I applied via Referral and was interviewed in Apr 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Cycle time of different rock classes in underground tunnels
  • Ans. 

    Cycle time of rock classes varies based on their hardness and strength.

    • Rock classes can be categorized based on their geological properties.

    • Harder and stronger rocks take longer to drill and excavate.

    • Examples of rock classes include granite, limestone, and sandstone.

    • Cycle time can also be affected by the type of equipment used and the skill level of workers.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - It lasted not more than 20minutes. The interviewer was interesting and asks related to general tasks performed in previous jobs.

Interview questions from similar companies

Interview Questionnaire 

2 Questions

  • Q1. About my past projects
  • Q2. About myself and family
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Mar 2024.

Interview Preparation Tips

Interview preparation tips for other job seekers - Having same job experience makes 70 percent yes, having little reference makes 100%

Interview Questionnaire 

4 Questions

  • Q1. What are your job responsibilities and day to day works ?
  • Q2. Why LNT and not any other company ?
  • Q3. When can you join ?
  • Q4. Are you ok working anywhere through out India ?

Interview Preparation Tips

Interview preparation tips for other job seekers - Be smart, responsive, avoid bluffs/lie, be prepared to answer questions like y do u want to join? , Whats wrong in your current company ?, Etc.

I applied via Naukri.com and was interviewed before Feb 2021. There were 2 interview rounds.

Interview Preparation Tips

Interview preparation tips for other job seekers - JUST BE CONFIDENT THEY ARE LOOKING FOR CANDIDATE WHO HAVE GOOD DECISION MAKING POWER.

I applied via Approached by Company and was interviewed before May 2021. There were 2 interview rounds.

Interview Preparation Tips

Interview preparation tips for other job seekers - They first look at English speaking ability.Speak confidently with out fear.

I applied via Campus Placement and was interviewed before Feb 2021. There were 3 interview rounds.

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep fundamental clear, all questions were mediam range include all subjects

I applied via Recruitment Consultant and was interviewed before Mar 2020. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. General project management questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Be honest

I applied via Company Website and was interviewed in Oct 2020. There were 4 interview rounds.

Interview Questionnaire 

13 Questions

  • Q1. What your experience
  • Q2. Crust thickness
  • Q3. How to cut 150 hill in 60 degree slope
  • Ans. 

    Cutting 150 hill in 60 degree slope requires careful planning and execution.

    • Conduct a thorough survey of the area to determine the best approach

    • Use heavy machinery such as excavators and bulldozers to remove the hill

    • Ensure safety measures are in place to prevent accidents

    • Consider environmental impact and take necessary precautions

    • Consult with experts in the field for advice and guidance

  • Answered by AI
  • Q4. How we do Protection in 150m height
  • Ans. 

    Protection in 150m height can be achieved through various means.

    • Use of safety harness and fall protection equipment

    • Installation of guardrails and safety nets

    • Implementation of a comprehensive safety plan

    • Regular inspection and maintenance of equipment

    • Training and education of workers on safety procedures

  • Answered by AI
  • Q5. Which grade of bitumin used in hill area
  • Ans. 

    The grade of bitumen used in hill areas depends on the temperature and altitude of the region.

    • The higher the altitude, the harder the bitumen used.

    • The temperature also plays a crucial role in determining the grade of bitumen.

    • For example, in colder regions, a harder grade of bitumen is used to prevent cracking and deformation.

    • In contrast, in warmer regions, a softer grade of bitumen is used to prevent rutting and deform

  • Answered by AI
  • Q6. How do we concrete in min temp
  • Ans. 

    Concrete in minimum temperature requires proper mix design, curing, and protection from freezing.

    • Use a mix design with low water-cement ratio and proper amount of cement and admixtures.

    • Ensure proper curing by covering the concrete with blankets or insulating materials.

    • Protect the concrete from freezing by using heaters or insulating blankets.

    • Monitor the temperature of the concrete and the environment during and after p...

  • Answered by AI
  • Q7. How do we protect cavity in tunnel
  • Ans. 

    Cavity in tunnels can be protected by using various methods.

    • Waterproofing the tunnel lining

    • Using grouting techniques to fill the cavity

    • Installing drainage systems to prevent water accumulation

    • Regular inspections and maintenance

    • Using shotcrete to reinforce the tunnel lining

    • Applying rock bolts to stabilize the surrounding rock

    • Using steel ribs to support the tunnel lining

  • Answered by AI
  • Q8. Cycle time in tunnel
  • Ans. 

    Cycle time in tunnel refers to the time taken to complete one cycle of a process or operation within the tunnel.

    • Cycle time can vary depending on the type of tunnel and the process being carried out.

    • For example, in a transportation tunnel, cycle time may refer to the time taken for a vehicle to enter and exit the tunnel.

    • In a manufacturing tunnel, cycle time may refer to the time taken to complete one production cycle.

    • Ef...

  • Answered by AI
  • Q9. NATM full form
  • Ans. 

    NATM stands for New Austrian Tunneling Method, a technique used in underground construction.

    • NATM is a tunneling method that involves excavating the tunnel while providing support to the surrounding rock mass.

    • It was developed in Austria in the 1950s and has since been used in various tunneling projects worldwide.

    • NATM involves the use of shotcrete, rock bolts, and steel ribs to support the tunnel walls and roof.

    • Examples ...

  • Answered by AI
  • Q10. How much we drill holes in face
  • Ans. 

    The frequency of drilling holes in the face depends on the specific project requirements and geological conditions.

    • The number of holes drilled in the face will vary depending on the project's needs and the geological conditions of the site.

    • Factors such as the type of rock, the size of the excavation, and the equipment being used will all influence the frequency of drilling.

    • It is important to carefully plan and execute ...

  • Answered by AI
  • Q11. What is proholes and what it's uses
  • Ans. 

    Proholes is not a known term in engineering. No data available.

    • Answered by AI
    • Q12. Why is drain holes we do
    • Ans. 

      Drain holes are necessary to prevent water accumulation and damage to structures or equipment.

      • Drain holes allow water to escape from areas where it can cause damage or corrosion.

      • They are commonly used in outdoor furniture, boats, and buildings to prevent water accumulation.

      • Drain holes can also be used in machinery to prevent damage from water or other liquids.

      • Proper placement and size of drain holes is important to ens

    • Answered by AI
    • Q13. How much asscelerate we used in shotcrete
    • Ans. 

      The amount of accelerator used in shotcrete depends on various factors.

      • The type of accelerator used affects the amount required.

      • The desired strength and setting time also play a role.

      • The ambient temperature and humidity can affect the amount needed.

      • Typically, 1-5% of the cement weight is used as accelerator.

      • The manufacturer's recommendations should be followed for best results.

    • Answered by AI

    Interview Preparation Tips

    Interview preparation tips for other job seekers - Be confident always think and speake
    Contribute & help others!
    anonymous
    You can choose to be anonymous

    Recently Viewed

    INTERVIEWS

    Urbanrise

    No Interviews

    JOBS

    Supercfo Services

    No Jobs

    LIST OF COMPANIES

    Gera Developments

    Locations

    LIST OF COMPANIES

    Urbanrise

    Locations

    INTERVIEWS

    IREO

    No Interviews

    INTERVIEWS

    IREO

    No Interviews

    INTERVIEWS

    Maxinfra

    No Interviews

    INTERVIEWS

    Maxinfra

    No Interviews

    INTERVIEWS

    Urbanrise

    No Interviews

    INTERVIEWS

    Urbanrise

    No Interviews

    Tell us how to improve this page.

    Interview Questions from Similar Companies

    Tata Projects Interview Questions
    4.2
     • 424 Interviews
    Adani Group Interview Questions
    3.9
     • 187 Interviews
    GMR Group Interview Questions
    4.0
     • 80 Interviews
    GAMMON INDIA Interview Questions
    3.8
     • 29 Interviews
    Essar Group Interview Questions
    3.7
     • 28 Interviews
    View all
    Assistant Manager
    25 salaries
    unlock blur

    ₹0 L/yr - ₹0 L/yr

    Mechanical Engineer
    16 salaries
    unlock blur

    ₹0 L/yr - ₹0 L/yr

    Senior Engineer
    15 salaries
    unlock blur

    ₹0 L/yr - ₹0 L/yr

    Engineer
    12 salaries
    unlock blur

    ₹0 L/yr - ₹0 L/yr

    Surveyor
    12 salaries
    unlock blur

    ₹0 L/yr - ₹0 L/yr

    Explore more salaries
    Compare Maxinfra with

    Larsen & Toubro Limited

    4.0
    Compare

    Tata Projects

    4.2
    Compare

    GMR Group

    4.0
    Compare

    Reliance Infrastructure

    4.1
    Compare
    Did you find this page helpful?
    Yes No
    write
    Share an Interview