I applied via Naukri.com and was interviewed in Jan 2022. There were 2 interview rounds.
Top trending discussions
I applied via Approached by Company and was interviewed before Sep 2021. There were 3 interview rounds.
I have worked on various DCS architectures in my career, including those for chemical plants and power plants.
Designed and implemented DCS architecture for a chemical plant project
Developed DCS architecture for a power plant project
Worked on DCS architecture for a water treatment plant project
Collaborated with team to create DCS architecture for a pharmaceutical plant project
I applied via Walk-in and was interviewed before Aug 2020. There was 1 interview round.
Power supply is an electronic device that provides electrical energy to an electrical load.
Power supply converts AC voltage to DC voltage.
It regulates voltage and current to protect the device from damage.
Types of power supply include linear, switching, and battery.
Examples of power supply include wall adapters, computer power supplies, and batteries.
posted on 23 Nov 2019
I applied via Walk-in and was interviewed in May 2019. There was 1 interview round.
posted on 6 May 2019
I was interviewed in May 2019.
There are several types of bricks used in construction, including clay bricks, concrete bricks, and fire bricks.
Clay bricks are the most common type of brick used in construction.
Concrete bricks are made from cement, sand, and water and are used for their strength and durability.
Fire bricks are designed to withstand high temperatures and are used in fireplaces, ovens, and kilns.
Other types of bricks include sand-lime b...
I applied via Referral and was interviewed before Feb 2021. There were 2 interview rounds.
Shortlist in interview round after that training for final shortlist
I applied via Company Website and was interviewed before Dec 2023. There were 2 interview rounds.
I applied via Referral and was interviewed in Jul 2023. There were 2 interview rounds.
Predictive Maintenance is a proactive approach that uses data analysis to predict equipment failures and schedule maintenance before they occur.
Predictive Maintenance uses data analysis techniques to identify patterns and trends that indicate potential equipment failures.
It involves monitoring equipment performance in real-time and collecting data on factors such as temperature, vibration, and energy consumption.
By ana...
Power factor is a measure of how effectively electrical power is being used in a circuit.
Power factor is the ratio of real power (measured in watts) to apparent power (measured in volt-amperes).
It indicates the efficiency of power usage in a circuit.
A power factor of 1 means all the power is being used effectively, while a power factor less than 1 indicates wastage of power.
Inductive loads like electric motors have a l...
An object drawing example in 2D
Start by identifying the object you want to draw
Determine the scale and dimensions of the drawing
Use appropriate tools like rulers, compass, and protractors
Sketch the basic outline of the object
Add details and shading to enhance the drawing
Label important features or measurements
Review and refine the drawing for accuracy
based on 1 review
Rating in categories
Design Engineer
45
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Engineer
42
salaries
| ₹0 L/yr - ₹0 L/yr |
Estimation Engineer
33
salaries
| ₹0 L/yr - ₹0 L/yr |
Service Engineer
32
salaries
| ₹0 L/yr - ₹0 L/yr |
Design & Development Engineer
28
salaries
| ₹0 L/yr - ₹0 L/yr |
Siemens
ABB
BHEL
Larsen & Toubro Limited