Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Madhure Infra Team. If you also belong to the team, you can get access from here

Madhure Infra Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Madhure Infra Trainee Interview Questions and Answers

Updated 18 Jul 2023

Madhure Infra Trainee Interview Experiences

1 interview found

Trainee Interview Questions & Answers

user image Anonymous

posted on 18 Jul 2023

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Jul 2022.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Where we provide laps in beams
  • Ans. 

    Laps in beams are provided at the ends to allow for the overlapping of reinforcement bars.

    • Laps in beams are typically provided at the supports to ensure proper load transfer.

    • The length of the lap is usually specified in the structural design drawings.

    • Laps help in maintaining the continuity of reinforcement along the length of the beam.

    • Proper lap splicing is essential for the structural integrity of the beam.

  • Answered by AI
  • Q2. What is dia of bar and slab thickness ratio
  • Ans. 

    The dia of bar and slab thickness ratio is an important factor in structural design.

    • The ratio of dia of bar to slab thickness should be within a certain range for structural stability.

    • A common ratio for dia of bar to slab thickness is 1:3.

    • The ratio may vary depending on the specific design requirements and load conditions.

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. Where are currently located
  • Q2. What are you leaving previous job

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Feb 2024.

Round 1 - Technical 

(10 Questions)

  • Q1. What are the seven quality control tools, and can you provide explanations for each?
  • Ans. 

    The seven quality control tools are essential for process improvement and problem-solving in engineering.

    • Check sheet: Used to collect and analyze data in a systematic way, such as tracking defects in a manufacturing process.

    • Pareto chart: Helps identify the most significant factors contributing to a problem by displaying them in descending order of frequency or impact.

    • Cause-and-effect diagram (Fishbone diagram): Visuali...

  • Answered by AI
  • Q2. 5S and visual management
  • Q3. What are the seven steps of autonomous maintenance?
  • Ans. 

    Autonomous maintenance is a key pillar of Total Productive Maintenance (TPM) and involves seven steps to empower operators to take care of their equipment.

    • Step 1: Initial Cleaning - Operators clean the equipment and surrounding area to identify abnormalities.

    • Step 2: Eliminate Sources of Contamination - Remove dirt, dust, and debris that can lead to breakdowns.

    • Step 3: General Inspection - Operators visually inspect the ...

  • Answered by AI
  • Q4. What are the calculations involved in Overall Equipment Effectiveness (OEE)?
  • Ans. 

    OEE calculations involve Availability, Performance, and Quality factors to measure equipment efficiency.

    • Calculate Availability by dividing Operating Time by Planned Production Time.

    • Calculate Performance by dividing Actual Production by Maximum Possible Production.

    • Calculate Quality by dividing Good Units Produced by Total Units Started.

  • Answered by AI
  • Q5. Why is it mandatory for an organization to implement lean practices?
  • Ans. 

    Implementing lean practices is mandatory for organizations to improve efficiency, reduce waste, and increase productivity.

    • Lean practices help organizations identify and eliminate waste in processes, leading to cost savings and improved efficiency.

    • By implementing lean practices, organizations can improve quality control and reduce defects in products or services.

    • Lean practices promote continuous improvement and empower ...

  • Answered by AI
  • Q6. How can downstream team members be motivated?
  • Ans. 

    Downstream team members can be motivated through recognition, clear communication, opportunities for growth, and fostering a positive work environment.

    • Provide recognition for their hard work and achievements

    • Communicate clearly about goals, expectations, and feedback

    • Offer opportunities for growth and development, such as training or mentorship programs

    • Create a positive work environment through team-building activities a

  • Answered by AI
  • Q7. What is Pareto analysis and how is it applied in decision-making processes?
  • Ans. 

    Pareto analysis is a technique used to identify the most important factors contributing to a problem or situation.

    • Pareto analysis is based on the Pareto Principle, also known as the 80/20 rule, which states that roughly 80% of effects come from 20% of causes.

    • It involves identifying and prioritizing the factors that have the most significant impact on a particular outcome.

