Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Manomav Engineers Team. If you also belong to the team, you can get access from here

Manomav Engineers Verified Tick

Compare button icon Compare button icon Compare
3.6

based on 76 Reviews

Filter interviews by

Manomav Engineers bbs engineer Interview Questions, Process, and Tips

Updated 2 Jul 2024

Top Manomav Engineers bbs engineer Interview Questions and Answers

Manomav Engineers bbs engineer Interview Experiences

2 interviews found

bbs engineer Interview Questions & Answers

user image Anonymous

posted on 23 Aug 2021

I applied via Company Website and was interviewed before Aug 2020. There were 4 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. What is role of BBS Engineer
  • Ans. 

    BBS Engineer is responsible for implementing and maintaining Behavior-Based Safety programs to ensure a safe work environment.

    • Develop and implement BBS programs

    • Conduct safety audits and inspections

    • Train employees on safety procedures

    • Analyze data to identify safety trends

    • Collaborate with management to improve safety culture

  • Answered by AI
  • Q2. How to control wastage of steel
  • Ans. 

    Wastage of steel can be controlled by proper planning, inventory management, and efficient usage.

    • Implementing a strict inventory management system to avoid overstocking and understocking of steel

    • Ensuring proper handling and storage of steel to prevent damage and corrosion

    • Using advanced cutting and welding techniques to minimize scrap and offcuts

    • Encouraging employees to adopt a culture of waste reduction and efficient u...

  • Answered by AI
  • Q3. Checklist of Bar Bending Schedule
  • Ans. 

    A checklist for Bar Bending Schedule includes various items to ensure accuracy and completeness.

    • Check the dimensions and reinforcement details of structural elements

    • Verify the bending shapes and angles of bars

    • Ensure proper spacing and lap lengths of bars

    • Check the quantity and size of bars required

    • Verify the location and orientation of bars

    • Ensure compliance with design and construction standards

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Research the industry and company. ...
Clarify your "selling points" and the reasons you want the job. ...
Anticipate the interviewer's concerns and reservations. ...
Prepare for common interview questions. ...
Line up your questions for the interviewer. ...
Practice, practice, practice.

bbs engineer Interview Questions & Answers

user image M Sanaullah

posted on 2 Jul 2024

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is the confinement and non-confinement zone in column?
  • Ans. 

    Confinement zone in a column refers to the region where the concrete is fully confined by the reinforcement, while non-confinement zone is where the concrete is not fully confined.

    • Confinement zone helps in enhancing the strength and ductility of the column.

    • Non-confinement zone is more susceptible to buckling and failure under lateral loads.

    • Examples of confinement elements include spiral reinforcement or ties in a colum...

  • Answered by AI
  • Q2. How to derive unit weight of square bar?
  • Ans. 

    Unit weight of square bar can be derived by multiplying the cross-sectional area of the bar by the density of the material.

    • Calculate the cross-sectional area of the square bar by squaring the side length of the bar.

    • Determine the density of the material the square bar is made of.

    • Multiply the cross-sectional area by the density to get the unit weight of the square bar.

    • Unit weight = Cross-sectional area x Density

  • Answered by AI

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
Not Selected
Round 1 - Technical 

(2 Questions)

  • Q1. What is the output voltage of an AAAC Rabbit conductor?
  • Ans. 

    The output voltage of an AAAC Rabbit conductor is typically around 600 volts.

    • The output voltage of an AAAC Rabbit conductor is usually around 600 volts.

    • The exact output voltage may vary depending on the specific application and conditions.

    • It is important to consult the manufacturer's specifications for accurate information.

  • Answered by AI
  • Q2. What is your execution work plan?
  • Ans. 

    My execution work plan involves setting clear goals, creating a timeline, assigning tasks, monitoring progress, and adjusting as needed.

    • Set clear goals and objectives for the project

    • Create a detailed timeline with milestones and deadlines

    • Assign tasks to team members based on their strengths and expertise

    • Regularly monitor progress and make adjustments as needed

    • Communicate effectively with team members and stakeholders

    • Ut...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Normal interview the materials and workmanship
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Hajajakakakk sjs skskse sksksjs dd r d r d. E
  • Q2. Bsn s s d d d d. S d d. nsnsjsjsjsj
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jan 2024. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. What is your current job in your present company?
Round 2 - Technical 

(2 Questions)

  • Q1. What is plaster measurement deduction criteria?
  • Ans. 

    Plaster measurement deduction criteria refers to the standard guidelines used to calculate the deduction for plastering work in construction projects.

    • Deductions are made for openings such as doors, windows, and ducts in the plastered area.

    • The deduction criteria may vary based on the type of plastering material used and the specifications of the project.

    • Common deduction percentages range from 5% to 10% for openings in p...

  • Answered by AI
  • Q2. What if the quantity executed excess the BOQ quantity?
  • Ans. 

    The excess quantity executed beyond the BOQ quantity needs to be documented and approved by the client before billing.

    • Document the excess quantity separately from the original BOQ quantity

    • Seek approval from the client for the excess quantity before including it in the billing

    • Adjust the billing amount accordingly based on the approved excess quantity

    • Maintain clear communication with the client regarding the excess quant

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical knowledge related to your job profile and english communication skill should be good.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(5 Questions)

  • Q1. Basics civil engineering
  • Q2. How is your last project does
  • Q3. What is your additional skills
  • Q4. What about your addition launguage
  • Q5. Where is your home town
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Apr 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. About salary and benefits
Round 3 - One-on-one 

(4 Questions)

  • Q1. About my key activity and responsibility
  • Q2. Process of variation
  • Ans. 

    Process of variation involves documenting and analyzing changes in project scope, cost, or schedule.

    • Variations are changes to the original scope, cost, or schedule of a project

    • Variations must be documented and approved by the relevant parties

    • The impact of variations on project budget and timeline must be analyzed

    • Examples of variations include design changes, unforeseen site conditions, and client requests

  • Answered by AI
  • Q3. Details about TDS
  • Q4. Details about NS items

Interview Preparation Tips

Topics to prepare for The Louis Berger Group Billing Engineer interview:
  • Contact
  • Running bill
  • Escalations
  • Variation
  • Ns items
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Feb 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. About Experience in my present work
  • Q2. About present company work profile

Interview Preparation Tips

Interview preparation tips for other job seekers - Very nice company , I'm enjoying my work , work freedom,
Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Dec 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. About work experience and salary
Round 3 - Technical 

(1 Question)

  • Q1. Deep knowledge about the work

Interview Preparation Tips

Topics to prepare for BuildAHome Site Engineer interview:
  • About residential projects
Interview preparation tips for other job seekers - Job Seeker can join the company without any confusion and you can learn many things over here.

I applied via Walk-in and was interviewed in Jun 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Total experience Previous company salary
Round 3 - Technical 

(1 Question)

  • Q1. General technical questions

Interview Preparation Tips

Topics to prepare for Dee Vee Projects Billing Engineer interview:
  • Steel Structures
  • Finishing
  • AutoCAD
  • Bbs
  • MS Office
  • Ms excel
Interview preparation tips for other job seekers - General questions Reddy to go the enterview

Manomav Engineers Interview FAQs

How many rounds are there in Manomav Engineers bbs engineer interview?
Manomav Engineers interview process usually has 1 rounds. The most common rounds in the Manomav Engineers interview process are Technical.
What are the top questions asked in Manomav Engineers bbs engineer interview?

Some of the top questions asked at the Manomav Engineers bbs engineer interview -

  1. How to control wastage of st...read more
  2. What is the confinement and non-confinement zone in colu...read more
  3. what is role of BBS Engin...read more

Tell us how to improve this page.

People are getting interviews through

based on 1 Manomav Engineers interview
Company Website
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.
Manomav Engineers bbs engineer Salary
based on 20 salaries
₹2 L/yr - ₹4.5 L/yr
58% less than the average bbs engineer Salary in India
View more details

Manomav Engineers bbs engineer Reviews and Ratings

based on 2 reviews

4.0/5

Rating in categories

5.0

Skill development

4.0

Work-Life balance

2.0

Salary & Benefits

3.5

Job Security

4.5

Company culture

3.5

Promotions/Appraisal

3.5

Work Satisfaction

Explore 2 Reviews and Ratings
Project Manager
28 salaries
unlock blur

₹5.8 L/yr - ₹13 L/yr

bbs engineer
20 salaries
unlock blur

₹2 L/yr - ₹4.5 L/yr

Manager Packaging
16 salaries
unlock blur

₹4.5 L/yr - ₹8.4 L/yr

Planning Engineer
12 salaries
unlock blur

₹2.4 L/yr - ₹6 L/yr

Senior Engineer
8 salaries
unlock blur

₹2.8 L/yr - ₹6.2 L/yr

Explore more salaries
Compare Manomav Engineers with

Ahluwalia Contracts India

4.1
Compare

Punj Lloyd

4.4
Compare

Nagarjuna Construction Company

4.1
Compare

Larsen & Toubro Limited

4.0
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview