Upload Button Icon Add office photos

L&T Power

Compare button icon Compare button icon Compare

Filter interviews by

Clear (1)

L&T Power Technical Solutions Engineer Interview Questions and Answers

Updated 16 Aug 2024

L&T Power Technical Solutions Engineer Interview Experiences

1 interview found

Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Newspaper Ad and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - Technical 

(8 Questions)

  • Q1. Technical answer
  • Q2. Rcc, Finishing, Excavation, Levelling, planning
  • Q3. Safety and Quality work
  • Q4. Client satisfaction
  • Q5. Civil construction supervision
  • Q6. Safety, Quality and daily, weekly and Monthly planning labours and resource monitoring
  • Q7. Civil construction Project work supervision
  • Q8. Safety, Quality and daily, weekly and Monthly planning labours and resource monitoring

Interview Preparation Tips

Topics to prepare for L&T Power Technical Solutions Engineer interview:
  • Labour monitring, Resource,, skt
Interview preparation tips for other job seekers - Civil construction bottom to Top answar

Interview questions from similar companies

I was interviewed before Nov 2016.

Interview Questionnaire 

3 Questions

  • Q1. About yourself
  • Q2. Will you work at any location
  • Ans. 

    Yes, I am willing to work at any location for the Senior Engineer position.

    • I am open to relocating for the right opportunity

    • I have experience working in different locations

    • I am flexible and adaptable to new environments

  • Answered by AI
  • Q3. Why you think you can work in any adverse situation
  • Ans. 

    I have a proven track record of staying calm and focused in challenging situations, allowing me to problem-solve effectively.

    • I have experience working in high-pressure environments and have successfully delivered projects on time despite obstacles.

    • I am adaptable and can quickly assess a situation to determine the best course of action.

    • I have strong problem-solving skills and can think creatively to find solutions in ad

  • Answered by AI

Interview Preparation Tips

Round: Test
Duration: 1 hour
Total Questions: 100

Round: Group Discussion
Duration: 20 minutes

I applied via Approached by Company and was interviewed in Aug 2017. There were 5 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Basic Java questions. Coding based on technical topics in Java. Approach and knowledge of other technology apart from core strength like ui ,design .
  • Q2. Scenario based questions. Deeper into Java and related technologies
  • Q3. Again based on Java and project but kind of client interview
  • Q4. Basic hr questions and salary discussion

Interview Preparation Tips

Round: Managerial
Experience: More of past projects and team handling

General Tips: Be prepared for basics in related technology and good through understanding in one core area.
Skills: Communication, Problem Solving, Analytical Skills, Decision Making Skills
Duration: 1-3 Months

I applied via Naukri.com and was interviewed before Jun 2019. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Implement stack data structure
  • Ans. 

    Implement stack data structure

    • Use an array or linked list to store elements

    • Push operation adds element to top of stack

    • Pop operation removes element from top of stack

    • Peek operation returns top element without removing it

  • Answered by AI
  • Q2. How global variable work , how its shared by all function
  • Ans. 

    Global variables are accessible from any part of the program and can be modified by any function.

    • Global variables are declared outside of any function.

    • They can be accessed and modified by any function in the program.

    • If a function modifies the value of a global variable, the new value is visible to all other functions.

    • Global variables can be useful for sharing data between functions.

    • However, overuse of global variables

  • Answered by AI
  • Q3. Program to transpose the matrix
  • Ans. 

    Program to transpose a matrix

    • Iterate through rows and columns of the matrix

    • Swap the elements at (i,j) and (j,i) positions

    • Return the transposed matrix

  • Answered by AI
  • Q4. Internal implementation of pre and post fix operator
  • Ans. 

    Pre and post fix operators are used to increment or decrement a value before or after it is used in an expression.

    • Pre-fix operator (++x) increments the value of x and returns the new value.

    • Post-fix operator (x++) returns the value of x and then increments it.

    • Both operators can be used with variables of numeric data types.

    • They can also be used with pointers to increment or decrement the memory address they point to.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare some standard problem from geekforgeeks.com

Skills evaluated in this interview

I applied via Referral and was interviewed before Apr 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Maintenance phylosophy
  • Ans. Depends on equipment running hour, criticality, availability and standby.
  • Answered Anonymously

Interview Preparation Tips

Topics to prepare for Thermax Limited Senior Engineer interview:
  • Boe
  • Energy manager
Interview preparation tips for other job seekers - Be confidential and technically strong.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Jun 2024. There were 2 interview rounds.

Round 1 - Aptitude Test 

Tomarrow, power system

Round 2 - Assignment 

Machine power system drive

I applied via Company Website and was interviewed in Jan 2022. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Tell me about yourself.
  • Q2. Notice period of my present organisation
Round 2 - Technical 

(1 Question)

  • Q1. Site based question about TG Deck Slab, Ash Handling Package

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and if you r experienced like me, you should be well prepared about practical experience.

I applied via Recruitment Consulltant and was interviewed in Mar 2022. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. First your communication skill then your experience in your feild , and general questions, confidence level and your attitude

Interview Preparation Tips

Interview preparation tips for other job seekers - Your qualifications and your experience Bess questions

Interview Questionnaire 

6 Questions

  • Q1. Drum level transmitter
  • Q2. Boiler interlocking
  • Q3. Vibration sensors
  • Q4. Turbine parameters and interlocking
  • Q5. DCS tag assigning process
  • Ans. 

    DCS tag assigning process involves assigning unique names to process variables for monitoring and control.

    • DCS tag assigning process is crucial for efficient process control and monitoring.

