Filter interviews by
Clear (1)
I applied via Recruitment Consulltant and was interviewed in Nov 2023. There were 2 interview rounds.
Production related and other
I applied via Recruitment Consultant and was interviewed in Nov 2021. There were 3 interview rounds.
PQ2 curve is a graph that shows the relationship between pressure and flow rate in a pumping system.
PQ2 curve is used to determine the efficiency of a pump.
It helps in selecting the right pump for a specific application.
The curve shows the point of maximum efficiency, which is where the pump should operate.
The curve also shows the shut-off head and the maximum flow rate of the pump.
The slope of the curve indicates the ...
Buildup time refers to the time required for a system to reach its steady-state performance.
Buildup time is important in production engineering as it helps determine the time required for a system to reach its optimal performance.
It can be affected by factors such as system complexity, component quality, and environmental conditions.
For example, in a manufacturing plant, buildup time may refer to the time required for ...
Top trending discussions
posted on 18 Dec 2022
I applied via Referral and was interviewed before Dec 2021. There was 1 interview round.
posted on 17 Aug 2023
posted on 1 Jul 2021
OEE stands for Overall Equipment Efficiency. It is a measure of how effectively a manufacturing operation is utilized.
OEE is calculated by multiplying Availability, Performance, and Quality.
Availability measures the percentage of time that equipment is available for production.
Performance measures the speed at which the equipment operates compared to its designed speed.
Quality measures the percentage of good-quality pr...
Production planning in shopfloor involves creating a detailed plan for manufacturing processes to ensure efficient and timely production.
Production planning involves determining the sequence of operations, resources required, and estimated time for each task.
It includes creating a production schedule, allocating resources, and coordinating with different departments.
The goal is to optimize production, minimize downtime...
Productivity is the measure of efficiency and output in relation to the resources used.
Productivity is a measure of how efficiently resources are used to produce goods or services.
It is the ratio of output to input, indicating how much is produced per unit of input.
Higher productivity means achieving more output with the same or fewer resources.
For example, in manufacturing, productivity can be measured by the number o...
5S is a methodology used to organize and maintain a clean, efficient, and safe work environment.
5S stands for Sort, Set in Order, Shine, Standardize, and Sustain.
Sort involves removing unnecessary items from the workplace.
Set in Order focuses on arranging necessary items in a logical and efficient manner.
Shine involves cleaning and maintaining the workplace.
Standardize establishes guidelines and procedures for maintain...
posted on 31 Aug 2022
I applied via Naukri.com and was interviewed in Jul 2022. There were 3 interview rounds.
I applied via Campus Placement and was interviewed before Mar 2023. There were 2 interview rounds.
Questions related to heat treatment
I applied via Naukri.com and was interviewed before May 2023. There were 2 interview rounds.
posted on 16 Jan 2025
I applied via LinkedIn and was interviewed in Dec 2024. There was 1 interview round.
based on 1 interview
Interview experience
based on 18 reviews
Rating in categories
Engineer
209
salaries
| ₹0 L/yr - ₹0 L/yr |
Quality Engineer
142
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineer
121
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
93
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
70
salaries
| ₹0 L/yr - ₹0 L/yr |
Knorr-Bremse
Greaves Cotton
Sanden Vikas
India Japan Lighting