FAR & FSI are calculated by dividing the total floor area by the area of the plot.
FAR (Floor Area Ratio) is calculated by dividing the total floor area of a building by the area of the plot.
FSI (Floor Space Index) is calculated by dividing the total floor area of all floors of a building by the area of the plot.
FAR and FSI are used to determine the maximum allowable floor area of a building on a given plot of land.
For ...
Top trending discussions
I applied via Approached by Company and was interviewed in Mar 2023. There were 2 interview rounds.
posted on 28 Dec 2022
I applied via Approached by Company and was interviewed in Jun 2022. There were 2 interview rounds.
Rate analysis is the process of determining the rates of various items of work involved in a construction project.
It involves breaking down the cost of a project into individual components
It helps in estimating the total cost of a project
It helps in comparing the cost of different projects
Yes, I have done rate analysis for various construction projects
Steel reinforcement of piles is calculated based on the load capacity and design of the pile.
Determine the load capacity and design of the pile
Calculate the required cross-sectional area of steel reinforcement
Determine the spacing and diameter of the reinforcement bars
Calculate the total length of steel reinforcement required
Consider any additional factors such as corrosion protection
Ensure compliance with relevant cod
I was interviewed in Dec 2024.
Calculator for material quantity on site material
I applied via Walk-in and was interviewed in Jun 2024. There was 1 interview round.
posted on 21 Aug 2024
I applied via Approached by Company and was interviewed in Jul 2024. There was 1 interview round.
posted on 19 Aug 2024
I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.
posted on 15 Oct 2024
I applied via LinkedIn and was interviewed in Apr 2024. There was 1 interview round.
The size of a concrete cube is typically 150mm x 150mm x 150mm for standard testing purposes.
Standard size for concrete cube is 150mm x 150mm x 150mm
Used for testing the compressive strength of concrete
Other sizes may be used for specific projects or requirements
posted on 1 Jul 2024
I applied via Naukri.com and was interviewed in Jan 2024. There was 1 interview round.
based on 2 reviews
Rating in categories
Senior Accountant
14
salaries
| ₹1.1 L/yr - ₹6.3 L/yr |
Legal Manager
13
salaries
| ₹6.5 L/yr - ₹15 L/yr |
Assistant Manager
12
salaries
| ₹3 L/yr - ₹6.6 L/yr |
Junior Engineer
12
salaries
| ₹1.8 L/yr - ₹4 L/yr |
Civil Site Engineer
11
salaries
| ₹2.2 L/yr - ₹4.8 L/yr |
GMR Group
Larsen & Toubro Limited
Hindustan Construction Company
Nagarjuna Construction Company