  • Q1. How you work in site engineering and how you manage
  • Ans. 

    As a Civil Site Incharge, I work in site engineering by overseeing construction projects and managing the site operations.

    • I coordinate with the project team to ensure smooth execution of construction activities.

    • I review and interpret engineering drawings and specifications to ensure compliance with project requirements.

    • I supervise and manage the work of subcontractors and laborers on site.

    • I monitor the progress of cons...

  • Answered by AI

Interview Preparation Tips

Round: Technical + HR Interview
Tips: we see a design and manage the work drawing by help of senior engineer and supervisor the day first all we see slopes of work in what cost of work brick work in what cost for registry the whole thing

Round: Test
Duration: 11 hours 5 minutes
Total Questions: 15

Interview questions from similar companies

I applied via Walk-in and was interviewed before Nov 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. About civil construction
  • Q2. About billing, management

Interview Preparation Tips

Interview preparation tips for other job seekers - Very good, brilliant,superb , great ,humbling nature, good knowledge
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is a beam ?
  • Ans. 

    A beam is a structural element that is designed to resist loads applied perpendicular to its longitudinal axis.

    • Beams are commonly used in construction to support loads over a span.

    • They can be made of various materials such as wood, steel, or concrete.

    • Beams can be classified based on their shape, such as I-beams, H-beams, or T-beams.

    • The design of a beam takes into account factors like span length, load requirements, and

  • Answered by AI
  • Q2. What is the Defrance between king post and qween post ?
  • Ans. 

    King post and queen post are both types of trusses used in construction, with king post being a simpler design and queen post being a more complex design.

    • King post is a simple vertical member in a truss, while queen post is a pair of vertical members connected by a horizontal member.

    • Queen post trusses are stronger and can span longer distances compared to king post trusses.

    • King post trusses are commonly used in small s...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Dilip Buildcon Junior Engineer Civil interview:
  • Management
  • Team Management
  • Excel
Interview preparation tips for other job seekers - A civil engineer is always a seeker.

Site Engineer Interview Questions & Answers

AECOM user image Babalpreet singh

posted on 2 May 2022

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before May 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. DAISCUSS ABOUT TECHNICAL ASPECTS OF CIVIL ENGINEERING AND SOFTWARE SKILLS
  • Q2. CODAL PROVISION OF CONCRETE AND COMMANDS OF SOFTWARE
  • Ans. 

    CODAL provisions for concrete refer to the guidelines and regulations set by relevant authorities, while commands of software are the specific instructions or functions within a software program.

    • CODAL provisions for concrete include specifications for mix design, strength requirements, and durability standards.

    • Commands of software for site engineers may include functions for structural analysis, quantity takeoff, and p...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Work enviourment is very fabulous
Interview experience
4
Good
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before May 2018. There were 2 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. What is Your Current Sallary.
  • Ans. 

    I am currently earning $60,000 per year.

    • My current salary is $60,000 per year.

    • I am satisfied with my current salary.

    • I believe my salary reflects my experience and qualifications.

  • Answered by AI
  • Q2. Expected salary
  • Q3. Negotiable sallary how much you negotiate.
  • Q4. Yourself Introduction.
  • Q5. About Your projects, experience and some technical question . I.e. procedure of work , productivity of workman and how to start your activities etc.

Interview Preparation Tips

You should be confident don't be nervous and Give your best.
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I applied via Referral and was interviewed in Aug 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. How to find grades of concrete which is already mixed
  • Ans. 

    Grades of concrete in a mixed batch can be estimated by performing a slump test and conducting compressive strength tests on samples.

    • Perform a slump test to determine the workability of the concrete mix.

    • Take samples from the mixed batch and cast test specimens for compressive strength testing.

    • Conduct compressive strength tests on the specimens to determine the grade of concrete.

    • Compare the test results with the standar

  • Answered by AI
  • Q2. What are the site and laboratory test on bricks and cement
  • Ans. 

    Site and laboratory tests on bricks and cement are essential for ensuring quality and durability of construction materials.

    • Site tests for bricks include visual inspection, water absorption test, compressive strength test, and efflorescence test.

    • Laboratory tests for bricks involve water absorption test, compressive strength test, efflorescence test, and soundness test.

    • Site tests for cement include checking the color, sm...

  • Answered by AI
  • Q3. Plastering work calculation for different size of wall
  • Ans. 

    Plastering work calculation involves determining the surface area of the wall and the thickness of the plaster.

    • Calculate the surface area of the wall by multiplying the height and length of each wall segment.

    • Determine the total surface area to be plastered by adding up the surface areas of all wall segments.

    • Multiply the total surface area by the desired thickness of the plaster to get the volume of plaster needed.

    • Consi...

  • Answered by AI

I applied via Walk-in and was interviewed before Sep 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Brick work plaster work tile work flooring work cladding work
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Monster and was interviewed before May 2020. There were 5 interview rounds.

Round 1 - Civil site activity 

(2 Questions)

  • Q1. Earth work activity
  • Q2. Road activity embt. Subgrad bes GSB , wmm DBM
Round 2 - One-on-one 

(3 Questions)

  • Q1. Concrete pouring
  • Q2. Earth work of road
  • Ans. 

    Earth work of road involves excavation, filling, compaction, and shaping of the ground to create a stable foundation for the road.

    • Excavation is the process of removing soil and rocks to create space for the road.

    • Filling involves adding suitable materials like gravel or crushed stones to level the ground.

    • Compaction is essential to ensure the filled materials are tightly packed and stable.

    • Shaping the ground involves grad...

  • Answered by AI
  • Q3. Pedestal j bolting
Round 3 - Group Discussion 

Descusosin of road concreting Massonary work

Round 4 - HR 

(2 Questions)

  • Q1. Noida international airport Noida
  • Q2. Airside Earth work activity
Round 5 - Group Discussion 

Discuss of site civil activities

Interview Preparation Tips

Interview preparation tips for other job seekers - Civil site working experience
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in May 2022. There were 4 interview rounds.

Interview Questionnaire 

6 Questions

  • Q1. This round is Salary Negotiation round
  • Q2. 1- Questions are related to your current status.
  • Q3. 2- Questions are related to your previous experiences
  • Q4. 3- About your current CTC and expectations.
  • Q5. 4- some Basic questions like+ a)- Why do you want leave your current org. b)- Why there is a gap between your career Etc. You can find a list of basic interview questions by searching online.
  • Q6. Most of The time first question will be Tell me About yourself
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - One-on-one 

(5 Questions)

  • Q1. I am civil foreman my total experience in 15 years
  • Q2. My experience in structure work most MNB, MJB, ROB, flyover, bridge and metro work
  • Q3. My interview is any question structure work
  • Q4. Sir plz your questions I am answer
  • Q5. I am nothing question
Round 3 - Aptitude Test 

My aptitude in working aptitude nothing people attitude

Interview Preparation Tips

Interview preparation tips for other job seekers - Sir my advice is working in progress
And first quality and safety and progress
Total Workman PPE and toolbox most daily basis workplace

Tell us how to improve this page.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 700 Interviews
Tata Projects Interview Questions
4.2
 • 406 Interviews
KEC International Interview Questions
4.1
 • 287 Interviews
Tata Technologies Interview Questions
3.6
 • 252 Interviews
TCE Interview Questions
3.8
 • 242 Interviews
View all
Compare Leighs Construction with

Larsen & Toubro Limited

4.0
Compare

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Megha Engineering & Infrastructures

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview