Upload Button Icon Add office photos

LM Wind Power

Compare button icon Compare button icon Compare

Filter interviews by

LM Wind Power Site Engineer Interview Questions and Answers

Updated 5 Oct 2022

LM Wind Power Site Engineer Interview Experiences

1 interview found

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Basic all based on experience & there requirements
  • Q2. Experience & basic technical work like- transformer testing & PM checklist etc

Interview Preparation Tips

Interview preparation tips for other job seekers - brush up your basics, if having experience make sure you can justify that.

Interview questions from similar companies

I applied via Company Website and was interviewed before May 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. What is impidance,DGR FUNDAMENTAL AND BASICS
  • Ans. 

    Impedance is the measure of opposition to the flow of electric current in a circuit. DGR fundamental refers to the Dielectric Withstand Voltage test.

    • Impedance is measured in ohms and is the combination of resistance, capacitance, and inductance in a circuit.

    • DGR fundamental is a test to determine the maximum voltage a material can withstand without breaking down.

    • Basics of impedance include understanding the relationship...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Clear basics fundamental of electrical

I applied via Naukri.com and was interviewed in Nov 2021. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is impedance ,reacance
  • Ans. 

    Impedance is the total opposition to the flow of alternating current in a circuit, while reactance is the opposition to the flow of alternating current caused by capacitance or inductance.

    • Impedance is a combination of resistance and reactance in a circuit.

    • Reactance is the opposition to the flow of alternating current caused by capacitance or inductance.

    • Capacitive reactance is the opposition to the flow of alternating c...

  • Answered by AI
  • Q2. How calculate plant load factors
  • Ans. 

    Plant load factor is calculated by dividing the actual energy generated by the maximum possible energy that could have been generated.

    • Plant load factor = Actual energy generated / Maximum possible energy that could have been generated

    • Maximum possible energy is calculated by multiplying the rated capacity of the plant with the number of hours in a given time period

    • Plant load factor is expressed as a percentage

    • It is used...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Focus on fundamental, And answer with clear mindset

I applied via Walk-in and was interviewed in Mar 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. About salary breakups about current CTC:- Expected CTC:-

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview starts with full confidence not in over confidence. Keep your mind cool at time of interweaving

I applied via Approached by Company and was interviewed in Jul 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. All civil engineering construction into work site building construction
  • Q2. All civil engineering construction
  • Q3. RCC PCC into work from site experience on the civil engineering

Interview Preparation Tips

Interview preparation tips for other job seekers - Yes I am also told me that job with me civil engineering building construction All site work experience into Road & building work from site work

I appeared for an interview in Jan 2021.

Interview Questionnaire 

1 Question

  • Q1. Quality related questions, concrete grade,is code, billing,how to observe to any structure for quality engineer,how to problem identify and solve.

Interview Preparation Tips

Interview preparation tips for other job seekers - Clean ans. For any questions
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. What is ndc in MSA?
Round 2 - HR 

(1 Question)

  • Q1. How ho handle conflict within team

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Apr 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Electrical and electronics Power factor Motor
Round 3 - Technical 

(4 Questions)

  • Q1. What is sinosodal wave
  • Ans. 

    A sinusoidal wave is a type of wave that has a smooth, repetitive oscillation resembling a sine curve.

    • Sinusoidal waves are characterized by their amplitude, frequency, and phase.

    • They are commonly seen in AC electrical circuits, sound waves, and light waves.

    • The equation for a sinusoidal wave is typically represented as y = A*sin(2*pi*f*t + phi), where A is the amplitude, f is the frequency, t is time, and phi is the pha...

  • Answered by AI
  • Q2. What is peak factor
  • Ans. 

    Peak factor is the ratio of peak value to the RMS value of a waveform.

    • Peak factor is used to quantify the peakiness of a waveform.

    • It is calculated by dividing the peak value of the waveform by its RMS value.

    • A higher peak factor indicates a more peaky waveform with larger peaks relative to the average value.

    • Peak factor is important in signal processing and power systems analysis.

  • Answered by AI
  • Q3. What is motor Stator and rotor
  • Ans. 

    The stator and rotor are key components of an electric motor. The stator is the stationary part that generates a magnetic field, while the rotor is the rotating part that interacts with the magnetic field to produce motion.

    • Stator is the stationary part of an electric motor

    • Stator generates a magnetic field

    • Rotor is the rotating part of an electric motor

    • Rotor interacts with the magnetic field generated by the stator to pr

  • Answered by AI
  • Q4. Motor is a electrical machine and electrical energy convert mechanical energy

Interview Preparation Tips

Interview preparation tips for other job seekers - I am learning purpose job and best performance
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

90 question in 90 minutes are given

Round 3 - Technical 

(2 Questions)

  • Q1. 30 question in 30 minutes are given
  • Q2. Say something about your experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical knowledge should have been properly practice

I applied via Naukri.com and was interviewed in Mar 2021. There were 4 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. What are your roles in your current job
  • Ans. Explaned about my roles and responsibilities
  • Answered Anonymously
  • Q2. How do you tackle vibrations in axial fans
  • Ans. 

    To tackle vibrations in axial fans, proper balancing, alignment, and maintenance are essential.

    • Perform dynamic balancing of the fan blades to minimize vibrations.

    • Ensure proper alignment of the fan with the motor and the surrounding structure.

    • Regularly inspect and maintain the fan components to prevent wear and tear.

    • Use vibration analysis techniques to identify and address any potential issues.

    • Consider installing vibrat...

  • Answered by AI
  • Q3. What are the challenges you faced your job
  • Ans. Explained about our ID fan hydro coupling issue
  • Answered Anonymously
  • Q4. What permit system do you follow
  • Ans. 

    We follow a permit system based on the project requirements and local regulations.

    • Our permit system ensures compliance with safety standards and legal requirements.

    • We obtain permits for activities such as construction, electrical work, and hazardous material handling.

    • The specific permit requirements vary depending on the nature of the project and the location.

    • We work closely with regulatory authorities to ensure timely...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Know the constraints in your answer so that interviewer not go further into particular topic

LM Wind Power Interview FAQs

How many rounds are there in LM Wind Power Site Engineer interview?
LM Wind Power interview process usually has 2 rounds. The most common rounds in the LM Wind Power interview process are Technical and Resume Shortlist.
What are the top questions asked in LM Wind Power Site Engineer interview?

Some of the top questions asked at the LM Wind Power Site Engineer interview -

  1. experience & basic technical work like- transformer testing & PM checklist ...read more
  2. basic all based on experience & there requireme...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Adani Group Interview Questions
3.9
 • 196 Interviews
Tata Power Interview Questions
3.9
 • 164 Interviews
NTPC Interview Questions
4.2
 • 158 Interviews
Eaton Interview Questions
3.9
 • 122 Interviews
Vestas Interview Questions
4.2
 • 88 Interviews
Hitachi Energy Interview Questions
4.1
 • 85 Interviews
Siemens Energy Interview Questions
4.1
 • 75 Interviews
UTL Solar Interview Questions
3.5
 • 46 Interviews
L&T Power Interview Questions
3.9
 • 33 Interviews
View all
Production Operator
54 salaries
unlock blur

₹1.9 L/yr - ₹4.5 L/yr

Quality Controller
53 salaries
unlock blur

₹1.8 L/yr - ₹5.5 L/yr

Operator
30 salaries
unlock blur

₹1 L/yr - ₹4.3 L/yr

Team Lead
29 salaries
unlock blur

₹2.5 L/yr - ₹6 L/yr

Advanced Engineer
28 salaries
unlock blur

₹8.1 L/yr - ₹14 L/yr

Explore more salaries
Compare LM Wind Power with

Adani Group

3.9
Compare

NTPC

4.2
Compare

Tata Power

3.9
Compare

Eaton

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview