Filter interviews by
I applied via Campus Placement
GD was complete English oriented, where you were given a topic and were supposed to discuss on it, topics were simple
It was easy, basic aptitude questions, not too tricky
Antonyms and synonyms of words
Antonyms of 'happy': sad, miserable, gloomy
Synonyms of 'big': large, huge, massive
Antonyms of 'fast': slow, sluggish, leisurely
Top trending discussions
I applied via Recruitment Consultant and was interviewed in Feb 2021. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Jul 2019. There were 3 interview rounds.
Process engineering involves designing, optimizing, and managing industrial processes to improve efficiency and productivity.
Process engineering focuses on analyzing and improving processes in various industries such as manufacturing, chemical, and pharmaceutical.
It involves identifying bottlenecks, reducing waste, and implementing process improvements to enhance productivity.
Process engineers use tools like process fl...
cp and pp are both commands in Unix-like operating systems, but they have different functionalities.
cp stands for 'copy' and is used to copy files or directories from one location to another.
pp stands for 'print and pause' and is used to print files with pagination, pausing after each page.
cp can be used to create a duplicate of a file or directory, while pp is used for printing files in a controlled manner.
Example: cp...
A control plan is a documented procedure that outlines the steps and measures taken to ensure quality and consistency in a manufacturing process.
Control plans are commonly used in industries such as automotive, aerospace, and electronics.
They include details on the process steps, key characteristics, measurement methods, and acceptable tolerances.
Control plans help identify potential risks, prevent defects, and ensure ...
SMED stands for Single Minute Exchange of Die. It is a lean manufacturing technique used to reduce the time it takes to change over a production process.
SMED is used to minimize downtime during changeovers
It focuses on separating internal and external setup tasks
The goal is to convert as many internal setup tasks to external setup tasks
By reducing setup time, production flexibility and efficiency are improved
Capex stands for capital expenditure, which refers to the funds used by a company to acquire, upgrade, or maintain physical assets.
Capex is an investment made by a company to purchase or improve long-term assets such as buildings, equipment, or technology.
It is different from operational expenses (opex) which are ongoing costs to run the business.
Capex is typically planned and budgeted for in advance.
Examples of capex ...
I applied via Walk-in and was interviewed in May 2022. There were 4 interview rounds.
posted on 23 Mar 2022
I applied via Recruitment Consulltant and was interviewed in Jun 2021. There were 2 interview rounds.
Part programming for VMC and tool selection
posted on 8 May 2024
I applied via Walk-in and was interviewed in Nov 2023. There were 2 interview rounds.
I applied via Referral and was interviewed before Mar 2022. There were 2 interview rounds.
General aptitude test
based on 1 interview
Interview experience
Engineer
209
salaries
| ₹0 L/yr - ₹0 L/yr |
Quality Engineer
146
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineer
121
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
93
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
70
salaries
| ₹0 L/yr - ₹0 L/yr |
Knorr-Bremse
Greaves Cotton
Sanden Vikas
India Japan Lighting