OEE is a measure of how well a manufacturing process is utilized, calculated by multiplying availability, performance, and quality.
OEE is calculated by multiplying Availability x Performance x Quality.
Availability measures the percentage of time the equipment is running during planned production time.
Performance measures the speed at which the equipment is running compared to its maximum speed.
Quality measures the good...
5S is a methodology for organizing a workplace for efficiency and effectiveness by identifying and storing items used, maintaining the area and items, and sustaining the new order.
Sort: Separate needed tools, parts, and instructions from unneeded items. Remove unnecessary items from the work area.
Set in order: Arrange items so they are easy to use. Identify and locate items with labels and visual controls.
Shine: Clean ...
We are currently working on drilling, milling, tapping, and slotting machining processes.
Drilling involves creating holes in a workpiece using a rotating cutting tool.
Milling is the process of removing material from a workpiece using a rotating cutter.
Tapping is the process of creating internal threads in a hole.
Slotting involves cutting slots or grooves in a workpiece.
Setting up a new machine for production involves installing necessary software, configuring settings, and testing functionality.
Install required operating system and software
Configure network settings and security measures
Test machine functionality to ensure it meets production requirements
8D is a problem-solving methodology used to identify, correct, and prevent recurring problems. SPC stands for Statistical Process Control.
8D is an eight-step problem-solving process used to address and prevent recurring issues in a systematic manner.
SPC is a method of quality control which uses statistical tools to monitor and control a process.
Examples of SPC tools include control charts, histograms, and scatter diagr
Kaizens are continuous improvement initiatives aimed at enhancing processes and efficiency. The number of completed kaizens in a year reflects the organization's commitment to improvement.
Kaizens are small, incremental changes made to processes to improve efficiency and quality.
They are typically implemented by cross-functional teams and involve brainstorming, testing, and implementing solutions.
Examples of kaizens inc...
Top trending discussions
posted on 20 Feb 2021
I applied via Recruitment Consultant and was interviewed in Jan 2021. There were 4 interview rounds.
I applied via Recruitment Consultant and was interviewed in Oct 2021. There was 1 interview round.
posted on 21 Dec 2024
I applied via Recruitment Consulltant and was interviewed before Dec 2023. There were 3 interview rounds.
Interceptor concepts
posted on 1 Mar 2024
I applied via Campus Placement and was interviewed before Mar 2023. There were 2 interview rounds.
Basic aptitude questions
DSA, Core Java, Spring and Spring Boot, React, Agile methodologies
All good and organized very well
MT assessment and highly structured
posted on 28 Feb 2024
Was asked to write a program for linked list
I applied via Naukri.com and was interviewed in Sep 2021. There were 2 interview rounds.
I have designed various tooling elements and selected materials based on their properties and application requirements.
Designed tooling elements for manufacturing processes such as injection molding, stamping, and machining
Selected materials based on properties such as strength, durability, and heat resistance
Considered application requirements such as cost, weight, and environmental factors
Examples include designing i...
We use a combination of CNC machining and injection molding for our manufacturing process.
CNC machining is used for precision parts
Injection molding is used for high volume production
We also use 3D printing for prototyping
Our manufacturing process is constantly evolving to improve efficiency and quality
Surface finish requirement for tooling elements is critical for achieving desired product quality.
Surface finish affects the performance of the tooling element.
It impacts the appearance and functionality of the final product.
Surface finish is measured in Ra (roughness average) or Rz (roughness depth).
The required surface finish depends on the application and material being used.
For example, a mirror finish may be requi...
GD&T stands for Geometric Dimensioning and Tolerancing. It is a system of symbols and rules used to specify the geometry of mechanical parts.
GD&T is used to ensure that parts fit together correctly and function properly.
Some common symbols used in GD&T include concentricity, perpendicularity, and flatness.
GD&T is often used in industries such as aerospace, automotive, and manufacturing.
It allows for more precise commun...
based on 1 interview
Interview experience
Engineer
206
salaries
| ₹2 L/yr - ₹6 L/yr |
Lead Engineer
167
salaries
| ₹3.8 L/yr - ₹10 L/yr |
Junior Engineer
145
salaries
| ₹2 L/yr - ₹5.5 L/yr |
Quality Engineer
112
salaries
| ₹2.2 L/yr - ₹5.5 L/yr |
Deputy Manager
89
salaries
| ₹5.5 L/yr - ₹15 L/yr |
Indian Army
Indian Air Force
Tata Advanced Systems
Hindustan Aeronautics