    • By focusing on addressing the most critical fact...

  • Answered by AI
  • Q8. What is a Gemba walk, and how is it performed?
  • Ans. 

    A Gemba walk is a Lean management technique where managers go to the actual workplace to observe operations and engage with employees.

    • Gemba walks involve observing processes, asking questions, and identifying opportunities for improvement.

    • Managers should focus on understanding the work being done and the challenges faced by employees.

    • Gemba walks help in building relationships with employees and fostering a culture of c...

  • Answered by AI
  • Q9. What are the steps involved in performing safety risk assessments?
  • Ans. 

    Steps involved in performing safety risk assessments

    • Identify hazards and potential risks

    • Assess the likelihood and severity of each risk

    • Implement control measures to mitigate risks

    • Monitor and review the effectiveness of control measures

    • Document findings and recommendations

    • Communicate risks to relevant stakeholders

  • Answered by AI
  • Q10. Explain about TPM
  • Ans. 

    TPM stands for Total Productive Maintenance, a proactive approach to maintenance that aims to maximize equipment effectiveness.

    • TPM focuses on preventing equipment breakdowns through regular maintenance and employee involvement.

    • It involves autonomous maintenance, planned maintenance, and focused improvement activities.

    • TPM aims to improve overall equipment effectiveness (OEE) by reducing downtime, improving quality, and ...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Tell me about Concrete
  • Ans. 

    Concrete is a strong and durable building material made from a mixture of cement, sand, gravel, and water.

    • Concrete is commonly used in construction for foundations, walls, floors, and sidewalks.

    • It can be reinforced with steel bars to increase its strength and flexibility.

    • Different types of concrete, such as ready-mix and precast, are used for various construction projects.

    • Concrete can be colored, stamped, or polished f...

  • Answered by AI
  • Q2. What is the IS code for RCC
  • Ans. 

    IS code for RCC is IS 456:2000

    • IS 456:2000 is the Indian Standard code for the design and construction of reinforced concrete structures

    • It covers the general requirements for the design and construction of RCC structures

    • The code provides guidelines for materials, design, construction, quality control, and maintenance of RCC structures

  • Answered by AI

I applied via Referral and was interviewed before Jun 2021. There were 2 interview rounds.

Round 1 - HR 

(3 Questions)

  • Q1. Give a brief introduction about yourself
  • Q2. Explain roles and responsibilities in detail
  • Q3. Explain about software skills.
  • Ans. 

    Software skills refer to the ability to use various software tools and applications effectively.

    • Proficiency in programming languages such as Java, Python, C++

    • Familiarity with software development methodologies such as Agile, Waterfall

    • Experience with software testing and debugging

    • Knowledge of database management systems like MySQL, Oracle

    • Ability to use software tools like Git, JIRA, Visual Studio

    • Understanding of web dev

  • Answered by AI
Round 2 - One-on-one 

(3 Questions)

  • Q1. Technical questions about inter fits outs
  • Q2. Type of projects handled. Explain about the challenges and how you overcame them
  • Q3. Strengths and weakness as project engineer

Interview Preparation Tips

Interview preparation tips for other job seekers - Good interview experience. All my doubts were clarified in professional manner.

I applied via Walk-in and was interviewed before Jun 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. What is data structure?
  • Ans. 

    Data structure is a way of organizing and storing data in a computer so that it can be accessed and used efficiently.

    • Data structures are used to manage large amounts of data efficiently.

    • They provide a way to organize data in a way that makes it easy to access and manipulate.

    • Examples of data structures include arrays, linked lists, stacks, queues, trees, and graphs.

  • Answered by AI
Round 3 - Coding Test 

Explain logic of stack

Interview Preparation Tips

Interview preparation tips for other job seekers - Its good place to start your career

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. System implementation process
  • Ans. 

    System implementation process involves planning, designing, testing, and deploying new software or hardware systems.

    • Planning phase involves defining project scope, setting goals, and creating a timeline.

    • Design phase includes creating system architecture, database design, and user interface.