    • Each tag represents a process variable and is assigned a unique name for easy identification.

    • Tags can be assigned manually or automatically based on the process requirements.

    • Tag naming conventions should be consistent and follow indus...

  • Answered by AI
  • Q6. Smart positioners like Simens Sipart 02

Interview Preparation Tips

Interview preparation tips for other job seekers - Just be confident don't nervous

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in May 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(6 Questions)

  • Q1. Which are the equipment used in steam turbine? And their principal and working and troubleshooting?
  • Ans. 

    Equipment used in steam turbine include turbine blades, nozzles, casing, rotor, bearings, and governor.

    • Turbine blades: convert steam energy into mechanical energy

    • Nozzles: control the flow of steam into the turbine

    • Casing: contains and directs the steam flow through the turbine

    • Rotor: connected to the turbine blades and rotates to generate power

    • Bearings: support the rotor and reduce friction

    • Governor: regulates the speed o

  • Answered by AI
  • Q2. Tell us about the Woodward 505 ?
  • Ans. 

    Woodward 505 is a versatile control system used in industrial applications.

    • The Woodward 505 is a widely used control system in industries such as power generation, oil and gas, and marine.

    • It offers advanced features like PID control, sequencing, and communication capabilities.

    • The Woodward 505 is known for its reliability and robustness in harsh operating environments.

    • It can be easily integrated with various types of se

  • Answered by AI
  • Q3. Explain the structure of the Honeywell DCS ?
  • Ans. 

    The Honeywell DCS (Distributed Control System) is a modular system consisting of controllers, I/O modules, and operator stations.

    • Consists of controllers, I/O modules, and operator stations

    • Uses a network to communicate between components

    • Allows for centralized control and monitoring of processes

    • Supports various communication protocols such as Modbus, OPC, etc.

    • Example: Honeywell Experion PKS

  • Answered by AI
  • Q4. What is PID and How does it work ?
  • Ans. 

    PID stands for Proportional-Integral-Derivative, a control loop feedback mechanism used in engineering.

    • PID is a control algorithm that calculates an error value as the difference between a desired setpoint and a measured process variable.

    • Proportional (P) control responds to the current error value.

    • Integral (I) control accumulates past errors to correct the present error.

    • Derivative (D) control predicts future errors bas...

  • Answered by AI
  • Q5. How to assign new chennal in Honeywell DCS ?
  • Ans. 

    To assign a new channel in Honeywell DCS, you need to access the configuration software and follow the steps to add the channel.

    • Access the Honeywell DCS configuration software

    • Navigate to the channel configuration section

    • Add a new channel by specifying the channel number, type, and other relevant parameters

    • Save the changes and verify the new channel is successfully assigned

  • Answered by AI
  • Q6. Tell the interlock and permissive of boiler and turbine?
  • Ans. 

    Interlocks and permissives are safety mechanisms in place to prevent unsafe operation of boiler and turbine systems.

    • Interlocks prevent certain actions from taking place unless specific conditions are met

    • Permissives allow certain actions to take place only if specific conditions are met

    • Example of interlock: Boiler feed pump interlock prevents the boiler from starting unless the feed pump is running

    • Example of permissive:...

  • Answered by AI

Skills evaluated in this interview

Contribute & help others!
anonymous
You can choose to be anonymous

L&T Power Interview FAQs

How many rounds are there in L&T Power Technical Solutions Engineer interview?
L&T Power interview process usually has 1 rounds. The most common rounds in the L&T Power interview process are Technical.
What are the top questions asked in L&T Power Technical Solutions Engineer interview?

Some of the top questions asked at the L&T Power Technical Solutions Engineer interview -

  1. Safety, Quality and daily, weekly and Monthly planning labours and resource mo...read more
  2. Rcc, Finishing, Excavation, Levelling, plann...read more
  3. Civil construction Project work supervisi...read more

Recently Viewed

INTERVIEWS

L&T Power

No Interviews

CAMPUS PLACEMENT

SRM university (SRMU)

INTERVIEWS

BigStep Technologies

5.6k top interview questions

INTERVIEWS

L&T Power

No Interviews

INTERVIEWS

L&T Power

No Interviews

INTERVIEWS

L&T Power

No Interviews

INTERVIEWS

BigStep Technologies

No Interviews

INTERVIEWS

MosChip Technologies

No Interviews

INTERVIEWS

MosChip Technologies

No Interviews

INTERVIEWS

L&T Power

No Interviews

Tell us how to improve this page.

L&T Power Technical Solutions Engineer Interview Process

based on 1 interview

Interview experience

1
  
Bad
View more

Interview Questions from Similar Companies

Siemens Interview Questions
4.1
 • 432 Interviews
Thermax Limited Interview Questions
4.1
 • 250 Interviews
Adani Power Interview Questions
3.9
 • 217 Interviews
Adani Group Interview Questions
3.9
 • 186 Interviews
Tata Power Interview Questions
3.9
 • 162 Interviews
NTPC Interview Questions
4.2
 • 159 Interviews
Suzlon Group Interview Questions
4.1
 • 129 Interviews
Torrent Power Interview Questions
3.7
 • 126 Interviews
Eaton Interview Questions
3.9
 • 118 Interviews
BHEL Interview Questions
4.1
 • 109 Interviews
View all
Assistant Manager
211 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
156 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Manager
105 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Engineer
69 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant General Manager
59 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare L&T Power with

BHEL

4.1
Compare

Thermax Limited

4.1
Compare

Siemens

4.1
Compare

Tata Power

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview