Filter interviews by
I applied via Approached by Company and was interviewed before Dec 2022. There were 2 interview rounds.
I applied via Referral and was interviewed before Oct 2020. There were 3 interview rounds.
RMR and Q system are rock mass classification systems used in geology to evaluate the stability of rock slopes and tunnels.
RMR stands for Rock Mass Rating and Q system stands for Quartzite Rating System.
RMR uses six parameters including uniaxial compressive strength, rock quality designation, joint spacing, joint condition, groundwater conditions, and orientation of discontinuities.
Q system uses three parameters includ...
Various methods can be used to draw 3D mapping, including photogrammetry, LiDAR, and ground-penetrating radar.
Photogrammetry involves taking overlapping photographs from different angles and using software to create a 3D model.
LiDAR uses lasers to measure distances and create a 3D point cloud of the area.
Ground-penetrating radar uses electromagnetic waves to detect changes in soil or rock layers and create a 3D image o...
Top trending discussions
based on 1 interview
Interview experience
based on 3 reviews
Rating in categories
Assistant Manager
24
salaries
| ₹3.6 L/yr - ₹10.5 L/yr |
Senior Engineer
16
salaries
| ₹4.6 L/yr - ₹9.6 L/yr |
Mechanical Engineer
16
salaries
| ₹2.2 L/yr - ₹6 L/yr |
Surveyor
14
salaries
| ₹4.1 L/yr - ₹6 L/yr |
Engineer
12
salaries
| ₹3.4 L/yr - ₹6.5 L/yr |
Larsen & Toubro Limited
Tata Projects
GMR Group
Reliance Infrastructure