HT panel CT and PT testing involves various steps to ensure accurate measurements.
Ensure the CT and PT are properly installed and connected.
Verify the primary and secondary windings of the CT and PT.
Perform ratio and polarity tests to confirm the accuracy of the CT and PT.
Check for any insulation issues or faults in the CT and PT.
Perform burden and accuracy tests to evaluate the performance of the CT and PT.
Record...
PR can be calculated by dividing the number of mentions or citations of a person, product, or brand by the total number of mentions or citations in a given time period.
PR = Number of mentions or citations / Total number of mentions or citations
PR is often used to measure the visibility and reputation of a person, product, or brand
For example, if a company is mentioned 100 times in the media and there are a total o...
The nepoint voltage is the voltage at which a material transitions from being an insulator to a conductor.
Nepoint voltage is also known as the breakdown voltage or dielectric strength.
It is the voltage required to cause a significant increase in the conductivity of an insulating material.
The nepoint voltage depends on the properties of the material, such as its thickness and composition.
It is an important paramete...
Transformer stability test is performed to ensure the reliable operation of the transformer under various operating conditions.
Transformer stability test involves subjecting the transformer to different load conditions and monitoring its performance.
The test is conducted to assess the ability of the transformer to withstand variations in load and maintain voltage regulation.
During the test, the transformer is oper...
Our plant has a capacity of 100,000 units per month.
Our plant can produce up to 100,000 units per month.
We have the capability to meet high production demands.
Our plant's capacity allows us to fulfill customer orders efficiently.
We have optimized our processes to maximize production output.
The inverter make and capacity is not available.
I don't have the available data for the inverter make and capacity.
Unfortunately, I cannot provide any information regarding the inverter make and capacity.
I apologize, but I don't have access to the details of the inverter make and capacity.
Plant availability formula calculates the percentage of time a plant is available for operation.
Plant availability = (Operating hours / Total hours) * 100
Operating hours: the total number of hours the plant is operational
Total hours: the total number of hours in a given time period
Example: If a plant operates for 18 hours out of 24 hours in a day, the availability would be (18/24) * 100 = 75%
The capacity of my transformer is 500 kVA.
The capacity of a transformer is measured in kilovolt-amperes (kVA).
The higher the kVA rating, the more power the transformer can handle.
For example, a 500 kVA transformer can handle a maximum load of 500,000 volt-amperes.
The capacity of a transformer is determined based on the anticipated power requirements of the electrical system it serves.
A shaft is a rotating machine element, usually circular in cross section, which is used to transmit power.
A shaft is a mechanical component used to transmit rotational motion or power.
It is typically a cylindrical rod or bar that rotates within a bearing or other support structure.
Shafts are commonly found in various machines and equipment, such as engines, motors, pumps, and turbines.
They are often made of materi...
Transformer stability test is performed to ensure the reliable operation of the transformer under various operating conditions.
Transformer stability test involves subjecting the transformer to different load conditions and monitoring its performance.
The test is conducted to assess the ability of the transformer to withstand variations in load and maintain voltage regulation.
During the test, the transformer is operated ...
The inverter make and capacity is not available.
I don't have the available data for the inverter make and capacity.
Unfortunately, I cannot provide any information regarding the inverter make and capacity.
I apologize, but I don't have access to the details of the inverter make and capacity.
HT panel CT and PT testing involves various steps to ensure accurate measurements.
Ensure the CT and PT are properly installed and connected.
Verify the primary and secondary windings of the CT and PT.
Perform ratio and polarity tests to confirm the accuracy of the CT and PT.
Check for any insulation issues or faults in the CT and PT.
Perform burden and accuracy tests to evaluate the performance of the CT and PT.
Record and ...
The capacity of my transformer is 500 kVA.
The capacity of a transformer is measured in kilovolt-amperes (kVA).
The higher the kVA rating, the more power the transformer can handle.
For example, a 500 kVA transformer can handle a maximum load of 500,000 volt-amperes.
The capacity of a transformer is determined based on the anticipated power requirements of the electrical system it serves.
Plant availability formula calculates the percentage of time a plant is available for operation.
Plant availability = (Operating hours / Total hours) * 100
Operating hours: the total number of hours the plant is operational
Total hours: the total number of hours in a given time period
Example: If a plant operates for 18 hours out of 24 hours in a day, the availability would be (18/24) * 100 = 75%
Our plant has a capacity of 100,000 units per month.
Our plant can produce up to 100,000 units per month.
We have the capability to meet high production demands.
Our plant's capacity allows us to fulfill customer orders efficiently.
We have optimized our processes to maximize production output.
The nepoint voltage is the voltage at which a material transitions from being an insulator to a conductor.
Nepoint voltage is also known as the breakdown voltage or dielectric strength.
It is the voltage required to cause a significant increase in the conductivity of an insulating material.
The nepoint voltage depends on the properties of the material, such as its thickness and composition.
It is an important parameter in ...
PR can be calculated by dividing the number of mentions or citations of a person, product, or brand by the total number of mentions or citations in a given time period.
PR = Number of mentions or citations / Total number of mentions or citations
PR is often used to measure the visibility and reputation of a person, product, or brand
For example, if a company is mentioned 100 times in the media and there are a total of 100...
A shaft is a rotating machine element, usually circular in cross section, which is used to transmit power.
A shaft is a mechanical component used to transmit rotational motion or power.
It is typically a cylindrical rod or bar that rotates within a bearing or other support structure.
Shafts are commonly found in various machines and equipment, such as engines, motors, pumps, and turbines.
They are often made of materials l...
Top trending discussions
I applied via Naukri.com and was interviewed in Jan 2021. There were 3 interview rounds.
posted on 27 May 2024
I applied via Referral and was interviewed before May 2023. There was 1 interview round.
Experienced Senior Engineer with a strong background in software development, project management, and team leadership.
Over 10 years of experience in software engineering, focusing on full-stack development.
Led a team of 5 engineers in developing a scalable e-commerce platform, increasing sales by 30%.
Implemented Agile methodologies, resulting in a 25% reduction in project delivery time.
Worked on cross-functional teams ...
posted on 30 Apr 2021
I applied via Walk-in and was interviewed in Apr 2021. There was 1 interview round.
Precast structures are pre-made concrete elements used in construction.
Precast segments are manufactured off-site and transported to the construction site for assembly.
They are commonly used in bridge construction, tunnels, and other large-scale infrastructure projects.
Precast segments can be designed to fit specific project requirements, reducing construction time and costs.
They offer high durability and strength, and...
Segment casting can be done using various methods depending on the material and application.
One method is sand casting, where a mold is created using sand and the molten metal is poured into it.
Another method is investment casting, where a wax pattern is created and coated with ceramic before the metal is poured.
Die casting is a method where molten metal is forced into a mold under high pressure.
Continuous casting is u...
Grade of concrete refers to its strength and durability.
Grade of concrete is denoted by a number followed by 'M' which stands for mix.
The number represents the compressive strength of concrete in megapascals (MPa).
Common grades of concrete include M10, M20, M30, etc.
Higher grade concrete has higher strength and durability.
For example, M20 grade concrete has a compressive strength of 20 MPa.
Design mix of concrete refers to the proportion of materials used in making concrete.
Design mix is determined based on the strength and durability requirements of the concrete.
The mix includes cement, water, aggregates (sand, gravel, crushed stone), and sometimes admixtures.
The proportions of each material are specified in terms of weight or volume.
For example, a common mix for general use is 1:2:3 (cement:sand:gravel)...
Segment casting is a method of casting concrete segments for tunnel lining.
Segments are cast in a factory and transported to the tunnel site.
Segments are then assembled to form a complete tunnel lining.
This method is commonly used in tunnel construction projects.
It allows for faster construction and better quality control.
Examples include the Channel Tunnel and the SMART Tunnel in Malaysia.
posted on 11 Dec 2023
I applied via Referral
I applied via Approached by Company and was interviewed in Feb 2023. There were 3 interview rounds.
posted on 22 Feb 2022
I appeared for an interview in May 2025, where I was asked the following questions.
In my current role, I lead engineering projects, mentor junior engineers, and ensure high-quality deliverables.
Led a team of 5 engineers in developing a scalable web application, improving performance by 30%.
Implemented Agile methodologies, resulting in a 25% increase in project delivery speed.
Mentored junior engineers, helping them improve their coding skills and understanding of best practices.
Collaborated with cross...
Yes, I have experience working under pressure and have developed coping mechanisms.
I have worked on projects with tight deadlines and high stakes.
I prioritize tasks and communicate effectively with team members to ensure smooth operations.
I practice stress-reducing techniques such as meditation and exercise.
I remain calm and focused in high-pressure situations.
For example, during a project for a major client, we encoun...
I applied via Referral and was interviewed before Jan 2022. There were 3 interview rounds.
based on 1 review
Rating in categories
Assistant Manager
40
salaries
| ₹6.4 L/yr - ₹14 L/yr |
Deputy Manager
36
salaries
| ₹11.3 L/yr - ₹18.3 L/yr |
Senior Manager
26
salaries
| ₹13 L/yr - ₹34 L/yr |
Manager
24
salaries
| ₹13.1 L/yr - ₹24.3 L/yr |
Electrical Engineer
15
salaries
| ₹2.4 L/yr - ₹5.8 L/yr |
Nasser S. Al Hajri Corporation
Navayuga Engineering Company
B.L. Kashyap & Sons
L & W Constructions