Filter interviews by
I was interviewed in Jan 2025.
As a Senior Manager, I self-identify as a leader with strong communication skills and strategic vision.
Lead and manage a team to achieve organizational goals
Develop and implement strategic plans
Communicate effectively with stakeholders
Provide guidance and support to team members
Analyze data and make informed decisions
Ensure compliance with company policies and regulations
I applied via Naukri.com and was interviewed before Sep 2021. There were 2 interview rounds.
The covered area of the project is approximately 10,000 square feet.
The covered area includes the indoor space of the project.
It does not include any outdoor space or open areas.
The exact covered area may vary depending on the project.
In this particular project, the covered area is approximately 10,000 square feet.
I applied via Company Website and was interviewed in Feb 2020. There was 1 interview round.
I applied via Approached by Company and was interviewed before Sep 2021. There were 3 interview rounds.
I was interviewed before May 2020.
To fix the rate of 1 cum metre RCC for M10 and M20, factors like material cost, labor cost, equipment cost, and overheads need to be considered.
Determine the cost of materials required for 1 cum metre RCC for M10 and M20
Calculate the labor cost involved in the construction process
Consider the cost of equipment required for the construction process
Include overheads like transportation, insurance, and taxes
Compare the ra...
I applied via Naukri.com and was interviewed before Sep 2020. There were 4 interview rounds.
When faced with a shortage of material received, we take immediate action to address the issue and minimize any negative impact.
Contact the supplier to inform them about the shortage and request immediate resolution
Check inventory records and cross-verify with the supplier's delivery documentation
Investigate the cause of the shortage, such as shipping errors or miscommunication
Implement measures to prevent future short...
Yes, corrections can be made in an invoice by following certain steps.
The correction should be made as soon as possible to avoid any confusion.
The original invoice should not be destroyed, but rather marked as 'void' or 'cancelled'.
A new invoice should be created with the correct information and a reference to the original invoice.
The reason for the correction should be clearly stated on the new invoice.
Both the origin...
Various SAP T codes for Issues
MB21 - Create Reservation
MB1A - Goods Withdrawal
MB1B - Transfer Posting
MB1C - Other Goods Receipts
MB1E - Create Stock Transport Order
MB1F - Goods Issue
MB1H - Maintain Reservation
MB1T - Transfer Posting
MB1A - Goods Withdrawal
MB1B - Transfer Posting
MB1C - Other Goods Receipts
MB1E - Create Stock Transport Order
MB1F - Goods Issue
MB1H - Maintain Reservation
I applied via Referral and was interviewed before Feb 2023. There were 2 interview rounds.
I was interviewed before Jan 2024.
The weight of steel can be calculated using its density and volume.
Calculate the volume of the steel object in cubic meters
Determine the density of the specific type of steel being used
Multiply the volume by the density to get the weight in kilograms
For example, if the volume of steel is 0.5 cubic meters and the density is 7850 kg/m^3, the weight would be 3925 kg
The question is asking for the calculation of either the square of the diameter of a bar divided by 162 or the density of the steel multiplied by the area of the steel.
Calculate the square of the diameter of the bar and divide by 162
Calculate the density of the steel and multiply by the area of the steel
Compare the two results to determine the answer
On subject matter related to legal compliance.
based on 3 interviews
Interview experience
based on 16 reviews
Rating in categories
Engineer
895
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
878
salaries
| ₹0 L/yr - ₹0 L/yr |
Associate Manager
503
salaries
| ₹0 L/yr - ₹0 L/yr |
Mechanical Engineer
411
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Engineer
340
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Tata Projects
GMR Group
Hindustan Construction Company