Mikuni
10+ Al Sawsan General Trading Interview Questions and Answers
Q1. Why 2 stroke engine is powerful than 4 stroke engine
2 stroke engines are more powerful than 4 stroke engines due to their higher power-to-weight ratio and faster combustion process.
2 stroke engines have a power stroke for every revolution of the crankshaft, while 4 stroke engines have a power stroke every other revolution.
2 stroke engines have a simpler design with fewer moving parts, leading to less friction and more efficient power output.
2 stroke engines have a faster combustion process as they intake, compress, power, and ...read more
Q2. What is 4M and what is retroactive & prospective
4M is a methodology used in production engineering. Retroactive refers to actions taken after an event, while prospective refers to actions taken before an event.
4M is a methodology used in production engineering that stands for Man, Machine, Material, and Method.
Man refers to the human resources involved in the production process.
Machine refers to the equipment and tools used in production.
Material refers to the raw materials and components used in production.
Method refers t...read more
Q3. What is base documents of control plan
The base documents of a control plan include process flow diagrams, work instructions, and quality standards.
Process flow diagrams outline the sequence of steps in the production process.
Work instructions provide detailed instructions on how to perform each step of the process.
Quality standards define the criteria for acceptable quality and specify the required inspections and tests.
Other base documents may include control charts, FMEA (Failure Mode and Effects Analysis), and...read more
Q4. Major defects in plastic parts and it's Countermeasure
Major defects in plastic parts and their countermeasures
Major defects in plastic parts include warping, sink marks, flash, and short shots
Countermeasures for warping include adjusting mold temperature and cooling time
Sink marks can be reduced by increasing injection pressure and temperature
Flash can be prevented by optimizing clamping force and using proper mold design
Short shots can be avoided by ensuring proper material flow and venting
Q5. Do you have documents & process knowledge
Yes, I have extensive knowledge of documents and processes.
I have experience in creating and maintaining process documentation.
I am familiar with various document management systems.
I have worked with cross-functional teams to streamline processes.
I have trained team members on process and document management.
I have experience in auditing processes and documents for compliance.
For example, in my previous role, I led a project to digitize and streamline the invoice approval pr...read more
Q6. MHR (Machine Hour Rate) & Costing norms in detail
MHR is the rate calculated by dividing the total overhead costs by the total machine hours. Costing norms refer to the standard costs set for different activities.
MHR is calculated as Total Overhead Costs / Total Machine Hours
Costing norms are predetermined standards for costs of different activities
MHR helps in determining the cost of using machines for production
Costing norms help in setting benchmarks for cost control and performance evaluation
Q7. How to manage quality
Quality can be managed by implementing a quality management system and continuously monitoring and improving processes.
Implement a quality management system (QMS)
Define quality standards and metrics
Train employees on quality standards and procedures
Monitor and measure quality performance
Identify and address quality issues
Continuously improve processes
Involve all stakeholders in quality management
Q8. How to manage difficult situation.
Managing difficult situations requires effective communication, problem-solving skills, and a calm demeanor.
Listen actively to understand the situation
Identify the root cause of the problem
Brainstorm possible solutions
Evaluate the pros and cons of each solution
Choose the best solution and implement it
Remain calm and professional throughout the process
Q9. How many types of brake
There are two main types of brakes: disc brakes and drum brakes.
Disc brakes use calipers to squeeze brake pads against a rotor to slow down the vehicle.
Drum brakes use brake shoes that press against the inside of a drum to slow down the vehicle.
Q10. How many types of Engine
There are two main types of engines: internal combustion engines and external combustion engines.
Internal combustion engines: gasoline engines, diesel engines
External combustion engines: steam engines
Other types include rotary engines, electric engines, etc.
Q11. What is your KPI
My KPI as a Production Engineer is to ensure efficient production processes, minimize downtime, and optimize product quality.
Monitoring and improving production efficiency
Reducing downtime through preventive maintenance
Implementing quality control measures
Optimizing production output
Analyzing and improving production costs
Q12. How to calculate OEE
OEE (Overall Equipment Efficiency) can be calculated by multiplying Availability, Performance, and Quality percentages.
Calculate Availability by dividing the total operating time by the planned production time.
Calculate Performance by dividing the actual production rate by the maximum production rate.
Calculate Quality by dividing the good units produced by the total units produced.
Multiply the Availability, Performance, and Quality percentages to get the OEE.
Q13. What is 5W 1H
5W 1H is a technique used to gather information by asking five 'W' questions and one 'H' question.
5W 1H stands for Who, What, When, Where, Why, and How.
It is commonly used in journalism, problem-solving, and project management.
By asking these questions, one can gather comprehensive information about a situation or problem.
For example, in a production engineering context, the 5W 1H questions could be: Who is responsible for the production process? What are the steps involved? ...read more
Q14. How to work Piston
To work a piston, it must be properly lubricated and connected to a crankshaft to convert linear motion into rotational motion.
Ensure the piston is properly lubricated to reduce friction and wear
Connect the piston to a crankshaft to convert linear motion into rotational motion
Monitor piston movement for any abnormalities or malfunctions
Q15. Explain star delta connection?
Star delta connection is a method used to connect motors in electrical systems to reduce starting current.
It is used for starting large motors.
In star connection, the motor windings are connected in a star configuration, reducing voltage across each winding.
In delta connection, the windings are connected in a delta configuration, allowing the motor to run at full speed.
The switch from star to delta configuration is typically done after the motor has reached a certain speed.
Th...read more
Q16. Exaplain diode working?
A diode is a semiconductor device that allows current to flow in one direction only.
Diodes are made of semiconductor materials such as silicon or germanium.
They have two terminals - an anode (positive) and a cathode (negative).
When a voltage is applied across the diode in the forward bias direction, it allows current to flow.
In the reverse bias direction, the diode blocks current flow.
Diodes are commonly used in rectifiers, voltage regulators, and signal demodulation.
Examples...read more
Q17. What is the 5 s
5S is a methodology for organizing a workplace, especially a shared workplace, to improve efficiency and effectiveness by eliminating waste.
Sort - separate needed tools, parts, and instructions from unneeded materials
Set in order - neatly arrange and identify parts and tools for ease of use
Shine - clean and inspect work area and equipment regularly
Standardize - establish schedules and methods for maintaining the workplace
Sustain - ensure the 5S system is maintained and improv...read more
Q18. What is the tpm
TPM stands for Total Productive Maintenance, a proactive approach to maintenance that aims to maximize equipment effectiveness.
TPM involves all employees in the maintenance process
Focuses on preventing breakdowns and improving overall equipment efficiency
Includes activities such as cleaning, inspection, lubrication, and training of operators
Example: Implementing TPM can lead to reduced downtime and increased productivity
Top HR Questions asked in Al Sawsan General Trading
Interview Process at Al Sawsan General Trading
Top Interview Questions from Similar Companies
Reviews
Interviews
Salaries
Users/Month