Filter interviews by
posted on 11 Jul 2022
I applied via Walk-in and was interviewed in Jan 2022. There were 3 interview rounds.
The percentage of coupler and rebar lapping varies depending on the project specifications and design requirements.
The percentage of coupler and rebar lapping is determined by the engineer or designer based on the project specifications.
The percentage can range from 25% to 100% depending on the design requirements.
Coupler lapping is typically used in situations where the rebar cannot be overlapped due to space constrai...
posted on 31 Dec 2022
I applied via Approached by Company and was interviewed in Dec 2022. There were 3 interview rounds.
I applied via Referral and was interviewed before Aug 2023. There was 1 interview round.
posted on 5 Jan 2023
posted on 22 Apr 2022
I applied via Recruitment Consulltant and was interviewed in Mar 2022. There was 1 interview round.
posted on 16 Feb 2024
I applied via Walk-in and was interviewed in Aug 2023. There were 2 interview rounds.
I am currently working at XYZ Company as an Assistant Manager.
Currently working at XYZ Company
Position: Assistant Manager
The quantity of binding wire required for 1 ton of steel work depends on various factors such as the type of binding wire used, the thickness of the steel bars, and the binding technique.
The type of binding wire used can vary, such as galvanized or black annealed wire.
The thickness of the steel bars also affects the quantity of binding wire required.
The binding technique, whether it is single or double binding, will de...
The cost of material and labor for a door frame with the size of 3"*4"*7' depends on various factors.
The cost of material will depend on the type of wood or material used for the door frame.
The cost of labor will depend on the hourly rate of the workers and the time required to complete the installation.
Additional costs may include transportation, tools, and any customization or finishing required.
To provide an accurat...
The pressure of CPVC pipe during water testing varies depending on the specific application and industry standards.
The pressure of CPVC pipe during water testing is typically measured in pounds per square inch (psi).
The specific pressure requirements may vary based on the intended use of the CPVC pipe, such as residential plumbing or industrial applications.
Industry standards, such as ASTM D1785 for CPVC pipes, provide...
The brand of CP sanitary used in my current project is XYZ.
The brand XYZ is known for its high-quality and durable CP sanitary products.
We chose XYZ brand for its wide range of options and competitive pricing.
The CP sanitary products from XYZ have been performing well in our project.
We have received positive feedback from the users regarding the XYZ brand.
posted on 30 Apr 2024
I applied via Naukri.com and was interviewed in Mar 2024. There were 2 interview rounds.
I am currently earning a CTC of $60,000 per year in my current employer.
My current CTC is $60,000 per year
I have been receiving this CTC for the past 2 years
I am open to negotiation for a higher CTC in a new role
Maintenance activities for DG set and hydel equipment involve regular inspections, servicing, and repairs to ensure optimal performance and longevity.
Regularly inspecting and testing the DG set and hydel equipment for any signs of wear or damage
Performing routine servicing such as oil changes, filter replacements, and lubrication
Conducting preventive maintenance to avoid unexpected breakdowns
Addressing any issues or ma...
posted on 17 May 2024
I applied via Approached by Company and was interviewed in Nov 2023. There were 3 interview rounds.
3 cases and its analysis in the claim managent perspective
posted on 27 May 2024
The stagnant height of DG refers to the maximum height at which a diesel generator can operate without overheating or malfunctioning.
Stagnant height of DG is determined by factors such as cooling system efficiency, ambient temperature, and load capacity.
For example, a diesel generator may have a stagnant height of 1000 meters, meaning it can operate effectively up to that altitude.
Regular maintenance and monitoring of ...
based on 3 reviews
Rating in categories
Senior Accountant
14
salaries
| ₹1.1 L/yr - ₹6.3 L/yr |
Legal Manager
12
salaries
| ₹6.5 L/yr - ₹15 L/yr |
Assistant Manager
12
salaries
| ₹3 L/yr - ₹6.6 L/yr |
Junior Engineer
12
salaries
| ₹1.8 L/yr - ₹4 L/yr |
Civil Site Engineer
11
salaries
| ₹2.2 L/yr - ₹4.8 L/yr |
L&T Construction
Simplex Infrastructures
ITD Cementation India
Ashoka Buildcon