Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by MF BUMI GEOTECH Team. If you also belong to the team, you can get access from here

MF BUMI GEOTECH Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

MF BUMI GEOTECH Interview Questions and Answers

Updated 17 Jul 2023

MF BUMI GEOTECH Interview Experiences

Popular Designations

3 interviews found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via WhatsApp and was interviewed in Jan 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Assignment 

5 question (Problem solving Task)

Round 3 - Technical 

(2 Questions)

  • Q1. What is the is code for Concrete
  • Ans. 

    IS code for concrete is IS 456:2000, which specifies the general requirements for the design and construction of reinforced concrete structures.

    • IS 456:2000 is the Indian Standard code for the design and construction of reinforced concrete structures.

    • It covers the general requirements for materials, workmanship, inspection, testing, and overall quality control.

    • The code provides guidelines for the design of concrete mixe...

  • Answered by AI
  • Q2. What are the types of cement and how they differ
  • Ans. 

    Types of cement include Portland cement, white cement, rapid hardening cement, and low heat cement.

    • Portland cement is the most common type and is used in general construction.

    • White cement is used for architectural purposes and to create colored concrete.

    • Rapid hardening cement sets quickly and is used in projects with tight deadlines.

    • Low heat cement generates less heat during hydration and is used in large concrete stru

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - You must know your job for which you're applying

Condition Monitoring Engineer Interview Questions asked at other Companies

Q1. What is vibration? What is FFT? what is time waveform? What is cost down testing? What is resonance? What is natural frequency? How can eliminate resonance? What is soft foot? How can find out van pass frequency? What is flowing induced ?
View answer (2)

I applied via Walk-in and was interviewed in Mar 2022. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Tunnel any type questions
  • Ans. Some like tunnel supporting work and excavation rockbolt grouting drilling loading blasting
  • Answered Anonymously

Interview Preparation Tips

Topics to prepare for MF BUMI GEOTECH Deputy Manager Civil interview:
  • Civil Construction
Interview preparation tips for other job seekers - No any advice for advice for company after me advice

Deputy Manager Civil Interview Questions asked at other Companies

Q1. How to create documentation like JMR, BBS, Extra work measurements.
View answer (3)

Surveyor Interview Questions & Answers

user image Anonymous

posted on 3 Nov 2020

I applied via Naukri.com and was interviewed in Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Prepare for Close Traversing & open traversing. BASIC KNOWLEDGE OF Survey, Knowledge Of Civil 3d and AutoCAD with making contour. BASIC KNOWLEDGE OF Quantity Survey.

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview have 4 Round, here are 2 Hr round and 2 Technical round. Every Technical round is 20 - 25 minutes approx. The Employee wanted to test both my knowledge and communication skills.

Surveyor Interview Questions asked at other Companies

Q1. How much bench marks important your total station for centre line marking.
View answer (4)

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Feb 2024.

Round 1 - Technical 

(10 Questions)

  • Q1. What are the seven quality control tools, and can you provide explanations for each?
  • Q2. 5S and visual management
  • Q3. What are the seven steps of autonomous maintenance?
  • Q4. What are the calculations involved in Overall Equipment Effectiveness (OEE)?
  • Q5. Why is it mandatory for an organization to implement lean practices?
  • Q6. How can downstream team members be motivated?
  • Q7. What is Pareto analysis and how is it applied in decision-making processes?
  • Q8. What is a Gemba walk, and how is it performed?
  • Q9. What are the steps involved in performing safety risk assessments?
  • Q10. Explain about TPM
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. About my past job
  • Q2. About interlinking
  • Q3. Comand area related details
  • Q4. Domestik water related details
  • Q5. Drainage works related works details

Interview Preparation Tips

Interview preparation tips for other job seekers - I will sugest to first discuss time frame of job
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Group Discussion 

They are as a friendly asked questions what you did past service as before organization.

Round 2 - Technical 

(1 Question)

  • Q1. Asked simple technical questions, related to your experience s .

Interview Preparation Tips

Interview preparation tips for other job seekers - You are needed to prepare according to your role and while interview time ask comfortable salary Expectations keep it in your mind , from beginning you should keep high expectations of salary benefits
Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Naukri.com and was interviewed in Aug 2024. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Questioned about Salary expectations
  • Q2. Questioned abut work locations
Round 2 - Technical 

(2 Questions)

  • Q1. Questioned about nature of work in present company
  • Q2. Questioned about ability for role at the company

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview process is fast. Virtual interview option is available.
However the HR goes cold once you have been interviewed.
No proper feedback despite multiple attempts to reach. (especially in the case when they have decided not to go ahead with the candidate)
Tough salary negotiation. Bargaining will happen for even as low a difference as Rs. 5000/-
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Jul 2024. There were 3 interview rounds.

Round 1 - Assignment 

Purchase Assignment - Comparing PO's

Round 2 - One-on-one 

(2 Questions)

  • Q1. What is the Basic Rule of Purchase
  • Q2. How mant quotations will you take before evaluating
Round 3 - HR 

(2 Questions)

  • Q1. Expectations From the company?
  • Q2. Expected Compensiation?

Interview Preparation Tips

Interview preparation tips for other job seekers - Good Company, You will get experience Letter.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Why I m considered as CFO
  • Q2. Past experiences and values added in last companies
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in May 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is responsibility of privious company. How much Col. Erection in site Refinery Experienced
  • Q2. All the sup. Instructions how to work is complete by the my Sr. Manager. All the work are working asper given drawing & designs Weekly meeting for clients & daily Meeting contractor staff. I have release...

Interview Preparation Tips

Topics to prepare for Chatterjee Engineering Mechanical Lead interview:
  • Mechanical Engineering
Interview preparation tips for other job seekers - Company give you offer letter you doesn't join this company. Because doesn't provide tools & tackles. last off months company take bills

MF BUMI GEOTECH Interview FAQs

How many rounds are there in MF BUMI GEOTECH interview?
MF BUMI GEOTECH interview process usually has 2 rounds. The most common rounds in the MF BUMI GEOTECH interview process are Technical, Resume Shortlist and Assignment.
What are the top questions asked in MF BUMI GEOTECH interview?

Some of the top questions asked at the MF BUMI GEOTECH interview -

  1. What are the types of cement and how they dif...read more
  2. What is the is code for Concr...read more
  3. Prepare for Close Traversing & open traversing. BASIC KNOWLEDGE OF Survey, Know...read more

Tell us how to improve this page.

MF BUMI GEOTECH Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

MF BUMI GEOTECH Reviews and Ratings

based on 30 reviews

3.7/5

Rating in categories

3.6

Skill development

3.2

Work-life balance

3.2

Salary

3.4

Job security

3.2

Company culture

3.3

Promotions

3.6

Work satisfaction

Explore 30 Reviews and Ratings
Civil Site Engineer
6 salaries
unlock blur

₹1.7 L/yr - ₹4.2 L/yr

Assistant Manager
5 salaries
unlock blur

₹3.6 L/yr - ₹6.7 L/yr

HR Executive
5 salaries
unlock blur

₹2.2 L/yr - ₹3 L/yr

Civil Engineer
5 salaries
unlock blur

₹3 L/yr - ₹4.2 L/yr

HR Manager
4 salaries
unlock blur

₹5.4 L/yr - ₹6 L/yr

Explore more salaries
Compare MF BUMI GEOTECH with

Geovale Services

3.9
Compare

GAMMON INDIA

3.8
Compare

Patil Group

3.9
Compare

Millennium Engineers & Contractors

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview