Filter interviews by
I applied via Campus Placement
GD was complete English oriented, where you were given a topic and were supposed to discuss on it, topics were simple
It was easy, basic aptitude questions, not too tricky
Antonyms and synonyms of words
Antonyms of 'happy': sad, miserable, gloomy
Synonyms of 'big': large, huge, massive
Antonyms of 'fast': slow, sluggish, leisurely
I appeared for an interview before Feb 2024.
I applied via Walk-in and was interviewed in Mar 2022. There were 2 interview rounds.
I applied via Walk-in and was interviewed in Jul 2021. There were 3 interview rounds.
Maxop Engineering Co. interview questions for popular designations
Buildup time refers to the time required for a system to reach its steady-state performance.
Buildup time is important in production engineering as it helps determine the time required for a system to reach its optimal performance.
It can be affected by factors such as system complexity, component quality, and environmental conditions.
For example, in a manufacturing plant, buildup time may refer to the time required for ...
Top trending discussions
VA is value analysis, while VE is value engineering. Both are cost-saving techniques used in product development.
VA is a systematic review of a product's components and functions to identify areas where cost can be reduced without affecting performance.
VE is a more comprehensive approach that involves rethinking the entire product design to achieve cost savings while improving performance.
VA is typically used in the ea...
The cost of plastic molding components can be calculated by considering factors such as material cost, tooling cost, labor cost, and overhead cost.
Determine the material cost per unit of the component
Calculate the tooling cost, which includes the cost of the mold and any necessary equipment
Factor in the labor cost, which includes the cost of operating the molding machine and any necessary labor for finishing and assemb...
Polymers are large molecules made up of repeating units called monomers. They have a wide range of applications in various fields.
Polyethylene
Polypropylene
Polyvinyl chloride
Polystyrene
Polyester
Polyurethane
Nylon
Teflon
Silicone
Rubber
The first was a technical screening, where I was asked to solve coding problems on a shared platform. The questions tested my ability to think on my feet, focusing on optimizing solutions and writing clean, maintainable code.
This was more interactive, involving a whiteboard session where I had to design a system from scratch. The interviewer challenged my assumptions and pushed me to consider edge cases, scalability, and performance. It was intense, but it made me appreciate the importance of clear, structured thinking.
I applied via Walk-in and was interviewed in May 2022. There were 4 interview rounds.
I appeared for an interview in Aug 2021.
In maintenance, I am responsible for ensuring the proper functioning of equipment and machinery by performing regular inspections, repairs, and upgrades.
Performing routine inspections to identify any issues or potential problems
Repairing or replacing faulty parts to prevent breakdowns
Upgrading equipment to improve efficiency and performance
Creating maintenance schedules to ensure timely upkeep
Collaborating with other d
The duration of Maxop Engineering Co. interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 2 interviews
Interview experience
based on 419 reviews
Rating in categories
Engineer
200
salaries
| ₹2.5 L/yr - ₹6.5 L/yr |
Quality Engineer
141
salaries
| ₹2.2 L/yr - ₹6.2 L/yr |
Assistant Engineer
121
salaries
| ₹2 L/yr - ₹4.2 L/yr |
Senior Engineer
107
salaries
| ₹4.2 L/yr - ₹8.8 L/yr |
Assistant Manager
67
salaries
| ₹5 L/yr - ₹11.5 L/yr |
Knorr-Bremse
Greaves Cotton
Sanden Vikas
Victora Auto Private Limited