i
Madhure Infra
Filter interviews by
The basic modes of measurement are linear, area, volume, and count.
Linear measurement involves measuring the length of an object or distance between two points.
Area measurement involves measuring the surface area of an object or the space enclosed within a boundary.
Volume measurement involves measuring the amount of space occupied by an object or substance.
Count measurement involves quantifying the number of items or e
Rate analysis is the process of determining the rates of various items of work involved in a construction project.
It involves the calculation of the cost of materials, labor, and equipment required for a particular task.
It helps in estimating the total cost of the project and preparing a budget.
It is essential for preparing accurate bills of quantities and invoices.
Example: Rate analysis for the construction of a build...
IS codes and current market rates are used for estimation and billing in construction projects.
IS codes provide guidelines for construction materials and methods.
Current market rates are used to estimate the cost of materials and labor.
Estimation and billing engineers use these factors to create accurate project budgets.
For example, IS codes specify the strength of concrete required for a particular structure, while cu...
Top trending discussions
based on 2 reviews
Rating in categories
Junior Engineer
7
salaries
| ₹2.2 L/yr - ₹3.4 L/yr |
Safety Officer
6
salaries
| ₹2.4 L/yr - ₹4 L/yr |
Junior Engineer Civil
6
salaries
| ₹1.6 L/yr - ₹3.2 L/yr |
Senior Engineer
5
salaries
| ₹6 L/yr - ₹7 L/yr |
Project Manager
5
salaries
| ₹8 L/yr - ₹11.5 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
GMR Group