM Group
Subros
Endurance Technologies
Delphi TVS