i
Madhure Infra
Filter interviews by
I appeared for an interview before Jul 2022.
Laps in beams are provided at the ends to allow for the overlapping of reinforcement bars.
Laps in beams are typically provided at the supports to ensure proper load transfer.
The length of the lap is usually specified in the structural design drawings.
Laps help in maintaining the continuity of reinforcement along the length of the beam.
Proper lap splicing is essential for the structural integrity of the beam.
The dia of bar and slab thickness ratio is an important factor in structural design.
The ratio of dia of bar to slab thickness should be within a certain range for structural stability.
A common ratio for dia of bar to slab thickness is 1:3.
The ratio may vary depending on the specific design requirements and load conditions.
I applied via Indeed and was interviewed in Apr 2024. There were 2 interview rounds.
Safety legal legislation refers to laws and regulations that govern safety practices in various industries.
Safety legal legislation sets standards for workplace safety to protect employees from hazards.
Examples include OSHA regulations in the United States and Health and Safety at Work Act in the UK.
Compliance with safety legal legislation is crucial to prevent accidents and injuries in the workplace.
Study about scaffold test
I applied via Indeed and was interviewed before Aug 2022. There were 2 interview rounds.
I am a detail-oriented accountant with 5 years of experience in financial reporting and analysis.
I have a Bachelor's degree in Accounting from XYZ University
I am proficient in using accounting software such as QuickBooks and SAP
I have experience preparing monthly financial statements and budgets
I have strong analytical skills and attention to detail
I am a team player and can effectively communicate financial informatio
The basic modes of measurement are linear, area, volume, and count.
Linear measurement involves measuring the length of an object or distance between two points.
Area measurement involves measuring the surface area of an object or the space enclosed within a boundary.
Volume measurement involves measuring the amount of space occupied by an object or substance.
Count measurement involves quantifying the number of items or e
Rate analysis is the process of determining the rates of various items of work involved in a construction project.
It involves the calculation of the cost of materials, labor, and equipment required for a particular task.
It helps in estimating the total cost of the project and preparing a budget.
It is essential for preparing accurate bills of quantities and invoices.
Example: Rate analysis for the construction of a build...
IS codes and current market rates are used for estimation and billing in construction projects.
IS codes provide guidelines for construction materials and methods.
Current market rates are used to estimate the cost of materials and labor.
Estimation and billing engineers use these factors to create accurate project budgets.
For example, IS codes specify the strength of concrete required for a particular structure, while cu...
Madhure Infra interview questions for popular designations
I appeared for an interview before Mar 2024, where I was asked the following questions.
Top trending discussions
I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.
The neutral axis is the line where the stress is zero in a reinforced concrete structure.
The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.
The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.
The position of the neutral axis affects the amount of reinforcement required in the tension zone.
The n...
I appeared for an interview before Feb 2024.
The seven quality control tools are essential for process improvement and problem-solving in engineering.
Check sheet: Used to collect and analyze data in a systematic way, such as tracking defects in a manufacturing process.
Pareto chart: Helps identify the most significant factors contributing to a problem by displaying them in descending order of frequency or impact.
Cause-and-effect diagram (Fishbone diagram): Visuali...
Autonomous maintenance is a key pillar of Total Productive Maintenance (TPM) and involves seven steps to empower operators to take care of their equipment.
Step 1: Initial Cleaning - Operators clean the equipment and surrounding area to identify abnormalities.
Step 2: Eliminate Sources of Contamination - Remove dirt, dust, and debris that can lead to breakdowns.
Step 3: General Inspection - Operators visually inspect the ...
OEE calculations involve Availability, Performance, and Quality factors to measure equipment efficiency.
Calculate Availability by dividing Operating Time by Planned Production Time.
Calculate Performance by dividing Actual Production by Maximum Possible Production.
Calculate Quality by dividing Good Units Produced by Total Units Started.
Implementing lean practices is mandatory for organizations to improve efficiency, reduce waste, and increase productivity.
Lean practices help organizations identify and eliminate waste in processes, leading to cost savings and improved efficiency.
By implementing lean practices, organizations can improve quality control and reduce defects in products or services.
Lean practices promote continuous improvement and empower ...
Downstream team members can be motivated through recognition, clear communication, opportunities for growth, and fostering a positive work environment.
Provide recognition for their hard work and achievements
Communicate clearly about goals, expectations, and feedback
Offer opportunities for growth and development, such as training or mentorship programs
Create a positive work environment through team-building activities a
Pareto analysis is a technique used to identify the most important factors contributing to a problem or situation.
Pareto analysis is based on the Pareto Principle, also known as the 80/20 rule, which states that roughly 80% of effects come from 20% of causes.
It involves identifying and prioritizing the factors that have the most significant impact on a particular outcome.
By focusing on addressing the most critical fact...
A Gemba walk is a Lean management technique where managers go to the actual workplace to observe operations and engage with employees.
Gemba walks involve observing processes, asking questions, and identifying opportunities for improvement.
Managers should focus on understanding the work being done and the challenges faced by employees.
Gemba walks help in building relationships with employees and fostering a culture of c...
Steps involved in performing safety risk assessments
Identify hazards and potential risks
Assess the likelihood and severity of each risk
Implement control measures to mitigate risks
Monitor and review the effectiveness of control measures
Document findings and recommendations
Communicate risks to relevant stakeholders
TPM stands for Total Productive Maintenance, a proactive approach to maintenance that aims to maximize equipment effectiveness.
TPM focuses on preventing equipment breakdowns through regular maintenance and employee involvement.
It involves autonomous maintenance, planned maintenance, and focused improvement activities.
TPM aims to improve overall equipment effectiveness (OEE) by reducing downtime, improving quality, and ...
I applied via LinkedIn and was interviewed in May 2024. There was 1 interview round.
Experienced business analyst with a background in data analysis and process improvement.
Over 5 years of experience in analyzing business processes and identifying areas for improvement
Skilled in data analysis tools such as Excel, SQL, and Tableau
Strong communication and problem-solving skills
Led a project to streamline inventory management processes, resulting in a 20% reduction in costs
posted on 15 Jul 2024
Execution in structure refers to the ability to effectively implement plans and strategies within an organized framework.
Understanding the overall goals and objectives of the organization
Developing detailed action plans to achieve those goals
Assigning tasks and responsibilities to team members
Monitoring progress and making adjustments as needed
Ensuring that resources are allocated efficiently
Communicating effectively w...
I applied via Naukri.com and was interviewed in Oct 2023. There was 1 interview round.
Polymorphism in Java allows objects of different classes to be treated as objects of a common superclass.
Polymorphism is achieved through method overriding and method overloading.
Method overriding allows a subclass to provide a specific implementation of a method that is already provided by its superclass.
Method overloading allows multiple methods with the same name but different parameters in the same class.
Polymorphi...
based on 6 interviews
Interview experience
based on 35 reviews
Rating in categories
Senior Engineer
7
salaries
| ₹5.5 L/yr - ₹7 L/yr |
Safety Officer
6
salaries
| ₹2.4 L/yr - ₹4 L/yr |
Junior Engineer
6
salaries
| ₹2.4 L/yr - ₹3.4 L/yr |
Junior Engineer Civil
6
salaries
| ₹1.6 L/yr - ₹3.2 L/yr |
Project Manager
5
salaries
| ₹8 L/yr - ₹11.5 L/yr |
GAMMON INDIA
Patil Group
Millennium Engineers & Contractors
Karam Industries