posted on 1 Dec 2024
I applied via Walk-in and was interviewed in Nov 2024. There were 2 interview rounds.
Folks,
Prepare the below topics very well.
1. Engineering mechanics
2. GD and T
3. Strength of materials
4. Manufacturing process
5. Tolerance stack up analysis
6. Engineering drawing
I had prepared them but still unable to clear the paper cause questions were tricky enough to answer.
I hope this helps you better for practice.
All the best “Brothers, Sister and Friends”.
I applied via Approached by Company and was interviewed in Nov 2024. There were 2 interview rounds.
General knowledge must be need during position oponinent
To find the 3rd highest salary in a database, we can use a SQL query with the ORDER BY and LIMIT clauses.
Write a SQL query to select distinct salaries from the database table.
Use the ORDER BY clause to sort the salaries in descending order.
Add the LIMIT 2,1 clause to skip the first two highest salaries and select the third highest salary.
Execute the query to retrieve the 3rd highest salary from the database.
I applied via Times Job
OEE is a measure of how well a manufacturing process is utilized, calculated by multiplying availability, performance, and quality.
OEE is calculated by multiplying Availability x Performance x Quality.
Availability measures the percentage of time the equipment is running during planned production time.
Performance measures the speed at which the equipment is running compared to its maximum speed.
Quality measures the good...
5S is a methodology for organizing a workplace for efficiency and effectiveness by identifying and storing items used, maintaining the area and items, and sustaining the new order.
Sort: Separate needed tools, parts, and instructions from unneeded items. Remove unnecessary items from the work area.
Set in order: Arrange items so they are easy to use. Identify and locate items with labels and visual controls.
Shine: Clean ...
We are currently working on drilling, milling, tapping, and slotting machining processes.
Drilling involves creating holes in a workpiece using a rotating cutting tool.
Milling is the process of removing material from a workpiece using a rotating cutter.
Tapping is the process of creating internal threads in a hole.
Slotting involves cutting slots or grooves in a workpiece.
Setting up a new machine for production involves installing necessary software, configuring settings, and testing functionality.
Install required operating system and software
Configure network settings and security measures
Test machine functionality to ensure it meets production requirements
8D is a problem-solving methodology used to identify, correct, and prevent recurring problems. SPC stands for Statistical Process Control.
8D is an eight-step problem-solving process used to address and prevent recurring issues in a systematic manner.
SPC is a method of quality control which uses statistical tools to monitor and control a process.
Examples of SPC tools include control charts, histograms, and scatter diagr
Kaizens are continuous improvement initiatives aimed at enhancing processes and efficiency. The number of completed kaizens in a year reflects the organization's commitment to improvement.
Kaizens are small, incremental changes made to processes to improve efficiency and quality.
They are typically implemented by cross-functional teams and involve brainstorming, testing, and implementing solutions.
Examples of kaizens inc...
I applied via Company Website and was interviewed in Sep 2024. There were 3 interview rounds.
General aptitude test
A semiconductor is a material that has electrical conductivity between a conductor and an insulator.
Semiconductors are used in electronic devices like transistors, diodes, and integrated circuits.
They have a band gap that allows them to conduct electricity under certain conditions.
Common semiconductor materials include silicon, germanium, and gallium arsenide.
I was interviewed in Oct 2024.
Sold to party refers to the customer who is purchasing the product, while ship to party is the location where the product will be delivered.
Sold to party is the customer who places the order and pays for the product.
Ship to party is the location where the product will be delivered, which may be different from the sold to party.
For example, a customer (sold to party) in New York may order a product to be shipped to thei
I was responsible for managing orders, ensuring timely delivery, and resolving any issues that arose.
Managed incoming orders and processed them in a timely manner
Coordinated with various departments to ensure orders were fulfilled correctly
Resolved any issues or discrepancies with orders
Communicated with customers regarding order status and delivery timelines
posted on 1 Aug 2024
posted on 26 Sep 2024
I applied via Walk-in and was interviewed in Aug 2024. There were 2 interview rounds.
I have 5 years of experience in retail management with a current CTC of $60,000.
5 years of experience in retail management
Current CTC of $60,000
Managed a team of 15 employees
Implemented successful sales strategies
Received Employee of the Year award in 2019
Indian Army
Indian Air Force
Tata Advanced Systems