Filter interviews by
I applied via Referral and was interviewed before Dec 2022. There were 3 interview rounds.
Top trending discussions
I applied via Recruitment Consulltant and was interviewed before Jun 2021. There were 4 interview rounds.
posted on 9 Nov 2024
I applied via Approached by Company and was interviewed in Oct 2024. There was 1 interview round.
posted on 14 Nov 2024
Cycle time is the total time taken to complete a process or task from start to finish.
Cycle time is a key metric in process improvement and efficiency analysis.
It helps in identifying bottlenecks and areas for improvement in a process.
For example, in manufacturing, cycle time can refer to the time taken to produce one unit of a product.
Reducing cycle time can lead to increased productivity and cost savings.
Line balancing is the process of assigning tasks to workstations in a way that evens out the workload and maximizes efficiency.
Involves distributing work evenly among workstations
Helps in reducing idle time and bottlenecks
Improves productivity and efficiency
Example: In a manufacturing plant, line balancing ensures each workstation has a similar amount of work to do
I applied via Naukri.com and was interviewed in Jun 2023. There was 1 interview round.
Parameters of costing refer to the factors that influence the cost of a product or service.
Parameters can include materials, labor, overhead, and profit margin.
Other factors like transportation costs, taxes, and market demand can also impact costing.
Understanding and analyzing these parameters is crucial for accurate pricing and cost control.
For example, in manufacturing, the cost of raw materials and labor are key par
posted on 10 Aug 2022
I applied via Walk-in
posted on 23 Oct 2021
I applied via Recruitment Consultant and was interviewed before Oct 2020. There were 3 interview rounds.
I have a valid driver's license for both cars and motorcycles.
I have a Class C license for cars
I also have a Class M license for motorcycles
I have a clean driving record with no accidents or violations
I ride a road bike for commuting and a mountain bike for leisure.
I prefer road bikes for their speed and efficiency on paved roads.
I enjoy mountain biking for the challenge and adventure of off-road trails.
I also have experience with hybrid bikes for their versatility.
I prioritize safety and always wear a helmet and follow traffic laws.
I have participated in charity rides and group rides for fun and community.
Vehicle testing involves various methods to ensure safety, performance, and compliance with regulations.
Testing can include physical tests such as crash tests, durability tests, and performance tests.
Simulation and modeling can also be used to test vehicle components and systems.
Testing must comply with regulations set by organizations such as the National Highway Traffic Safety Administration (NHTSA) and the European
We conduct various types of homologation testing depending on the product and its intended market.
We conduct safety testing to ensure compliance with local regulations.
We perform emissions testing to ensure compliance with environmental regulations.
We conduct performance testing to ensure the product meets the required standards.
We also conduct durability testing to ensure the product can withstand the expected wear an...
posted on 20 Mar 2025
I appeared for an interview before Mar 2024, where I was asked the following questions.
A random cylinder is a geometric shape defined by a random height and radius, often used in probability and statistics.
A random cylinder can be defined by its height (h) and radius (r), which can vary randomly.
In probability, random cylinders can model real-world phenomena, like the distribution of particles in a volume.
Example: If the height of a cylinder is uniformly distributed between 1 and 10 units, and the radius...
OEE stands for Overall Equipment Effectiveness, a metric used to measure manufacturing productivity.
OEE is calculated using three components: Availability, Performance, and Quality.
Availability = (Operating Time / Planned Production Time) x 100%. Example: If a machine runs for 8 hours but is down for 1 hour, availability is 87.5%.
Performance = (Actual Output / Maximum Possible Output) x 100%. Example: If a machine prod...
based on 2 interviews
Interview experience
based on 17 reviews
Rating in categories
Senior Executive
120
salaries
| ₹2.7 L/yr - ₹7.5 L/yr |
Assistant Manager
112
salaries
| ₹4 L/yr - ₹10.5 L/yr |
Associate
66
salaries
| ₹1.5 L/yr - ₹4 L/yr |
Senior Engineer
54
salaries
| ₹3.8 L/yr - ₹8.3 L/yr |
Deputy Manager
51
salaries
| ₹5.4 L/yr - ₹16.6 L/yr |
JBM Group
Subros
Endurance Technologies
Delphi TVS