Filter interviews by
I applied via Approached by Company and was interviewed before Feb 2023. There was 1 interview round.
Top trending discussions
VA is value analysis, while VE is value engineering. Both are cost-saving techniques used in product development.
VA is a systematic review of a product's components and functions to identify areas where cost can be reduced without affecting performance.
VE is a more comprehensive approach that involves rethinking the entire product design to achieve cost savings while improving performance.
VA is typically used in the ea...
The cost of plastic molding components can be calculated by considering factors such as material cost, tooling cost, labor cost, and overhead cost.
Determine the material cost per unit of the component
Calculate the tooling cost, which includes the cost of the mold and any necessary equipment
Factor in the labor cost, which includes the cost of operating the molding machine and any necessary labor for finishing and assemb...
Polymers are large molecules made up of repeating units called monomers. They have a wide range of applications in various fields.
Polyethylene
Polypropylene
Polyvinyl chloride
Polystyrene
Polyester
Polyurethane
Nylon
Teflon
Silicone
Rubber
posted on 21 Mar 2025
I appeared for an interview before Mar 2024, where I was asked the following questions.
HPDC stands for High Pressure Die Casting, a process used to produce complex metal parts by injecting molten metal into a mold under high pressure.
HPDC involves injecting molten metal into a steel mold cavity at high pressure.
The high pressure helps in filling the mold quickly and accurately, resulting in high precision parts.
This process is commonly used in automotive, aerospace, and electronics industries for produci...
APQP stands for Advanced Product Quality Planning, which is a phase-based approach to product development in the automotive industry.
APQP consists of five phases: Planning, Product Design, Process Design, Product and Process Validation, and Feedback and Continuous Improvement.
Each phase has specific deliverables and activities that must be completed before moving on to the next phase.
For example, in the Product Design ...
IATF (International Automotive Task Force) is a global organization that develops and maintains quality management standards for the automotive industry.
IATF collaborates with automotive manufacturers to create unified quality standards
IATF 16949 is the latest version of the standard, focusing on continuous improvement and defect prevention
Certification to IATF standards is often required for suppliers to automotive OE
The first was a technical screening, where I was asked to solve coding problems on a shared platform. The questions tested my ability to think on my feet, focusing on optimizing solutions and writing clean, maintainable code.
This was more interactive, involving a whiteboard session where I had to design a system from scratch. The interviewer challenged my assumptions and pushed me to consider edge cases, scalability, and performance. It was intense, but it made me appreciate the importance of clear, structured thinking.
I applied via Walk-in and was interviewed in May 2022. There were 4 interview rounds.
I appeared for an interview in Sep 2024, where I was asked the following questions.
I applied via Recruitment Consultant and was interviewed in Mar 2021. There were 3 interview rounds.
SAP is an enterprise resource planning software used for managing business operations and customer relations.
SAP stands for Systems, Applications, and Products in Data Processing
It is used by companies to manage their business operations such as finance, sales, procurement, and inventory management
SAP also offers customer relationship management (CRM) software to manage interactions with customers
It is widely used in i...
I use various Tcodes depending on the task at hand.
For material master data maintenance, I use MM01, MM02, and MM03.
For purchase order creation and maintenance, I use ME21N and ME22N.
For inventory management, I use MIGO and MB51.
For production planning, I use MD61 and MD04.
For quality management, I use QA32 and QE51.
For sales and distribution, I use VA01, VA02, and VA03.
To punch production in SAP, follow these steps:
Create a production order in SAP
Release the production order
Confirm the production order
Perform goods receipt for the production order
Perform goods issue for the production order
based on 1 interview
Interview experience
Assistant Manager
56
salaries
| ₹4.5 L/yr - ₹10.5 L/yr |
Assistant Engineer
53
salaries
| ₹2 L/yr - ₹4.1 L/yr |
Production Engineer
46
salaries
| ₹1.6 L/yr - ₹4.8 L/yr |
Engineer
36
salaries
| ₹2.4 L/yr - ₹5.1 L/yr |
Quality Engineer
36
salaries
| ₹1 L/yr - ₹4.5 L/yr |
Knorr-Bremse
Greaves Cotton
Sanden Vikas
Victora Auto Private Limited