    • Testing phase involves conducting various tests to ensure system functionality and performance.

    • Deployment phase includes installing...

  • Answered by AI
  • Q2. Role and responsibilities to monitor performance.
  • Ans. 

    Monitoring performance involves setting clear expectations, providing feedback, tracking progress, and addressing any issues that arise.

    • Set clear performance expectations for team members

    • Provide regular feedback on performance

    • Track progress towards goals and objectives

    • Address any performance issues promptly and constructively

  • Answered by AI

I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. NEUTRAL AXIS IN RCC STRUCTURE
  • Ans. 

    The neutral axis is the line where the stress is zero in a reinforced concrete structure.

    • The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.

    • The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.

    • The position of the neutral axis affects the amount of reinforcement required in the tension zone.

    • The n...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - GRT TO WORK WITH THIS COMPANY
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Monster and was interviewed before Apr 2023. There were 3 interview rounds.

Round 1 - Assignment 

Question are hard in panel

Round 2 - HR 

(3 Questions)

  • Q1. What is the current ctc
  • Ans. 

    I am currently earning a salary of $60,000 per year.

    • My current annual salary is $60,000

    • I am earning $5,000 per month

    • My total compensation package is $60,000

  • Answered by AI
  • Q2. What is the company name
  • Ans. 

    The company name is XYZ Corporation, a leading data analytics firm specializing in providing insights for businesses.

    • XYZ Corporation is a data analytics firm

    • Specializes in providing insights for businesses

  • Answered by AI
  • Q3. Gammon India Ltd
Round 3 - Case Study 

It is very good in study for
Further studies.

Interview Preparation Tips

Interview preparation tips for other job seekers - Good
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in May 2024. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Tell me about yourself
  • Ans. 

    Experienced business analyst with a background in data analysis and process improvement.

    • Over 5 years of experience in analyzing business processes and identifying areas for improvement

    • Skilled in data analysis tools such as Excel, SQL, and Tableau

    • Strong communication and problem-solving skills

    • Led a project to streamline inventory management processes, resulting in a 20% reduction in costs

  • Answered by AI
  • Q2. Tell me about your roles and responsibilities
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
-
Result
Not Selected
Round 1 - Technical 

(2 Questions)

  • Q1. Execution in Structure
  • Ans. 

    Execution in structure refers to the ability to effectively implement plans and strategies within an organized framework.

    • Understanding the overall goals and objectives of the organization

    • Developing detailed action plans to achieve those goals

    • Assigning tasks and responsibilities to team members

    • Monitoring progress and making adjustments as needed

    • Ensuring that resources are allocated efficiently

    • Communicating effectively w...

  • Answered by AI
  • Q2. High rise buildings

Skills evaluated in this interview

Madhure Infra Interview FAQs

How many rounds are there in Madhure Infra Trainee interview?
Madhure Infra interview process usually has 3 rounds. The most common rounds in the Madhure Infra interview process are Resume Shortlist, Technical and HR.
What are the top questions asked in Madhure Infra Trainee interview?

Some of the top questions asked at the Madhure Infra Trainee interview -

  1. What is dia of bar and slab thickness ra...read more
  2. Where we provide laps in be...read more
  3. Where are currently loca...read more

Tell us how to improve this page.

Madhure Infra Trainee Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more
Senior Engineer
7 salaries
unlock blur

₹5.5 L/yr - ₹7 L/yr

Junior Engineer
7 salaries
unlock blur

₹2.2 L/yr - ₹3.4 L/yr

Safety Officer
6 salaries
unlock blur

₹2.4 L/yr - ₹4 L/yr

Junior Engineer Civil
6 salaries
unlock blur

₹1.6 L/yr - ₹3.2 L/yr

Project Manager
5 salaries
unlock blur

₹8 L/yr - ₹11.5 L/yr

Explore more salaries
Compare Madhure Infra with

GAMMON INDIA

3.9
Compare

Patil Group

3.8
Compare

Millennium Engineers & Contractors

4.1
Compare

Karam Industries

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview